Southwest Airlines vol WN 1039: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Mar,Mer 06:30 Phoenix Sky Harbor (PHX) 4 11:50 Midway, Chicago (MDW)
WN 1039 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Valid until 2024-10-02
Dim 06:40 San Jose (SJC) B 08:00 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-12-01
Lun,Jeu,Ven,Dim 06:40 San Jose (SJC) B 08:00 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 06:40 San Jose (SJC) B 08:00 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-21 through 2025-03-02
Sam 06:50 San Jose (SJC) B 08:10 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-23 through 2024-11-30
Sam 06:50 San Jose (SJC) B 08:10 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-21 through 2025-01-04
Jeu,Ven,Dim 06:55 San Jose (SJC) B 08:15 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-12 through 2025-01-17
Lun,Dim 06:55 San Jose (SJC) B 08:15 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 06:55 San Jose (SJC) B 08:15 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-02 through 2025-02-07
Lun 06:55 San Jose (SJC) B 08:15 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-02-10
Lun,Mar,Jeu 06:55 San Jose (SJC) B 08:15 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-18 through 2025-02-24
Lun 06:55 San Jose (SJC) B 08:15 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-03-03
Lun,Jeu,Ven 07:10 Phoenix Sky Harbor (PHX) 4 12:30 Midway, Chicago (MDW)
WN 1039 Non-stop Boeing 737-800 (73H) 3:20 Valid until 2024-09-09
Lun,Jeu,Ven 07:10 Phoenix Sky Harbor (PHX) 4 12:30 Midway, Chicago (MDW)
WN 1039 Non-stop Boeing 737-800 (73H) 3:20 Effective 2024-09-16 through 2024-09-30
Jeu,Ven 07:15 Phoenix Sky Harbor (PHX) 4 12:35 Midway, Chicago (MDW)
WN 1039 Non-stop Boeing 737-800 (73H) 3:20 Effective 2024-09-12 through 2024-09-13
Sam 07:45 San Jose (SJC) B 09:05 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-15 through 2025-03-01
Lun-Ven 08:05 San Jose (SJC) B 09:25 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-07 through 2025-01-15
Sam 08:05 San Jose (SJC) B 09:25 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-11 through 2025-02-08
Mar-Ven,Dim 08:05 San Jose (SJC) B 09:25 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-19 through 2025-01-24
Lun-Ven 08:05 San Jose (SJC) B 09:25 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 08:05 San Jose (SJC) B 09:25 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-09 through 2025-02-12
Mar,Mer 08:05 San Jose (SJC) B 09:25 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-19 through 2025-03-05
Dim 08:45 Los Angeles (LAX) 1 11:15 Phoenix Sky Harbor (PHX) 4
WN 1039 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-12-01
Dim 09:25 Phoenix Sky Harbor (PHX) 4 10:45 San Diego (SAN) 1
WN 1039 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-10-06 through 2024-10-27
Lun-Mer 11:10 San Jose (SJC) B 12:30 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 11:10 San Jose (SJC) B 12:30 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-20 through 2025-01-02
Dim 11:10 San Jose (SJC) B 12:30 Los Angeles (LAX) 1
WN 1039 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-01-05
Lun-Mer 11:25 Houston Hobby (HOU) 15:15 Baltimore (BWI)
WN 1039 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-11-04 through 2024-11-06
Mar,Mer 11:25 Houston Hobby (HOU) 15:15 Baltimore (BWI)
WN 1039 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-11-12 through 2024-11-20
Mar-Ven 11:25 Houston Hobby (HOU) 15:15 Baltimore (BWI)
WN 1039 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 11:25 Houston Hobby (HOU) 15:15 Baltimore (BWI)
WN 1039 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-12-09 through 2024-12-18
Mar,Mer 11:25 Houston Hobby (HOU) 15:15 Baltimore (BWI)
WN 1039 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-12-24 through 2025-01-01
Lun 11:25 Houston Hobby (HOU) 15:15 Baltimore (BWI)
WN 1039 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2025-01-06
Dim 11:40 Las Vegas Harry Reid (LAS) 1 18:55 Pittsburgh (PIT)
WN 1039 Non-stop Boeing 737-700 (73W) 4:15 Operates only on 2024-09-01
Lun-Mer 13:10 Los Angeles (LAX) 1 16:00 Albuquerque (ABQ)
WN 1039 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 13:10 Los Angeles (LAX) 1 16:00 Albuquerque (ABQ)
WN 1039 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-12-20 through 2025-01-02
Dim 13:10 Los Angeles (LAX) 1 16:00 Albuquerque (ABQ)
WN 1039 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-01-05
Lun-Mer 16:35 Albuquerque (ABQ) 19:15 Austin (AUS)
WN 1039 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 16:35 Albuquerque (ABQ) 19:15 Austin (AUS)
WN 1039 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-12-20 through 2025-01-02
Dim 16:35 Albuquerque (ABQ) 19:15 Austin (AUS)
WN 1039 Non-stop Boeing 737-700 (73W) 1:40 Operates only on 2025-01-05
Jeu 16:50 Austin (AUS) 19:20 Midway, Chicago (MDW)
WN 1039 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2024-10-31
Mar,Mer 18:05 Midway, Chicago (MDW) 20:50 Charlotte (CLT)
WN 1039 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-10-08 through 2024-10-30
Sam 18:30 Midway, Chicago (MDW) 21:20 Charlotte (CLT)
WN 1039 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-10-05 through 2024-11-02
Sam 18:45 Baltimore (BWI) 21:00 Houston Hobby (HOU)
WN 1039 Non-stop Boeing 737-700 (73W) 3:15 Valid until 2024-09-28
Dim 19:30 Pittsburgh (PIT) 20:00 Nashville (BNA)
WN 1039 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-09-01
Lun-Mer 20:00 Austin (AUS) 23:45 Raleigh/Durham (RDU) 1
WN 1039 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 20:00 Austin (AUS) 23:45 Raleigh/Durham (RDU) 1
WN 1039 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-12-20 through 2025-01-02
Dim 20:00 Austin (AUS) 23:45 Raleigh/Durham (RDU) 1
WN 1039 Non-stop Boeing 737-700 (73W) 2:45 Operates only on 2025-01-05
Dim 20:30 Pittsburgh (PIT) 21:00 Nashville (BNA)
WN 1039 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-09-08 through 2024-09-29
Jeu 20:50 Midway, Chicago (MDW) 23:40 Charlotte (CLT)
WN 1039 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2024-10-03
Lun,Jeu,Ven 20:55 Midway, Chicago (MDW) 23:45 Charlotte (CLT)
WN 1039 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-10-04 through 2024-10-28
Ven 20:55 Midway, Chicago (MDW) 23:45 Charlotte (CLT)
WN 1039 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2024-11-01
Vols indirects:
Dim 06:40 San Jose (SJC) B 11:15 Phoenix Sky Harbor (PHX) 4
WN 1039 1-stop Boeing 737-800 (73H) 3:35 Operates only on 2024-12-01
Lun-Mer 11:10 San Jose (SJC) B 16:00 Albuquerque (ABQ)
WN 1039 1-stop Boeing 737-700 (73W) 3:50 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 11:10 San Jose (SJC) B 16:00 Albuquerque (ABQ)
WN 1039 1-stop Boeing 737-700 (73W) 3:50 Effective 2024-12-20 through 2025-01-02
Dim 11:10 San Jose (SJC) B 16:00 Albuquerque (ABQ)
WN 1039 1-stop Boeing 737-700 (73W) 3:50 Operates only on 2025-01-05
Dim 11:40 Las Vegas Harry Reid (LAS) 1 20:00 Nashville (BNA)
WN 1039 1-stop Boeing 737-700 (73W) 6:20 Operates only on 2024-09-01
Lun-Mer 13:10 Los Angeles (LAX) 1 19:15 Austin (AUS)
WN 1039 1-stop Boeing 737-700 (73W) 4:05 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 13:10 Los Angeles (LAX) 1 19:15 Austin (AUS)
WN 1039 1-stop Boeing 737-700 (73W) 4:05 Effective 2024-12-20 through 2025-01-02
Dim 13:10 Los Angeles (LAX) 1 19:15 Austin (AUS)
WN 1039 1-stop Boeing 737-700 (73W) 4:05 Operates only on 2025-01-05
Lun-Mer 16:35 Albuquerque (ABQ) 23:45 Raleigh/Durham (RDU) 1
WN 1039 1-stop Boeing 737-700 (73W) 5:10 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 16:35 Albuquerque (ABQ) 23:45 Raleigh/Durham (RDU) 1
WN 1039 1-stop Boeing 737-700 (73W) 5:10 Effective 2024-12-20 through 2025-01-02
Dim 16:35 Albuquerque (ABQ) 23:45 Raleigh/Durham (RDU) 1
WN 1039 1-stop Boeing 737-700 (73W) 5:10 Operates only on 2025-01-05
Lun-Mer 11:10 San Jose (SJC) B 19:15 Austin (AUS)
WN 1039 2-stop Boeing 737-700 (73W) 6:05 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 11:10 San Jose (SJC) B 19:15 Austin (AUS)
WN 1039 2-stop Boeing 737-700 (73W) 6:05 Effective 2024-12-20 through 2025-01-02
Dim 11:10 San Jose (SJC) B 19:15 Austin (AUS)
WN 1039 2-stop Boeing 737-700 (73W) 6:05 Operates only on 2025-01-05
Lun-Mer 13:10 Los Angeles (LAX) 1 23:45 Raleigh/Durham (RDU) 1
WN 1039 2-stop Boeing 737-700 (73W) 7:35 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 13:10 Los Angeles (LAX) 1 23:45 Raleigh/Durham (RDU) 1
WN 1039 2-stop Boeing 737-700 (73W) 7:35 Effective 2024-12-20 through 2025-01-02
Dim 13:10 Los Angeles (LAX) 1 23:45 Raleigh/Durham (RDU) 1
WN 1039 2-stop Boeing 737-700 (73W) 7:35 Operates only on 2025-01-05
Lun-Mer 11:10 San Jose (SJC) B 23:45 Raleigh/Durham (RDU) 1
WN 1039 3-stop Boeing 737-700 (73W) 9:35 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 11:10 San Jose (SJC) B 23:45 Raleigh/Durham (RDU) 1
WN 1039 3-stop Boeing 737-700 (73W) 9:35 Effective 2024-12-20 through 2025-01-02
Dim 11:10 San Jose (SJC) B 23:45 Raleigh/Durham (RDU) 1
WN 1039 3-stop Boeing 737-700 (73W) 9:35 Operates only on 2025-01-05
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 1039: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN1039
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1039
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Valid until 2024-09-09
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2024-09-16 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2024-09-12 through 2024-09-13
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1039
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2024-10-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1039
Effective 2024-10-04 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1039
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Southwest Airlines WN1039
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:35, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:05, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 6:05, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:05, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 7:35, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 7:35, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:35, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 9:35, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 9:35, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN1039
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 9:35, 3-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Albuquerque (ABQ) - Austin (AUS)
  • Albuquerque (ABQ) - Raleigh/Durham (RDU)
  • Austin (AUS) - Midway, Chicago (MDW)
  • Austin (AUS) - Raleigh/Durham (RDU)
  • Baltimore (BWI) - Houston Hobby (HOU)
  • Las Vegas Harry Reid (LAS) - Nashville (BNA)
  • Las Vegas Harry Reid (LAS) - Pittsburgh (PIT)
  • Los Angeles (LAX) - Albuquerque (ABQ)
  • Los Angeles (LAX) - Austin (AUS)
  • Los Angeles (LAX) - Phoenix Sky Harbor (PHX)
  • Los Angeles (LAX) - Raleigh/Durham (RDU)
  • Midway, Chicago (MDW) - Charlotte (CLT)
  • Phoenix Sky Harbor (PHX) - Midway, Chicago (MDW)
  • Phoenix Sky Harbor (PHX) - San Diego (SAN)
  • Pittsburgh (PIT) - Nashville (BNA)
  • San Jose (SJC) - Albuquerque (ABQ)
  • San Jose (SJC) - Austin (AUS)
  • San Jose (SJC) - Los Angeles (LAX)
  • San Jose (SJC) - Phoenix Sky Harbor (PHX)
  • San Jose (SJC) - Raleigh/Durham (RDU)