Qatar Airways vol QR 1002: Doha - Dubai

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Mar,Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Valid until 2024-09-01
Lun 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2024-09-02
Lun-Mer,Ven 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-09-03 through 2024-09-09
Jeu 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Operates only on 2024-09-05
Sam 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2024-09-07
Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Operates only on 2024-09-08
Mar 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Operates only on 2024-09-10
Mer,Ven,Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-09-11 through 2024-09-18
Jeu 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2024-09-12
Mar,Sam 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-200 (332) 1:20 Effective 2024-09-14 through 2024-09-17
Lun 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Effective 2024-09-16 through 2024-09-23
Jeu,Sam,Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-09-19 through 2024-09-26
Ven 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Operates only on 2024-09-20
Lun,Mar 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-200 (332) 1:20 Effective 2024-09-24 through 2024-09-30
Mer,Ven 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Effective 2024-09-25 through 2024-09-27
Ven-Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-09-28 through 2024-10-04
Mar 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Operates only on 2024-10-01
Mer 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Effective 2024-10-02 through 2024-10-09
Lun,Jeu 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Effective 2024-10-03 through 2024-10-07
Sam 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-300 (333) 1:20 Operates only on 2024-10-05
Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Effective 2024-10-06 through 2024-10-13
Mar 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2024-10-08
Jeu,Sam 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-10-10 through 2024-10-12
Lun,Mar,Jeu,Ven 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-10-11 through 2024-10-18
Mer 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2024-10-16
Sam 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-300 (333) 1:20 Operates only on 2024-10-19
Sam,Dim 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Effective 2024-10-20 through 2024-10-26
Lun 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2024-10-21
Mar,Mer,Ven 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-10-22 through 2024-10-25
Jeu 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2024-10-24
Tous les jours 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-03-31 through 2025-04-30
Jeu 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Operates only on 2025-05-01
Tous les jours 00:55 Doha (DOH) 03:15 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective from 2025-05-02
Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2024-10-27
Lun,Jeu-Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-10-28 through 2024-11-03
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Operates only on 2024-10-29
Lun,Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-10-30 through 2024-11-06
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Operates only on 2024-11-05
Jeu 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2024-11-07
Lun,Mer-Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-11-08 through 2024-11-15
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-200 (332) 1:20 Operates only on 2024-11-12
Mar,Sam,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-11-16 through 2024-11-23
Lun,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-11-18 through 2024-11-25
Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2024-11-20
Jeu 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Effective 2024-11-21 through 2024-11-28
Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Operates only on 2024-11-22
Mar,Mer,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-11-26 through 2024-11-30
Lun,Mar,Jeu,Ven,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-11-29 through 2024-12-05
Mer,Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-12-04 through 2024-12-11
Mar,Ven,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Effective 2024-12-07 through 2024-12-13
Lun,Jeu,Sam,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-12-08 through 2024-12-14
Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-300 (333) 1:20 Effective 2024-12-15 through 2024-12-22
Lun,Jeu 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Effective 2024-12-16 through 2024-12-19
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-12-17 through 2024-12-24
Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-200 (332) 1:20 Operates only on 2024-12-18
Lun,Ven,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-12-20 through 2024-12-23
Lun,Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2024-12-25 through 2024-12-30
Jeu 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2024-12-26
Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-300 (333) 1:20 Operates only on 2024-12-27
Jeu,Sam,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2024-12-28 through 2025-01-04
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-200LR (77L) 1:20 Effective 2024-12-31 through 2025-01-07
Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Operates only on 2025-01-01
Mer,Ven,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-01-03 through 2025-01-08
Lun,Jeu-Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2025-01-06 through 2025-01-13
Ven,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-01-12 through 2025-01-17
Mar-Jeu,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2025-01-14 through 2025-01-18
Lun,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Effective 2025-01-19 through 2025-01-20
Lun-Mer,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-01-21 through 2025-01-29
Jeu,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2025-01-23 through 2025-02-01
Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-200 (332) 1:20 Operates only on 2025-01-24
Mar,Jeu,Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-01-31 through 2025-02-07
Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Effective 2025-02-02 through 2025-02-09
Lun 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2025-02-03
Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2025-02-05
Mar,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2025-02-08 through 2025-02-15
Lun,Mer-Ven,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-02-10 through 2025-02-16
Lun,Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Effective 2025-02-17 through 2025-02-21
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A330-300 (333) 1:20 Operates only on 2025-02-18
Lun-Jeu,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-02-19 through 2025-02-26
Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:20 Operates only on 2025-02-22
Mer,Jeu 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Effective 2025-02-27 through 2025-03-05
Jeu-Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-02-28 through 2025-03-06
Lun,Mar,Ven-Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Effective 2025-03-02 through 2025-03-10
Mar 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Effective 2025-03-11 through 2025-03-18
Lun,Mer,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Effective 2025-03-12 through 2025-03-17
Jeu,Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-03-13 through 2025-03-16
Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-1000 (351) 1:20 Operates only on 2025-03-14
Mer 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 777-300ER (77W) 1:20 Operates only on 2025-03-19
Mar-Dim 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Effective 2025-03-20 through 2025-03-26
Lun,Jeu,Sam 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Airbus A350-900 (359) 1:20 Effective 2025-03-24 through 2025-03-29
Ven 01:30 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-9 (789) 1:20 Operates only on 2025-03-28
Dim 01:35 Doha (DOH) 03:50 Dubai (DXB) 1
QR 1002 Non-stop Boeing 787-8 (788) 1:15 Operates only on 2025-03-30
Qatar Airways vol QR 1002:
Doha - Dubai
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Qatar Airways QR1002
00:55

03:15
Valid until 2024-09-01
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-03 through 2024-09-09
Lun
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-05
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-10
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-11 through 2024-09-18
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-12
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-14 through 2024-09-17
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A330-200 (332)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-16 through 2024-09-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-19 through 2024-09-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-09-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-24 through 2024-09-30
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A330-200 (332)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-25 through 2024-09-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
00:55

03:15
Effective 2024-09-28 through 2024-10-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-01
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-02 through 2024-10-09
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-03 through 2024-10-07
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A330-300 (333)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-06 through 2024-10-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-08
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-10 through 2024-10-12
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-11 through 2024-10-18
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-16
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A330-300 (333)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-20 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-21
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
00:55

03:15
Effective 2024-10-22 through 2024-10-25
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Operates only on 2024-10-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
00:55

03:15
Effective 2025-03-31 through 2025-04-30
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
00:55

03:15
Operates only on 2025-05-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
00:55

03:15
Effective from 2025-05-02
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Effective 2024-10-28 through 2024-11-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-10-29
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
01:30

03:50
Effective 2024-10-30 through 2024-11-06
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-11-05
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-11-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Effective 2024-11-08 through 2024-11-15
Lun
Mar
-
Mer
Jeu
Ven
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-11-12
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A330-200 (332)

Qatar Airways QR1002
01:30

03:50
Effective 2024-11-16 through 2024-11-23
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2024-11-18 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-11-20
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:30

03:50
Effective 2024-11-21 through 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-11-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
01:30

03:50
Effective 2024-11-26 through 2024-11-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2024-11-29 through 2024-12-05
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-04 through 2024-12-11
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-07 through 2024-12-13
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-08 through 2024-12-14
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-15 through 2024-12-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A330-300 (333)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-16 through 2024-12-19
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-17 through 2024-12-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-12-18
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A330-200 (332)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-20 through 2024-12-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-25 through 2024-12-30
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-12-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Operates only on 2024-12-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A330-300 (333)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-28 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2024-12-31 through 2025-01-07
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-200LR (77L)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-01-01
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-03 through 2025-01-08
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-06 through 2025-01-13
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-14 through 2025-01-18
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-19 through 2025-01-20
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-21 through 2025-01-29
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-23 through 2025-02-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-01-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A330-200 (332)

Qatar Airways QR1002
01:30

03:50
Effective 2025-01-31 through 2025-02-07
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-02 through 2025-02-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-02-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-02-05
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-08 through 2025-02-15
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-10 through 2025-02-16
Lun
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-17 through 2025-02-21
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-02-18
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A330-300 (333)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-19 through 2025-02-26
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-02-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 787-8 (788)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-27 through 2025-03-05
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Effective 2025-02-28 through 2025-03-06
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Effective 2025-03-02 through 2025-03-10
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:30

03:50
Effective 2025-03-11 through 2025-03-18
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Effective 2025-03-12 through 2025-03-17
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:30

03:50
Effective 2025-03-13 through 2025-03-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-03-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Airbus A350-1000 (351)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-03-19
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 777-300ER (77W)

Qatar Airways QR1002
01:30

03:50
Effective 2025-03-20 through 2025-03-26
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:30

03:50
Effective 2025-03-24 through 2025-03-29
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Airbus A350-900 (359)

Qatar Airways QR1002
01:30

03:50
Operates only on 2025-03-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 787-9 (789)

Qatar Airways QR1002
01:35

03:50
Operates only on 2025-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 787-8 (788)
  • QR 1002 est un vol international au départ de l'aéroport de Doha, Qatar (DOH) et à destination de l'aéroport de Dubai, United Arab Emirates (DXB).
  • La distance est de 377 km.
  • Le fuseau horaire de l'aéroport de départ est UTC+3 , et le fuseau horaire de l'aéroport d'arrivée est UTC+4 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 1:15 et 1:20.