HORAIRES DES VOLS |
---|
Vols directs en partage de code: |
Sam
07:10
Brisbane (BNE) D
09:35
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-09-28 Codeshare flight, operated by Virgin Australia.(VA 312) |
Mar
07:15
Adelaide (ADL) 1
09:05
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-07 Codeshare flight, operated by Virgin Australia.(VA 208) |
Mar
07:15
Adelaide (ADL) 1
09:05
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-21 Codeshare flight, operated by Virgin Australia.(VA 208) |
Mer
07:45
Kalgoorlie-Boulder (KGI)
08:55
Perth (PER) 1 QR 7106 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-12-18 Codeshare flight, operated by Virgin Australia.(VA 1850) |
Mar
07:45
Kalgoorlie-Boulder (KGI)
08:55
Perth (PER) 1 QR 7106 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-12-31 Codeshare flight, operated by Virgin Australia.(VA 1850) |
Mer
07:45
Kalgoorlie-Boulder (KGI)
08:55
Perth (PER) 1 QR 7106 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2025-01-08 Codeshare flight, operated by Virgin Australia.(VA 1850) |
Mar
08:10
Adelaide (ADL) 1
10:00
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-14 Codeshare flight, operated by Virgin Australia.(VA 212) |
Mer
08:45
Kalgoorlie-Boulder (KGI)
09:55
Perth (PER) 1 QR 7106 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2025-01-22 Codeshare flight, operated by Virgin Australia.(VA 1852) |
Tous les jours
08:55
Brisbane (BNE) D
12:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-26 Codeshare flight, operated by Virgin Australia.(VA 318) |
Mar
08:55
Townsville (TSV)
10:50
Brisbane (BNE) D QR 7106 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-12-17 Codeshare flight, operated by Virgin Australia.(VA 366) |
Mer
09:45
Karratha (KTA)
11:45
Perth (PER) 1 QR 7106 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-01-15 Codeshare flight, operated by Virgin Australia.(VA 1724) |
Tous les jours
10:55
Brisbane (BNE) D
13:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-09-13 Codeshare flight, operated by Virgin Australia.(VA 324) |
Lun-Ven,Dim
10:55
Brisbane (BNE) D
13:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-15 through 2024-10-04 Codeshare flight, operated by Virgin Australia.(VA 324) |
Lun-Ven
10:55
Brisbane (BNE) D
14:15
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-28 through 2024-12-16 Codeshare flight, operated by Virgin Australia.(VA 324) |
Lun,Mar,Jeu,Ven
10:55
Brisbane (BNE) D
14:15
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-19 through 2024-12-30 Codeshare flight, operated by Virgin Australia.(VA 324) |
Lun,Jeu,Ven
10:55
Brisbane (BNE) D
14:15
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-02 through 2025-01-27 Codeshare flight, operated by Virgin Australia.(VA 324) |
Lun-Ven
10:55
Brisbane (BNE) D
14:15
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-31 through 2025-04-04 Codeshare flight, operated by Virgin Australia.(VA 324) |
Lun-Ven
10:55
Brisbane (BNE) D
13:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-07 Codeshare flight, operated by Virgin Australia.(VA 324) |
Sam
11:55
Brisbane (BNE) D
14:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-14 through 2024-09-21 Codeshare flight, operated by Virgin Australia.(VA 324) |
Sam
11:55
Brisbane (BNE) D
14:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-10-05 Codeshare flight, operated by Virgin Australia.(VA 324) |
Sam
15:55
Brisbane (BNE) D
19:15
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-02 through 2025-04-05 Codeshare flight, operated by Virgin Australia.(VA 336) |
Sam
15:55
Brisbane (BNE) D
18:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-700 (73W) 2:25 Effective from 2025-04-12 Codeshare flight, operated by Virgin Australia.(VA 336) |
Dim
16:55
Brisbane (BNE) D
20:15
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2025-03-30 Codeshare flight, operated by Virgin Australia.(VA 342) |
Dim
16:55
Brisbane (BNE) D
19:20
Melbourne (MEL) 3 QR 7106 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06 Codeshare flight, operated by Virgin Australia.(VA 342) |