Southwest Airlines vol WN 2426: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Dim 05:30 Indianapolis (IND) 07:45 Orlando (MCO)
WN 2426 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-03-10 through 2024-04-07
Lun,Jeu,Ven 05:35 Indianapolis (IND) 07:50 Orlando (MCO)
WN 2426 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-03-07 through 2024-04-08
Mar,Mer,Sam 05:45 Indianapolis (IND) 08:00 Orlando (MCO)
WN 2426 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-03-09 through 2024-04-06
Sam 06:15 Charleston (CHS) 07:30 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-01-06
Ven 08:25 Sacramento (SMF) B 09:50 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2426 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2024-07-05
Dim 12:45 Portland (PDX) 18:40 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-800 (73H) 3:55 Operates only on 2024-09-01
Dim 14:00 Portland (PDX) 19:55 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-800 (73H) 3:55 Effective 2024-08-11 through 2024-08-25
Dim 14:00 Portland (PDX) 19:55 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-800 (73H) 3:55 Effective 2024-09-08 through 2024-09-29
Mar,Mer 16:00 Portland (PDX) 22:00 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-700 (73W) 4:00 Effective 2024-08-06 through 2024-10-02
Lun,Dim 17:05 Charleston (CHS) 18:25 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-700 (73W) 2:20 Valid until 2024-01-01
Mer-Ven 17:05 Charleston (CHS) 18:25 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-01-03 through 2024-01-05
Dim 17:05 Boise (BOI) 18:25 San Diego (SAN) 1
WN 2426 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-05-26
Dim 17:20 Boise (BOI) 18:40 San Diego (SAN) 1
WN 2426 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-04-14 through 2024-05-19
Dim 17:20 Boise (BOI) 18:40 San Diego (SAN) 1
WN 2426 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-06-02
Lun,Jeu,Ven 17:25 Portland (PDX) 23:25 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-700 (73W) 4:00 Effective 2024-08-05 through 2024-09-30
Lun,Jeu,Ven 17:30 George Bush, Houston (IAH) A 18:45 Love Field, Dallas (DAL) 1
WN 2426 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-01-08 through 2024-03-04
Dim 17:35 Charleston (CHS) 18:55 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-01-07
Dim 19:00 San Diego (SAN) 1 21:45 Albuquerque (ABQ)
WN 2426 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2024-05-26
Lun,Dim 19:10 Midway, Chicago (MDW) 21:55 George Bush, Houston (IAH) A
WN 2426 Non-stop Boeing 737-700 (73W) 2:45 Valid until 2024-01-01
Mer-Ven 19:10 Midway, Chicago (MDW) 21:55 George Bush, Houston (IAH) A
WN 2426 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-01-03 through 2024-01-05
Dim 19:10 Love Field, Dallas (DAL) 1 21:20 Midway, Chicago (MDW)
WN 2426 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-01-14 through 2024-03-03
Mar-Ven 19:15 Midway, Chicago (MDW) 22:00 George Bush, Houston (IAH) A
WN 2426 Non-stop Boeing 737-700 (73W) 2:45 Valid until 2024-01-02
Lun,Jeu,Ven 19:25 Love Field, Dallas (DAL) 1 21:15 Salt Lake City (SLC)
WN 2426 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-01-08 through 2024-03-04
Sam 20:10 Orlando (MCO) 22:05 Kansas City (MCI)
WN 2426 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-06-08 through 2024-08-03
Lun,Jeu,Ven 20:40 Orlando (MCO) 22:30 Kansas City (MCI)
WN 2426 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-06-06 through 2024-07-01
Lun,Jeu,Ven 20:40 Orlando (MCO) 22:30 Kansas City (MCI)
WN 2426 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-07-08 through 2024-08-02
Mar,Mer 21:00 Orlando (MCO) 22:55 Kansas City (MCI)
WN 2426 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-06-04 through 2024-07-31
Dim 21:55 Orlando (MCO) 23:55 Kansas City (MCI)
WN 2426 Non-stop Boeing 737-700 (73W) 3:00 Effective 2024-06-09 through 2024-08-04
Vols indirects:
Lun,Dim 17:05 Charleston (CHS) 21:55 George Bush, Houston (IAH) A
WN 2426 1-stop Boeing 737-700 (73W) 5:50 Valid until 2024-01-01
Mer-Ven 17:05 Charleston (CHS) 21:55 George Bush, Houston (IAH) A
WN 2426 1-stop Boeing 737-700 (73W) 5:50 Effective 2024-01-03 through 2024-01-05
Dim 17:05 Boise (BOI) 21:45 Albuquerque (ABQ)
WN 2426 1-stop Boeing 737-700 (73W) 4:40 Operates only on 2024-05-26
Lun,Jeu,Ven 17:30 George Bush, Houston (IAH) A 21:15 Salt Lake City (SLC)
WN 2426 1-stop Boeing 737-700 (73W) 4:45 Effective 2024-01-08 through 2024-03-04
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2426: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2426
Effective 2024-03-10 through 2024-04-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Effective 2024-03-07 through 2024-04-08
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Effective 2024-03-09 through 2024-04-06
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Operates only on 2024-01-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Operates only on 2024-07-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Effective 2024-08-11 through 2024-08-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2426
Effective 2024-08-06 through 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Valid until 2024-01-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-03 through 2024-01-05
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Operates only on 2024-05-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-04-14 through 2024-05-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Operates only on 2024-06-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-08-05 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-08 through 2024-03-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Operates only on 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Operates only on 2024-05-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Valid until 2024-01-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-03 through 2024-01-05
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-14 through 2024-03-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Valid until 2024-01-02
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-08 through 2024-03-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-06-08 through 2024-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-06-06 through 2024-07-01
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-07-08 through 2024-08-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-06-04 through 2024-07-31
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-06-09 through 2024-08-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:00, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN2426
Valid until 2024-01-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-03 through 2024-01-05
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Operates only on 2024-05-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2426
Effective 2024-01-08 through 2024-03-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:45, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Boise (BOI) - Albuquerque (ABQ)
  • Boise (BOI) - San Diego (SAN)
  • Charleston (CHS) - George Bush, Houston (IAH)
  • Charleston (CHS) - Midway, Chicago (MDW)
  • George Bush, Houston (IAH) - Love Field, Dallas (DAL)
  • George Bush, Houston (IAH) - Salt Lake City (SLC)
  • Indianapolis (IND) - Orlando (MCO)
  • Love Field, Dallas (DAL) - Midway, Chicago (MDW)
  • Love Field, Dallas (DAL) - Salt Lake City (SLC)
  • Midway, Chicago (MDW) - George Bush, Houston (IAH)
  • Orlando (MCO) - Kansas City (MCI)
  • Portland (PDX) - Midway, Chicago (MDW)
  • Sacramento (SMF) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • San Diego (SAN) - Albuquerque (ABQ)