Southwest Airlines vol WN 1956: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven 05:45 Amarillo (AMA) 07:00 Love Field, Dallas (DAL) 1
WN 1956 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-03 through 2024-10-28
Ven 05:45 Amarillo (AMA) 07:00 Love Field, Dallas (DAL) 1
WN 1956 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-11-01
Lun,Jeu,Ven 07:05 San Jose (SJC) B 08:25 Long Beach (LGB)
WN 1956 Non-stop Boeing 737-700 (73W) 1:20 Valid until 2024-09-30
Sam 07:10 Love Field, Dallas (DAL) 1 09:20 Midway, Chicago (MDW)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2024-10-05 through 2024-11-02
Sam 07:10 Sacramento (SMF) B 12:25 Austin (AUS)
WN 1956 Non-stop Boeing 737-700 (73W) 3:15 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven 07:40 Love Field, Dallas (DAL) 1 09:50 Midway, Chicago (MDW)
WN 1956 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-03 through 2024-10-28
Ven 07:40 Love Field, Dallas (DAL) 1 09:50 Midway, Chicago (MDW)
WN 1956 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-11-01
Lun-Mer 08:05 Las Vegas Harry Reid (LAS) 1 09:45 Sacramento (SMF) B
WN 1956 Non-stop Boeing 737-800 (73H) 1:40 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 08:05 Las Vegas Harry Reid (LAS) 1 09:45 Sacramento (SMF) B
WN 1956 Non-stop Boeing 737-800 (73H) 1:40 Effective 2024-12-20 through 2025-01-02
Dim 08:05 Las Vegas Harry Reid (LAS) 1 09:45 Sacramento (SMF) B
WN 1956 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2025-01-05
Mar,Mer 08:10 Love Field, Dallas (DAL) 1 10:20 Midway, Chicago (MDW)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2024-10-08 through 2024-10-30
Jeu 08:10 Love Field, Dallas (DAL) 1 10:20 Midway, Chicago (MDW)
WN 1956 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-31
Dim 08:40 Love Field, Dallas (DAL) 1 10:50 Midway, Chicago (MDW)
WN 1956 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-06 through 2024-10-27
Dim 11:30 Midway, Chicago (MDW) 13:55 Sacramento (SMF) B
WN 1956 Non-stop Boeing 737-700 (73W) 4:25 Effective 2024-10-06 through 2024-10-27
Dim 12:10 Phoenix Sky Harbor (PHX) 4 14:00 San Jose (SJC) B
WN 1956 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2024-09-01
Dim 13:00 Love Field, Dallas (DAL) 1 16:00 Indianapolis (IND)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Operates only on 2024-12-01
Sam 13:00 Austin (AUS) 16:15 Indianapolis (IND)
WN 1956 Non-stop Boeing 737-700 (73W) 2:15 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven,Dim 13:45 Las Vegas Harry Reid (LAS) 1 20:20 Indianapolis (IND)
WN 1956 Non-stop Boeing 737-700 (73W) 3:35 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 13:45 Las Vegas Harry Reid (LAS) 1 20:20 Indianapolis (IND)
WN 1956 Non-stop Boeing 737-700 (73W) 3:35 Effective 2025-02-21 through 2025-03-02
Mar,Mer 15:40 Phoenix Sky Harbor (PHX) 4 17:30 San Jose (SJC) B
WN 1956 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2024-10-02
Sam 15:50 Indianapolis (IND) 18:05 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-11-23 through 2024-11-30
Sam 15:50 Indianapolis (IND) 18:05 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-12-21 through 2025-01-04
Lun-Ven 16:00 Indianapolis (IND) 18:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 16:00 Indianapolis (IND) 18:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-19 through 2025-01-24
Lun-Ven 16:00 Indianapolis (IND) 18:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 16:00 Indianapolis (IND) 18:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-02-09 through 2025-02-12
Mar,Mer 16:00 Indianapolis (IND) 18:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-02-19 through 2025-03-05
Sam 16:15 Indianapolis (IND) 18:35 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-11-09 through 2024-11-16
Sam 16:15 Indianapolis (IND) 18:35 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-12-07 through 2024-12-14
Jeu,Ven,Dim 16:50 Indianapolis (IND) 19:10 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 16:50 Indianapolis (IND) 19:10 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-11 through 2024-11-25
Ven,Dim 16:50 Indianapolis (IND) 19:10 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-12-08 through 2024-12-15
Jeu 16:50 Indianapolis (IND) 19:10 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-12-19
Ven 16:50 Indianapolis (IND) 19:10 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-01-03
Sam 16:50 Indianapolis (IND) 19:10 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-15 through 2025-03-01
Dim 16:55 Indianapolis (IND) 19:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2024-12-01
Jeu,Ven,Dim 17:10 Indianapolis (IND) 19:30 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-12 through 2025-01-17
Lun,Dim 17:10 Indianapolis (IND) 19:30 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 17:10 Indianapolis (IND) 19:30 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-02 through 2025-02-07
Lun 17:10 Indianapolis (IND) 19:30 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-02-10
Lun,Mar,Jeu 17:10 Indianapolis (IND) 19:30 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-18 through 2025-02-24
Lun 17:10 Indianapolis (IND) 19:30 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-03-03
Sam 17:25 Indianapolis (IND) 19:45 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-11 through 2025-02-08
Lun,Jeu,Ven,Dim 20:55 Indianapolis (IND) 23:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 20:55 Indianapolis (IND) 23:15 Orlando (MCO)
WN 1956 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-21 through 2025-03-02
Vols indirects:
Lun,Jeu,Ven 05:45 Amarillo (AMA) 09:50 Midway, Chicago (MDW)
WN 1956 1-stop Boeing 737-700 (73W) 4:05 Effective 2024-10-03 through 2024-10-28
Ven 05:45 Amarillo (AMA) 09:50 Midway, Chicago (MDW)
WN 1956 1-stop Boeing 737-700 (73W) 4:05 Operates only on 2024-11-01
Sam 07:10 Sacramento (SMF) B 16:15 Indianapolis (IND)
WN 1956 1-stop Boeing 737-700 (73W) 6:05 Effective 2025-02-15 through 2025-03-01
Dim 08:40 Love Field, Dallas (DAL) 1 13:55 Sacramento (SMF) B
WN 1956 1-stop Boeing 737-700 (73W) 7:15 Effective 2024-10-06 through 2024-10-27
Dim 13:00 Love Field, Dallas (DAL) 1 19:15 Orlando (MCO)
WN 1956 1-stop Boeing 737 MAX 8 (7M8) 5:15 Operates only on 2024-12-01
Sam 13:00 Austin (AUS) 19:10 Orlando (MCO)
WN 1956 1-stop Boeing 737-700 (73W) 5:10 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven,Dim 13:45 Las Vegas Harry Reid (LAS) 1 23:15 Orlando (MCO)
WN 1956 1-stop Boeing 737-700 (73W) 6:30 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 13:45 Las Vegas Harry Reid (LAS) 1 23:15 Orlando (MCO)
WN 1956 1-stop Boeing 737-700 (73W) 6:30 Effective 2025-02-21 through 2025-03-02
Sam 07:10 Sacramento (SMF) B 19:10 Orlando (MCO)
WN 1956 2-stop Boeing 737-700 (73W) 9:00 Effective 2025-02-15 through 2025-03-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 1956: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN1956
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1956
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1956
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1956
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1956
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN1956
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:15, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1956
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 6:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 6:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1956
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 9:00, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Amarillo (AMA) - Love Field, Dallas (DAL)
  • Amarillo (AMA) - Midway, Chicago (MDW)
  • Austin (AUS) - Indianapolis (IND)
  • Austin (AUS) - Orlando (MCO)
  • Indianapolis (IND) - Orlando (MCO)
  • Las Vegas Harry Reid (LAS) - Indianapolis (IND)
  • Las Vegas Harry Reid (LAS) - Orlando (MCO)
  • Las Vegas Harry Reid (LAS) - Sacramento (SMF)
  • Love Field, Dallas (DAL) - Indianapolis (IND)
  • Love Field, Dallas (DAL) - Midway, Chicago (MDW)
  • Love Field, Dallas (DAL) - Orlando (MCO)
  • Love Field, Dallas (DAL) - Sacramento (SMF)
  • Midway, Chicago (MDW) - Sacramento (SMF)
  • Phoenix Sky Harbor (PHX) - San Jose (SJC)
  • Sacramento (SMF) - Austin (AUS)
  • Sacramento (SMF) - Indianapolis (IND)
  • Sacramento (SMF) - Orlando (MCO)
  • San Jose (SJC) - Long Beach (LGB)