Southwest Airlines vol WN 2479: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu 08:15 Albuquerque (ABQ) 11:00 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2024-11-28
Mar,Mer 09:25 Albany (ALB) 10:35 Midway, Chicago (MDW)
WN 2479 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-08 through 2024-10-30
Sam 09:45 Albuquerque (ABQ) 12:25 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-11 through 2025-02-08
Sam 10:15 Burbank (BUR) 11:30 Las Vegas Harry Reid (LAS) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-09 through 2024-11-16
Sam 10:15 Burbank (BUR) 11:30 Las Vegas Harry Reid (LAS) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-07 through 2024-12-14
Mar,Mer 11:15 Midway, Chicago (MDW) 13:10 Las Vegas Harry Reid (LAS) 1
WN 2479 Non-stop Boeing 737-700 (73W) 3:55 Effective 2024-10-08 through 2024-10-30
Jeu 11:40 Love Field, Dallas (DAL) 1 12:50 Little Rock (LIT)
WN 2479 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-11-28
Sam 12:10 Las Vegas Harry Reid (LAS) 1 14:40 Albuquerque (ABQ)
WN 2479 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-11-09 through 2024-11-16
Sam 12:10 Las Vegas Harry Reid (LAS) 1 14:40 Albuquerque (ABQ)
WN 2479 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-12-07 through 2024-12-14
Sam 13:05 Love Field, Dallas (DAL) 1 14:10 Austin (AUS)
WN 2479 Non-stop Boeing 737-700 (73W) 1:05 Effective 2025-01-11 through 2025-02-08
Sam 13:05 Long Beach (LGB) 15:50 Albuquerque (ABQ)
WN 2479 Non-stop Boeing 737-700 (73W) 1:45 Effective 2025-02-15 through 2025-03-01
Sam 13:10 Austin (AUS) 14:05 Las Vegas Harry Reid (LAS) 1
WN 2479 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-10-05 through 2024-11-02
Mar,Mer 13:50 Las Vegas Harry Reid (LAS) 1 15:15 Santa Ana (SNA)
WN 2479 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-08 through 2024-10-30
Lun-Ven 14:20 Albuquerque (ABQ) 17:00 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 14:20 Albuquerque (ABQ) 17:00 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-19 through 2025-01-24
Lun-Ven 14:20 Albuquerque (ABQ) 17:00 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 14:20 Albuquerque (ABQ) 17:00 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-02-09 through 2025-02-12
Mar,Mer 14:20 Albuquerque (ABQ) 17:00 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-02-19 through 2025-03-05
Sam 14:45 Las Vegas Harry Reid (LAS) 1 16:00 Santa Ana (SNA)
WN 2479 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-05 through 2024-11-02
Sam 15:15 Albuquerque (ABQ) 17:55 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-11-09 through 2024-11-16
Sam 15:15 Albuquerque (ABQ) 17:55 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-12-07 through 2024-12-14
Jeu,Ven,Dim 15:35 Albuquerque (ABQ) 18:15 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-01-12 through 2025-01-17
Lun,Dim 15:35 Albuquerque (ABQ) 18:15 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 15:35 Albuquerque (ABQ) 18:15 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-02 through 2025-02-07
Lun 15:35 Albuquerque (ABQ) 18:15 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2025-02-10
Lun,Mar,Jeu 15:35 Albuquerque (ABQ) 18:15 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-18 through 2025-02-24
Lun 15:35 Albuquerque (ABQ) 18:15 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2025-03-03
Dim 16:10 Greenville/Spartanburg (GSP) 17:35 Houston Hobby (HOU)
WN 2479 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-09-01
Sam 16:25 Albuquerque (ABQ) 19:10 Love Field, Dallas (DAL) 1
WN 2479 Non-stop Boeing 737-700 (73W) 1:45 Effective 2025-02-15 through 2025-03-01
Sam 16:35 Santa Ana (SNA) 17:55 San Jose (SJC) B
WN 2479 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-10-05 through 2024-11-02
Jeu,Ven,Dim 17:05 Phoenix Sky Harbor (PHX) 4 17:35 Los Angeles (LAX) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 17:05 Phoenix Sky Harbor (PHX) 4 17:35 Los Angeles (LAX) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-11-11 through 2024-11-25
Ven,Dim 17:05 Phoenix Sky Harbor (PHX) 4 17:35 Los Angeles (LAX) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-12-08 through 2024-12-15
Jeu 17:05 Phoenix Sky Harbor (PHX) 4 17:35 Los Angeles (LAX) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-12-19
Ven 17:05 Phoenix Sky Harbor (PHX) 4 17:35 Los Angeles (LAX) 1
WN 2479 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2025-01-03
Sam 17:10 San Diego (SAN) 1 18:35 Tucson (TUS)
WN 2479 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Valid until 2024-09-28
Lun,Jeu,Ven 17:55 Portland (PWM) 19:30 Baltimore (BWI)
WN 2479 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Valid until 2024-09-06
Lun,Jeu,Ven 17:55 Portland (PWM) 19:30 Baltimore (BWI)
WN 2479 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-09-09 through 2024-09-27
Lun 17:55 Portland (PWM) 19:30 Baltimore (BWI)
WN 2479 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2024-09-30
Mar,Mer 18:00 Portland (PWM) 19:35 Baltimore (BWI)
WN 2479 Non-stop Boeing 737-700 (73W) 1:35 Valid until 2024-10-02
Dim 21:00 Baltimore (BWI) 22:45 Savannah (SAV)
WN 2479 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-09-08 through 2024-09-29
Vols indirects:
Jeu 08:15 Albuquerque (ABQ) 12:50 Little Rock (LIT)
WN 2479 1-stop Boeing 737-700 (73W) 3:35 Operates only on 2024-11-28
Mar,Mer 09:25 Albany (ALB) 13:10 Las Vegas Harry Reid (LAS) 1
WN 2479 1-stop Boeing 737-700 (73W) 6:45 Effective 2024-10-08 through 2024-10-30
Sam 09:45 Albuquerque (ABQ) 14:10 Austin (AUS)
WN 2479 1-stop Boeing 737-700 (73W) 3:25 Effective 2025-01-11 through 2025-02-08
Sam 10:15 Burbank (BUR) 14:40 Albuquerque (ABQ)
WN 2479 1-stop Boeing 737-700 (73W) 3:25 Effective 2024-11-09 through 2024-11-16
Sam 10:15 Burbank (BUR) 14:40 Albuquerque (ABQ)
WN 2479 1-stop Boeing 737-700 (73W) 3:25 Effective 2024-12-07 through 2024-12-14
Mar,Mer 11:15 Midway, Chicago (MDW) 15:15 Santa Ana (SNA)
WN 2479 1-stop Boeing 737-700 (73W) 6:00 Effective 2024-10-08 through 2024-10-30
Sam 12:10 Las Vegas Harry Reid (LAS) 1 17:55 Love Field, Dallas (DAL) 1
WN 2479 1-stop Boeing 737-700 (73W) 3:45 Effective 2024-11-09 through 2024-11-16
Sam 12:10 Las Vegas Harry Reid (LAS) 1 17:55 Love Field, Dallas (DAL) 1
WN 2479 1-stop Boeing 737-700 (73W) 3:45 Effective 2024-12-07 through 2024-12-14
Sam 13:05 Long Beach (LGB) 19:10 Love Field, Dallas (DAL) 1
WN 2479 1-stop Boeing 737-700 (73W) 4:05 Effective 2025-02-15 through 2025-03-01
Sam 13:10 Austin (AUS) 16:00 Santa Ana (SNA)
WN 2479 1-stop Boeing 737-700 (73W) 4:50 Effective 2024-10-05 through 2024-11-02
Sam 14:45 Las Vegas Harry Reid (LAS) 1 17:55 San Jose (SJC) B
WN 2479 1-stop Boeing 737-700 (73W) 3:10 Effective 2024-10-05 through 2024-11-02
Mar,Mer 09:25 Albany (ALB) 15:15 Santa Ana (SNA)
WN 2479 2-stop Boeing 737-700 (73W) 8:50 Effective 2024-10-08 through 2024-10-30
Sam 10:15 Burbank (BUR) 17:55 Love Field, Dallas (DAL) 1
WN 2479 2-stop Boeing 737-700 (73W) 5:40 Effective 2024-11-09 through 2024-11-16
Sam 10:15 Burbank (BUR) 17:55 Love Field, Dallas (DAL) 1
WN 2479 2-stop Boeing 737-700 (73W) 5:40 Effective 2024-12-07 through 2024-12-14
Sam 13:10 Austin (AUS) 17:55 San Jose (SJC) B
WN 2479 2-stop Boeing 737-700 (73W) 6:45 Effective 2024-10-05 through 2024-11-02
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2479: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2479
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2479
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2479
Valid until 2024-09-06
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2479
Effective 2024-09-09 through 2024-09-27
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Operates only on 2024-09-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2479
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Vols indirects:

Southwest Airlines WN2479
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 8:50, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:40, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:40, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2479
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Albany (ALB) - Las Vegas Harry Reid (LAS)
  • Albany (ALB) - Midway, Chicago (MDW)
  • Albany (ALB) - Santa Ana (SNA)
  • Albuquerque (ABQ) - Austin (AUS)
  • Albuquerque (ABQ) - Little Rock (LIT)
  • Albuquerque (ABQ) - Love Field, Dallas (DAL)
  • Austin (AUS) - Las Vegas Harry Reid (LAS)
  • Austin (AUS) - San Jose (SJC)
  • Austin (AUS) - Santa Ana (SNA)
  • Baltimore (BWI) - Savannah (SAV)
  • Burbank (BUR) - Albuquerque (ABQ)
  • Burbank (BUR) - Las Vegas Harry Reid (LAS)
  • Burbank (BUR) - Love Field, Dallas (DAL)
  • Greenville/Spartanburg (GSP) - Houston Hobby (HOU)
  • Las Vegas Harry Reid (LAS) - Albuquerque (ABQ)
  • Las Vegas Harry Reid (LAS) - Love Field, Dallas (DAL)
  • Las Vegas Harry Reid (LAS) - San Jose (SJC)
  • Las Vegas Harry Reid (LAS) - Santa Ana (SNA)
  • Long Beach (LGB) - Albuquerque (ABQ)
  • Long Beach (LGB) - Love Field, Dallas (DAL)
  • Love Field, Dallas (DAL) - Austin (AUS)
  • Love Field, Dallas (DAL) - Little Rock (LIT)
  • Midway, Chicago (MDW) - Las Vegas Harry Reid (LAS)
  • Midway, Chicago (MDW) - Santa Ana (SNA)
  • Phoenix Sky Harbor (PHX) - Los Angeles (LAX)
  • Portland (PWM) - Baltimore (BWI)
  • San Diego (SAN) - Tucson (TUS)
  • Santa Ana (SNA) - San Jose (SJC)