Volotea flight V7 3830: Sevilla - Asturias

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue 08:35 Sevilla (SVQ) 10:00 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-12-24 through 2024-12-31
Sat 09:15 Sevilla (SVQ) 10:40 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Operates only on 2024-11-02
Sat 09:15 Sevilla (SVQ) 10:40 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-11-09 through 2025-01-04
Sat 09:15 Sevilla (SVQ) 10:40 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2025-02-22 through 2025-03-29
Sat 09:25 Sevilla (SVQ) 10:50 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2024-10-12 through 2024-10-26
Thu 12:00 Sevilla (SVQ) 13:25 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2024-10-10 through 2024-10-31
Mon 13:05 Sevilla (SVQ) 14:30 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2025-01-13 through 2025-02-17
Wed 13:10 Sevilla (SVQ) 14:35 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-25 through 2024-10-02
Thu 13:15 Sevilla (SVQ) 14:40 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-12-19 through 2025-01-02
Mon 13:20 Sevilla (SVQ) 14:45 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-11-11 through 2024-12-16
Mon 13:20 Sevilla (SVQ) 14:45 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2025-02-24 through 2025-03-24
Wed 13:25 Sevilla (SVQ) 14:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-04 through 2024-09-18
Sun 13:35 Sevilla (SVQ) 15:00 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Valid until 2024-09-01
Sat 16:00 Sevilla (SVQ) 17:25 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-07 through 2024-10-05
Sun 17:00 Sevilla (SVQ) 18:25 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2024-10-27 through 2024-11-03
Sun 17:05 Sevilla (SVQ) 18:30 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2024-10-13 through 2024-10-20
Thu 17:25 Sevilla (SVQ) 18:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-11-07 through 2024-12-12
Thu 17:25 Sevilla (SVQ) 18:50 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2025-01-09 through 2025-02-13
Thu 17:25 Sevilla (SVQ) 18:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2025-02-20 through 2025-03-27
Wed 17:35 Sevilla (SVQ) 19:00 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-10-30
Wed 17:40 Sevilla (SVQ) 19:05 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-10-09 through 2024-10-23
Sun 17:55 Sevilla (SVQ) 19:20 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2024-12-22 through 2025-01-05
Fri,Sun 20:55 Sevilla (SVQ) 22:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-11-08 through 2024-12-15
Sun 20:55 Sevilla (SVQ) 22:20 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2025-01-12 through 2025-02-16
Fri,Sun 20:55 Sevilla (SVQ) 22:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2025-02-21 through 2025-03-28
Mon 21:15 Sevilla (SVQ) 22:40 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-10-07 through 2024-11-04
Mon,Fri 21:25 Sevilla (SVQ) 22:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-12-20 through 2025-01-06
Fri 21:30 Sevilla (SVQ) 22:55 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-10-11 through 2024-10-25
Fri 21:45 Sevilla (SVQ) 23:10 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Valid until 2024-10-04
Fri 21:45 Sevilla (SVQ) 23:10 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-11-01
Mon,Tue 21:55 Sevilla (SVQ) 23:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Valid until 2024-09-16
Mon 21:55 Sevilla (SVQ) 23:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-23 through 2024-09-30
Tue 21:55 Sevilla (SVQ) 23:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-10-08 through 2024-10-29
Wed 21:55 Sevilla (SVQ) 23:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-12-25 through 2025-01-01
Fri 21:55 Sevilla (SVQ) 23:20 Asturias (OVD)
V7 3830 Non-stop Airbus A320 (320) 1:25 Effective 2025-01-10 through 2025-02-14
Sun 22:25 Sevilla (SVQ) 23:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-08 through 2024-09-15
Tue,Sun 22:25 Sevilla (SVQ) 23:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-17 through 2024-09-24
Tue 22:25 Sevilla (SVQ) 23:50 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-10-01
Thu 22:50 Sevilla (SVQ) 00:15 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Valid until 2024-10-03
The flight arrives 1 day after departure.
Sun 22:55 Sevilla (SVQ) 00:20 Asturias (OVD)
V7 3830 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-29 through 2024-10-06
The flight arrives 1 day after departure.
Volotea flight V7 3830:
Sevilla - Asturias
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Volotea V73830
Effective 2024-12-24 through 2024-12-31
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Operates only on 2024-11-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-11-09 through 2025-01-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2025-02-22 through 2025-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-10-12 through 2024-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-10-10 through 2024-10-31
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2025-01-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-09-25 through 2024-10-02
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-12-19 through 2025-01-02
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-11-11 through 2024-12-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2025-02-24 through 2025-03-24
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-09-04 through 2024-09-18
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Valid until 2024-09-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-09-07 through 2024-10-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-10-27 through 2024-11-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-10-13 through 2024-10-20
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-11-07 through 2024-12-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2025-01-09 through 2025-02-13
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2025-02-20 through 2025-03-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Operates only on 2024-10-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-10-09 through 2024-10-23
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-12-22 through 2025-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-11-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2025-01-12 through 2025-02-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2025-02-21 through 2025-03-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-10-07 through 2024-11-04
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-12-20 through 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-10-11 through 2024-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Valid until 2024-10-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Operates only on 2024-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Valid until 2024-09-16
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-09-23 through 2024-09-30
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-10-08 through 2024-10-29
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-12-25 through 2025-01-01
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2025-01-10 through 2025-02-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A320 (320)

Volotea V73830
Effective 2024-09-08 through 2024-09-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Effective 2024-09-17 through 2024-09-24
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
Operates only on 2024-10-01
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73830
22:50

00:15(+1)
Valid until 2024-10-03
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Airbus A319 (319)
The flight arrives 1 day after departure.

Volotea V73830
22:55

00:20(+1)
Effective 2024-09-29 through 2024-10-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Airbus A319 (319)
The flight arrives 1 day after departure.
  • V7 3830 is a domestic flight departing from the Sevilla airport (SVQ) and arriving at Asturias airport (OVD).
  • The flight distance is 424 miles, or 683 km.
  • The timezone of both the departure and the arrival airports is UTC+1 . Current time at both airports is (loading...).
  • For direct flights, the flight time is 1:25.