HORAIRES DES VOLS |
---|
Vols directs: |
Mar,Mer
06:15
Albuquerque (ABQ)
09:15
William P. Hobby, Houston (HOU) WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-03-12 through 2024-04-03 |
Sam
06:20
Albuquerque (ABQ)
09:15
William P. Hobby, Houston (HOU) WN 1535 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-03-09 through 2024-04-06 |
Dim
06:35
Denver (DEN)
07:45
HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 WN 1535 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-01-14 through 2024-03-03 |
Lun,Jeu,Ven
06:45
Albuquerque (ABQ)
09:45
William P. Hobby, Houston (HOU) WN 1535 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-03-07 through 2024-04-08 |
Lun,Jeu,Ven
08:05
HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
09:15
Burbank (BUR) WN 1535 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-01-08 through 2024-03-04 |
Dim
08:20
HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
09:30
Burbank (BUR) WN 1535 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-01-14 through 2024-03-03 |
Tous les jours
09:05
HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
12:25
Honolulu (HNL) 2 WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 6:20 Effective 2024-06-04 through 2024-08-04 |
Dim
10:10
William P. Hobby, Houston (HOU)
14:00
Ronald Reagan, Washington (DCA) WN 1535 Non-stop Boeing 737-800 (738) 2:50 Effective 2024-03-10 through 2024-04-07 |
Mar,Mer
10:10
William P. Hobby, Houston (HOU)
14:00
Ronald Reagan, Washington (DCA) WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-03-12 through 2024-04-03 |
Dim
10:10
Nashville (BNA)
13:40
Edward L. Logan, Boston (BOS) B WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-04-14 through 2024-05-19 |
Dim
10:10
Nashville (BNA)
13:40
Edward L. Logan, Boston (BOS) B WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2024-06-02 |
Lun,Jeu,Ven
10:25
Nashville (BNA)
13:55
Edward L. Logan, Boston (BOS) B WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-04-11 through 2024-06-03 |
Mar,Mer
10:45
Nashville (BNA)
14:15
Edward L. Logan, Boston (BOS) B WN 1535 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-04-09 through 2024-05-29 |
Sam
12:05
Spokane (GEG)
14:00
Sacramento (SMF) B WN 1535 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-01-06 |
Sam
12:25
Nashville (BNA)
15:55
Edward L. Logan, Boston (BOS) B WN 1535 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-04-13 through 2024-06-01 |
Sam
14:40
Sacramento (SMF) B
16:10
Long Beach (LGB) WN 1535 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-01-06 |
Sam
15:40
John Glenn, Columbus (CMH)
17:50
Tampa (TPA) WN 1535 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-08-10 through 2024-09-28 |
Mar,Mer
16:00
John Glenn, Columbus (CMH)
18:10
Tampa (TPA) WN 1535 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-08-06 through 2024-10-02 |
Dim
18:35
John Glenn, Columbus (CMH)
20:45
Tampa (TPA) WN 1535 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-08-11 through 2024-08-25 |
Dim
18:35
John Glenn, Columbus (CMH)
20:45
Tampa (TPA) WN 1535 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-09-08 through 2024-09-29 |
Lun,Jeu,Ven
19:25
John Glenn, Columbus (CMH)
21:40
Tampa (TPA) WN 1535 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-08-05 through 2024-09-30 |
Vols indirects: |
Mar,Mer
06:15
Albuquerque (ABQ)
14:00
Ronald Reagan, Washington (DCA) WN 1535 1-stop Boeing 737 MAX 8 (7M8) 5:45 Effective 2024-03-12 through 2024-04-03 |
Dim
06:35
Denver (DEN)
09:30
Burbank (BUR) WN 1535 1-stop Boeing 737-700 (73W) 3:55 Effective 2024-01-14 through 2024-03-03 |
Sam
12:05
Spokane (GEG)
16:10
Long Beach (LGB) WN 1535 1-stop Boeing 737-700 (73W) 4:05 Operates only on 2024-01-06 |