Allegiant Air vol G4 1528: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 06:30 Flint (FNT) 09:02 Mesa Gateway, Phoenix (AZA)
G4 1528 Non-stop Airbus A320 (320) 4:32 Operates only on 2024-03-09
Sam 06:30 Flint (FNT) 08:02 Mesa Gateway, Phoenix (AZA)
G4 1528 Non-stop Airbus A320 (320) 4:32 Effective 2024-03-16 through 2024-03-30
Jeu,Dim 07:30 Flint (FNT) 10:32 Sarasota/Bradenton (SRQ)
G4 1528 Non-stop Airbus A320 (320) 3:02 Effective 2024-04-04 through 2024-04-11
Jeu,Sam,Dim 07:30 Flint (FNT) 10:32 Sarasota/Bradenton (SRQ)
G4 1528 Non-stop Airbus A320 (320) 3:02 Effective 2024-04-13 through 2024-04-28
Mar 08:00 Flint (FNT) 10:56 Sarasota/Bradenton (SRQ)
G4 1528 Non-stop Airbus A320 (320) 2:56 Effective 2024-02-20 through 2024-03-05
Mer 09:00 Flint (FNT) 10:32 Mesa Gateway, Phoenix (AZA)
G4 1528 Non-stop Airbus A320 (320) 4:32 Effective 2024-03-13 through 2024-03-27
Mer 09:00 Flint (FNT) 10:24 Mesa Gateway, Phoenix (AZA)
G4 1528 Non-stop Airbus A320 (320) 4:24 Effective 2024-04-03 through 2024-04-24
Lun,Ven 09:00 Flint (FNT) 12:02 Sarasota/Bradenton (SRQ)
G4 1528 Non-stop Airbus A320 (320) 3:02 Effective 2024-04-05 through 2024-04-22
Mer 09:00 Flint (FNT) 10:08 Mesa Gateway, Phoenix (AZA)
G4 1528 Non-stop Airbus A320 (320) 4:08 Effective 2024-05-01 through 2024-05-08
Lun 10:00 Flint (FNT) 10:49 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:49 Operates only on 2024-01-01
Mar 10:00 Flint (FNT) 10:58 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:58 Effective 2024-01-16 through 2024-01-23
Mar 10:30 Flint (FNT) 11:28 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:58 Operates only on 2024-01-30
Mar 10:30 Flint (FNT) 11:22 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:52 Effective 2024-02-06 through 2024-02-13
Jeu,Dim 11:16 Sarasota/Bradenton (SRQ) 14:09 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 2:53 Effective 2024-02-01 through 2024-02-11
Lun 11:37 Sarasota/Bradenton (SRQ) 14:40 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 3:03 Operates only on 2024-01-08
Jeu,Dim 11:46 Sarasota/Bradenton (SRQ) 14:39 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 2:53 Effective 2024-02-15 through 2024-03-03
Mer 13:35 Sanford, Orlando (SFB) 16:20 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 2:45 Effective 2024-01-31 through 2024-02-07
Mer 13:37 Sanford, Orlando (SFB) 16:26 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 2:49 Effective 2024-01-10 through 2024-01-24
Jeu 13:56 Flint (FNT) 14:52 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:56 Operates only on 2024-03-14
Lun,Ven 14:05 Flint (FNT) 15:38 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
G4 1528 Non-stop Airbus A320 (320) 4:33 Effective 2024-05-17 through 2024-06-03
Lun,Ven 14:24 Flint (FNT) 15:39 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
G4 1528 Non-stop Airbus A320 (320) 4:15 Effective 2024-07-05 through 2024-08-12
Lun,Ven 14:29 Flint (FNT) 15:48 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
G4 1528 Non-stop Airbus A320 (320) 4:19 Effective 2024-06-07 through 2024-07-01
Mar 15:20 Flint (FNT) 18:23 Sarasota/Bradenton (SRQ)
G4 1528 Non-stop Airbus A320 (320) 3:03 Valid until 2024-01-02
Jeu 15:39 Flint (FNT) 16:37 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:58 Effective 2024-01-11 through 2024-01-25
Dim 15:42 Nashville (BNA) 18:20 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 1:38 Operates only on 2024-03-17
Mer 16:30 Flint (FNT) 17:28 Nashville (BNA)
G4 1528 Non-stop Airbus A320 (320) 1:58 Operates only on 2024-01-03
Sam 19:24 Sarasota/Bradenton (SRQ) 22:20 Flint (FNT)
G4 1528 Non-stop Airbus A320 (320) 2:56 Operates only on 2024-04-06
This flight number is listed as serving the following routes:
Allegiant Air vol G4 1528: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Allegiant Air G41528
Operates only on 2024-03-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:32, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-03-16 through 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:32, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-04-04 through 2024-04-11
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 3:02, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-04-13 through 2024-04-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 3:02, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-02-20 through 2024-03-05
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:56, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-03-13 through 2024-03-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:32, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-04-03 through 2024-04-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:24, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-04-05 through 2024-04-22
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:02, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-05-01 through 2024-05-08
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:08, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-01-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:49, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-01-16 through 2024-01-23
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:58, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-01-30
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:58, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-02-06 through 2024-02-13
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:52, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-02-01 through 2024-02-11
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:53, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-01-08
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:03, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-02-15 through 2024-03-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:53, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-01-31 through 2024-02-07
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:45, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-01-10 through 2024-01-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:49, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-03-14
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:56, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-05-17 through 2024-06-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:33, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-07-05 through 2024-08-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:15, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-06-07 through 2024-07-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:19, non-stop
Airbus A320 (320)

Allegiant Air G41528
Valid until 2024-01-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:03, non-stop
Airbus A320 (320)

Allegiant Air G41528
Effective 2024-01-11 through 2024-01-25
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:58, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-03-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:38, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-01-03
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:58, non-stop
Airbus A320 (320)

Allegiant Air G41528
Operates only on 2024-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:56, non-stop
Airbus A320 (320)
This flight number is listed as serving the following routes:
  • Flint (FNT) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Flint (FNT) - Mesa Gateway, Phoenix (AZA)
  • Flint (FNT) - Sarasota/Bradenton (SRQ)
  • Nashville (BNA) - Flint (FNT)
  • Sanford, Orlando (SFB) - Flint (FNT)