Iberia vol IB 6231: Doha - Karachi

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Dim 02:10 Doha (DOH) 06:40 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-8 (788) 2:30 Operates only on 2025-03-30
Codeshare flight, operated by Qatar Airways.(QR 610)
Dim 02:15 Doha (DOH) 06:50 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:35 Operates only on 2024-10-27
Codeshare flight, operated by Qatar Airways.(QR 610)
Tous les jours 02:15 Doha (DOH) 06:50 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-8 (788) 2:35 Effective from 2025-03-31
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer-Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2024-10-30 through 2024-11-21
Codeshare flight, operated by Qatar Airways.(QR 610)
Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-300ER (77W) 2:30 Operates only on 2024-11-03
Codeshare flight, operated by Qatar Airways.(QR 610)
Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-1000 (351) 2:30 Effective 2024-11-10 through 2024-11-17
Codeshare flight, operated by Qatar Airways.(QR 610)
Ven 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Operates only on 2024-11-22
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-1000 (351) 2:30 Operates only on 2024-11-23
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer-Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2024-11-24 through 2024-12-11
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Operates only on 2024-11-30
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-200 (332) 2:30 Operates only on 2024-12-07
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Jeu,Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2024-12-12 through 2024-12-16
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar-Ven 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2024-12-13 through 2024-12-24
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-200 (332) 2:30 Effective 2024-12-15 through 2024-12-28
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Operates only on 2024-12-23
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-9 (789) 2:30 Operates only on 2024-12-25
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar,Jeu,Ven 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2024-12-26 through 2024-12-31
Codeshare flight, operated by Qatar Airways.(QR 610)
Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-8 (788) 2:30 Operates only on 2024-12-29
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-300ER (77W) 2:30 Operates only on 2024-12-30
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Mer 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2025-01-01 through 2025-01-06
Codeshare flight, operated by Qatar Airways.(QR 610)
Jeu 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-200LR (77L) 2:30 Operates only on 2025-01-02
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer,Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-01-03 through 2025-01-08
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-1000 (351) 2:30 Operates only on 2025-01-04
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar,Jeu 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-300ER (77W) 2:30 Effective 2025-01-07 through 2025-01-09
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Ven,Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2025-01-10 through 2025-01-13
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar-Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-01-12 through 2025-01-22
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Jeu,Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2025-01-18 through 2025-01-23
Codeshare flight, operated by Qatar Airways.(QR 610)
Ven-Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-01-24 through 2025-01-31
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Jeu,Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2025-01-27 through 2025-02-03
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-1000 (351) 2:30 Operates only on 2025-01-28
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-9 (789) 2:30 Operates only on 2025-01-29
Codeshare flight, operated by Qatar Airways.(QR 610)
Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-300ER (77W) 2:30 Operates only on 2025-02-02
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar-Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-02-04 through 2025-02-13
Codeshare flight, operated by Qatar Airways.(QR 610)
Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-200LR (77L) 2:30 Effective 2025-02-09 through 2025-02-14
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2025-02-10 through 2025-02-17
Codeshare flight, operated by Qatar Airways.(QR 610)
Jeu,Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-02-16 through 2025-02-21
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-1000 (351) 2:30 Operates only on 2025-02-18
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-8 (788) 2:30 Effective 2025-02-19 through 2025-02-26
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-200 (332) 2:30 Operates only on 2025-02-22
Codeshare flight, operated by Qatar Airways.(QR 610)
Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-300ER (77W) 2:30 Operates only on 2025-02-23
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Operates only on 2025-02-24
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar,Ven-Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-02-25 through 2025-03-02
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun-Jeu 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-9 (789) 2:30 Effective 2025-02-27 through 2025-03-05
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Jeu,Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-03-06 through 2025-03-10
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Effective 2025-03-08 through 2025-03-15
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun-Jeu 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-9 (789) 2:30 Effective 2025-03-11 through 2025-03-18
Codeshare flight, operated by Qatar Airways.(QR 610)
Ven,Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-03-14 through 2025-03-21
Codeshare flight, operated by Qatar Airways.(QR 610)
Mer 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 777-300ER (77W) 2:30 Operates only on 2025-03-19
Codeshare flight, operated by Qatar Airways.(QR 610)
Lun,Mer,Jeu 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Boeing 787-9 (789) 2:30 Effective 2025-03-20 through 2025-03-27
Codeshare flight, operated by Qatar Airways.(QR 610)
Mar,Ven-Dim 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A350-900 (359) 2:30 Effective 2025-03-22 through 2025-03-28
Codeshare flight, operated by Qatar Airways.(QR 610)
Sam 02:35 Doha (DOH) 07:05 Karachi (KHI) M
IB 6231 Non-stop Airbus A330-300 (333) 2:30 Operates only on 2025-03-29
Codeshare flight, operated by Qatar Airways.(QR 610)
Iberia vol IB 6231:
Doha - Karachi
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

Iberia IB6231
02:10

06:40
Operates only on 2025-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-8 (788)

Iberia IB6231
02:15

06:50
Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:35, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:15

06:50
Effective from 2025-03-31
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:35, non-stop
Boeing 787-8 (788)

Iberia IB6231
02:35

07:05
Effective 2024-10-30 through 2024-11-21
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2024-11-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-300ER (77W)

Iberia IB6231
02:35

07:05
Effective 2024-11-10 through 2024-11-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-1000 (351)

Iberia IB6231
02:35

07:05
Operates only on 2024-11-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Operates only on 2024-11-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-1000 (351)

Iberia IB6231
02:35

07:05
Effective 2024-11-24 through 2024-12-11
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Operates only on 2024-12-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-200 (332)

Iberia IB6231
02:35

07:05
Effective 2024-12-12 through 2024-12-16
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Effective 2024-12-13 through 2024-12-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Effective 2024-12-15 through 2024-12-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-200 (332)

Iberia IB6231
02:35

07:05
Operates only on 2024-12-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Operates only on 2024-12-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-9 (789)

Iberia IB6231
02:35

07:05
Effective 2024-12-26 through 2024-12-31
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2024-12-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-8 (788)

Iberia IB6231
02:35

07:05
Operates only on 2024-12-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-300ER (77W)

Iberia IB6231
02:35

07:05
Effective 2025-01-01 through 2025-01-06
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Operates only on 2025-01-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-200LR (77L)

Iberia IB6231
02:35

07:05
Effective 2025-01-03 through 2025-01-08
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-1000 (351)

Iberia IB6231
02:35

07:05
Effective 2025-01-07 through 2025-01-09
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-300ER (77W)

Iberia IB6231
02:35

07:05
Effective 2025-01-10 through 2025-01-13
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Effective 2025-01-12 through 2025-01-22
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Effective 2025-01-18 through 2025-01-23
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Effective 2025-01-24 through 2025-01-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Effective 2025-01-27 through 2025-02-03
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Operates only on 2025-01-28
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-1000 (351)

Iberia IB6231
02:35

07:05
Operates only on 2025-01-29
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-9 (789)

Iberia IB6231
02:35

07:05
Operates only on 2025-02-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-300ER (77W)

Iberia IB6231
02:35

07:05
Effective 2025-02-04 through 2025-02-13
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Effective 2025-02-09 through 2025-02-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-200LR (77L)

Iberia IB6231
02:35

07:05
Effective 2025-02-10 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Effective 2025-02-16 through 2025-02-21
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2025-02-18
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-1000 (351)

Iberia IB6231
02:35

07:05
Effective 2025-02-19 through 2025-02-26
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-8 (788)

Iberia IB6231
02:35

07:05
Operates only on 2025-02-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-200 (332)

Iberia IB6231
02:35

07:05
Operates only on 2025-02-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-300ER (77W)

Iberia IB6231
02:35

07:05
Operates only on 2025-02-24
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Effective 2025-02-25 through 2025-03-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Effective 2025-02-27 through 2025-03-05
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-9 (789)

Iberia IB6231
02:35

07:05
Effective 2025-03-06 through 2025-03-10
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Effective 2025-03-08 through 2025-03-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)

Iberia IB6231
02:35

07:05
Effective 2025-03-11 through 2025-03-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-9 (789)

Iberia IB6231
02:35

07:05
Effective 2025-03-14 through 2025-03-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2025-03-19
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 777-300ER (77W)

Iberia IB6231
02:35

07:05
Effective 2025-03-20 through 2025-03-27
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Boeing 787-9 (789)

Iberia IB6231
02:35

07:05
Effective 2025-03-22 through 2025-03-28
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A350-900 (359)

Iberia IB6231
02:35

07:05
Operates only on 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 610)
Duration: 2:30, non-stop
Airbus A330-300 (333)
  • IB 6231 est un vol international au départ de l'aéroport de Doha, Qatar (DOH) et à destination de l'aéroport de Karachi, Pakistan (KHI).
  • La distance est de 1564 km.
  • Le fuseau horaire de l'aéroport de départ est UTC+3 , et le fuseau horaire de l'aéroport d'arrivée est UTC+5 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 2:30 et 2:35.