Singapore Airlines flight SQ 6679: Perth - Sydney

Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:
Tue 05:10 Perth (PER) 1 12:30 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-10-08 through 2024-10-22
Codeshare flight, operated by Virgin Australia.(VA 550)
Tue 05:10 Perth (PER) 1 12:25 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:15 Effective 2024-10-29 through 2025-03-25
Codeshare flight, operated by Virgin Australia.(VA 550)
Wed 05:55 Perth (PER) 1 13:15 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-10-09 through 2024-10-23
Codeshare flight, operated by Virgin Australia.(VA 550)
Wed 05:55 Perth (PER) 1 13:10 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:15 Effective 2024-10-30 through 2025-03-26
Codeshare flight, operated by Virgin Australia.(VA 550)
Fri 06:00 Perth (PER) 1 13:20 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-10-11 through 2024-10-25
Codeshare flight, operated by Virgin Australia.(VA 550)
Tue,Wed 06:00 Perth (PER) 1 13:15 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:15 Effective 2025-04-01 through 2025-04-02
Codeshare flight, operated by Virgin Australia.(VA 550)
Fri,Sat 07:00 Perth (PER) 1 13:20 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-09-06 through 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 552)
Sat 07:00 Perth (PER) 1 14:20 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 552)
Fri 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2025-04-11
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-04-12 through 2025-04-18
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-04-19 through 2025-04-25
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-04-26 through 2025-05-02
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-05-03 through 2025-05-09
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-05-10 through 2025-05-16
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-05-17 through 2025-05-23
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-05-24 through 2025-05-30
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-05-31 through 2025-06-06
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-06-07 through 2025-06-13
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-06-14 through 2025-06-20
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-06-21 through 2025-06-27
Codeshare flight, operated by Virgin Australia.(VA 558)
Fri,Sat 11:15 Perth (PER) 1 17:35 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-06-28
Codeshare flight, operated by Virgin Australia.(VA 558)
Mon,Thu,Fri,Sun 22:55 Perth (PER) 1 06:10 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:15 Effective 2024-10-27 through 2025-01-24
Codeshare flight, operated by Virgin Australia.(VA 570)
The flight arrives 1 day after departure.
Mon,Thu,Fri,Sun 22:55 Perth (PER) 1 06:10 Sydney (SYD) 2
SQ 6679 Non-stop Boeing 737-800 (73H) 4:15 Effective 2025-01-27 through 2025-04-04
Codeshare flight, operated by Virgin Australia.(VA 570)
The flight arrives 1 day after departure.
Singapore Airlines flight SQ 6679:
Perth - Sydney
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:

Singapore Airlines SQ6679
05:10

12:30
Effective 2024-10-08 through 2024-10-22
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 550)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
05:10

12:25
Effective 2024-10-29 through 2025-03-25
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 550)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
05:55

13:15
Effective 2024-10-09 through 2024-10-23
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 550)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
05:55

13:10
Effective 2024-10-30 through 2025-03-26
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 550)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
06:00

13:20
Effective 2024-10-11 through 2024-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 550)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
06:00

13:15
Effective 2025-04-01 through 2025-04-02
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 550)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
07:00

13:20
Effective 2024-09-06 through 2024-10-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 552)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
07:00

14:20
Effective 2024-10-12 through 2024-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 552)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Operates only on 2025-04-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-04-12 through 2025-04-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-04-19 through 2025-04-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-04-26 through 2025-05-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-05-03 through 2025-05-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-05-10 through 2025-05-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-05-17 through 2025-05-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-05-24 through 2025-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-05-31 through 2025-06-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-06-07 through 2025-06-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-06-14 through 2025-06-20
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
11:15

17:35
Effective 2025-06-21 through 2025-06-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Singapore Airlines SQ6679
11:15

17:35
Effective from 2025-06-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Virgin Australia. (VA 558)
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Singapore Airlines SQ6679
22:55

06:10(+1)
Effective 2024-10-27 through 2025-01-24
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 570)
Duration: 4:15, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Singapore Airlines SQ6679
22:55

06:10(+1)
Effective 2025-01-27 through 2025-04-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by Virgin Australia. (VA 570)
Duration: 4:15, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.
  • SQ 6679 is a domestic flight departing from the Perth airport (PER) and arriving at Sydney airport (SYD).
  • The flight distance is 2035 miles, or 3275 km.
  • The timezone of the departure airport is UTC+8 , and the timezone of the arrival airport is UTC+10 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:15 and 4:20.