Southwest Airlines vol WN 1979: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 06:35 San Jose (SJC) B 11:55 Austin (AUS)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2024-10-05 through 2024-11-02
Dim 06:40 New Orleans (MSY) 08:30 Denver (DEN)
WN 1979 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-09-08 through 2024-09-29
Jeu,Ven,Dim 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-11-11 through 2024-11-25
Ven,Dim 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-12-08 through 2024-12-15
Jeu 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2024-12-19
Ven 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-01-03
Lun,Jeu,Ven,Dim 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 10:25 Midland (MAF) 11:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-21 through 2025-03-02
Jeu,Ven,Dim 10:35 Midland (MAF) 11:55 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-12 through 2025-01-17
Lun,Dim 10:35 Midland (MAF) 11:55 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 10:35 Midland (MAF) 11:55 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-02 through 2025-02-07
Lun 10:35 Midland (MAF) 11:55 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-02-10
Lun,Mar,Jeu 10:35 Midland (MAF) 11:55 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-18 through 2025-02-24
Lun 10:35 Midland (MAF) 11:55 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-03-03
Lun-Mer 11:20 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 11:20 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-12 through 2024-11-20
Mar-Ven 11:20 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 11:20 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-09 through 2024-12-18
Mar,Mer 11:20 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-24 through 2025-01-01
Lun 11:20 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-01-06
Lun-Ven 11:25 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 11:25 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-01-19 through 2025-01-24
Lun-Ven 11:25 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 11:25 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-09 through 2025-02-12
Mar,Mer 11:25 Midland (MAF) 12:45 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-19 through 2025-03-05
Dim 12:10 Oklahoma City (OKC) 16:00 Ronald Reagan Washington (DCA)
WN 1979 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2024-09-01
Lun,Jeu,Ven 13:30 Houston Hobby (HOU) 15:30 Saint Louis (STL) 2
WN 1979 Non-stop Boeing 737-700 (73W) 2:00 Valid until 2024-09-30
Jeu 14:35 San Jose (SJC) B 19:55 Austin (AUS)
WN 1979 Non-stop Boeing 737-700 (73W) 3:20 Operates only on 2024-10-31
Mar,Mer 16:15 Houston Hobby (HOU) 18:15 Saint Louis (STL) 2
WN 1979 Non-stop Boeing 737-700 (73W) 2:00 Valid until 2024-10-01
Mer 16:15 Houston Hobby (HOU) 18:15 Saint Louis (STL) 2
WN 1979 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2024-10-02
Lun-Mer 16:30 Midland (MAF) 17:50 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 16:30 Midland (MAF) 17:50 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-20 through 2025-01-02
Dim 16:30 Midland (MAF) 17:50 Houston Hobby (HOU)
WN 1979 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-01-05
Mar,Mer 16:55 San Jose (SJC) B 22:15 Austin (AUS)
WN 1979 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-10-08 through 2024-10-30
Lun,Jeu,Ven 17:25 Portland (PDX) 19:10 San Jose (SJC) B
WN 1979 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-03 through 2024-10-28
Ven 17:25 Portland (PDX) 19:10 San Jose (SJC) B
WN 1979 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2024-11-01
Dim 18:50 San Jose (SJC) B 00:05 Austin (AUS)
WN 1979 Non-stop Boeing 737-700 (73W) 3:15 Effective 2024-10-06 through 2024-10-27
The flight arrives 1 day after departure.
Lun,Jeu,Ven 19:45 San Jose (SJC) B 01:05 Austin (AUS)
WN 1979 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-10-03 through 2024-10-28
The flight arrives 1 day after departure.
Ven 19:45 San Jose (SJC) B 01:05 Austin (AUS)
WN 1979 Non-stop Boeing 737-700 (73W) 3:20 Operates only on 2024-11-01
The flight arrives 1 day after departure.
Vols indirects:
Lun,Jeu,Ven 17:25 Portland (PDX) 01:05 Austin (AUS)
WN 1979 1-stop Boeing 737-700 (73W) 5:40 Effective 2024-10-03 through 2024-10-28
The flight arrives 1 day after departure.
Ven 17:25 Portland (PDX) 01:05 Austin (AUS)
WN 1979 1-stop Boeing 737-700 (73W) 5:40 Operates only on 2024-11-01
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 1979: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN1979
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1979
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Valid until 2024-10-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2024-10-02
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1979
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1979
18:50

00:05(+1)
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:15, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN1979
19:45

01:05(+1)
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN1979
19:45

01:05(+1)
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Vols indirects:

Southwest Airlines WN1979
17:25

01:05(+1)
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 5:40, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN1979
17:25

01:05(+1)
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 5:40, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Houston Hobby (HOU) - Saint Louis (STL)
  • Midland (MAF) - Houston Hobby (HOU)
  • New Orleans (MSY) - Denver (DEN)
  • Oklahoma City (OKC) - Ronald Reagan Washington (DCA)
  • Portland (PDX) - Austin (AUS)
  • Portland (PDX) - San Jose (SJC)
  • San Jose (SJC) - Austin (AUS)