Aerolineas Argentinas vol AR 1658: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Mer,Sam,Dim 12:20 Jorge Newbery, Buenos Aires (AEP) 14:40 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-04-08 through 2024-06-30
Mar,Ven 12:20 Jorge Newbery, Buenos Aires (AEP) 14:40 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 2:20 Effective 2024-04-09 through 2024-06-28
Jeu 12:20 Jorge Newbery, Buenos Aires (AEP) 14:40 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-700 (73R) 2:20 Effective 2024-04-11 through 2024-06-27
Mar,Jeu,Dim 12:20 Jorge Newbery, Buenos Aires (AEP) 14:40 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-07-02 through 2024-09-29
Mer,Ven,Sam 12:20 Jorge Newbery, Buenos Aires (AEP) 14:40 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 2:20 Effective 2024-07-03 through 2024-09-28
Lun 12:50 Jorge Newbery, Buenos Aires (AEP) 15:10 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-07-01 through 2024-09-30
Lun,Mer,Jeu,Sam 13:05 Jorge Newbery, Buenos Aires (AEP) 15:25 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-04-01 through 2024-04-06
Mar,Ven 13:05 Jorge Newbery, Buenos Aires (AEP) 15:25 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 2:20 Effective 2024-04-02 through 2024-04-05
Dim 13:05 Ministro Pistarini, Buenos Aires (EZE) B 15:25 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Operates only on 2024-04-07
Mar 13:25 Jorge Newbery, Buenos Aires (AEP) 15:45 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 2:20 Effective from 2024-10-01
Lun,Mer,Sam,Dim 13:25 Ministro Pistarini, Buenos Aires (EZE) B 15:45 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 2:20 Effective 2024-10-02 through 2024-10-26
Ven 13:25 Ministro Pistarini, Buenos Aires (EZE) B 15:45 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-10-04 through 2024-10-25
Dim 13:25 Ministro Pistarini, Buenos Aires (EZE) B 15:45 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective from 2024-10-27
Lun,Mer,Ven,Sam 13:25 Ministro Pistarini, Buenos Aires (EZE) B 15:45 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 2:20 Effective from 2024-10-28
Jeu 13:40 Ministro Pistarini, Buenos Aires (EZE) B 16:00 San Martin los Andes (CPC)
AR 1658 Non-stop Boeing 737-800 (738) 2:20 Effective from 2024-10-03
Ven,Dim 16:15 Jorge Newbery, Buenos Aires (AEP) 18:10 Neuquen (NQN)
AR 1658 Non-stop Boeing 737-800 (738) 1:55 Effective 2024-03-01 through 2024-03-31
Lun 16:45 Jorge Newbery, Buenos Aires (AEP) 18:40 Neuquen (NQN)
AR 1658 Non-stop Boeing 737-800 (738) 1:55 Operates only on 2024-03-04
Lun 16:45 Jorge Newbery, Buenos Aires (AEP) 18:40 Neuquen (NQN)
AR 1658 Non-stop Boeing 737-200 Combi (73M) 1:55 Effective 2024-03-11 through 2024-03-18
Lun 16:45 Jorge Newbery, Buenos Aires (AEP) 18:40 Neuquen (NQN)
AR 1658 Non-stop Boeing 737-800 (738) 1:55 Operates only on 2024-03-25
This flight number is listed as serving the following routes:
Aerolineas Argentinas vol AR 1658: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Aerolineas Argentinas AR1658
Effective 2024-04-08 through 2024-06-30
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective 2024-04-09 through 2024-06-28
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Effective 2024-04-11 through 2024-06-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73R)

Aerolineas Argentinas AR1658
Effective 2024-07-02 through 2024-09-29
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective 2024-07-03 through 2024-09-28
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Effective 2024-07-01 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective 2024-04-01 through 2024-04-06
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective 2024-04-02 through 2024-04-05
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Operates only on 2024-04-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective from 2024-10-01
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Effective 2024-10-02 through 2024-10-26
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Duration: 2:20, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Effective 2024-10-04 through 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective from 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective from 2024-10-28
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Effective from 2024-10-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective 2024-03-01 through 2024-03-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Operates only on 2024-03-04
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1658
Effective 2024-03-11 through 2024-03-18
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1658
Operates only on 2024-03-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (738)
This flight number is listed as serving the following routes:
  • Jorge Newbery, Buenos Aires (AEP) - Neuquen (NQN)
  • Jorge Newbery, Buenos Aires (AEP) - San Martin los Andes (CPC)
  • Ministro Pistarini, Buenos Aires (EZE) - San Martin los Andes (CPC)