FLIGHT SCHEDULE |
---|
Direct Codeshare Flights: |
Sat
09:25
Catania (CTA)
11:40
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A320 (320) 2:15 Effective 2024-11-02 through 2025-03-29 Codeshare flight, operated by Vueling.(VY 6535) |
Sun
09:35
Catania (CTA)
11:50
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A321 (321) 2:15 Effective 2024-10-27 through 2025-03-23 Codeshare flight, operated by Vueling.(VY 6535) |
Fri
15:05
Catania (CTA)
17:20
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A320 (320) 2:15 Effective 2024-11-01 through 2025-01-03 Codeshare flight, operated by Vueling.(VY 6535) |
Fri
15:05
Catania (CTA)
17:20
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A320 (320) 2:15 Effective 2025-02-07 through 2025-03-28 Codeshare flight, operated by Vueling.(VY 6535) |
Tue,Thu
15:10
Catania (CTA)
17:25
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A321 (321) 2:15 Effective 2024-10-29 through 2024-11-05 Codeshare flight, operated by Vueling.(VY 6535) |
Thu
15:10
Catania (CTA)
17:25
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A320 (320) 2:15 Effective 2024-11-07 through 2025-03-27 Codeshare flight, operated by Vueling.(VY 6535) |
Tue
15:10
Catania (CTA)
17:25
Barcelona (BCN) 1 IB 5626 Non-stop Airbus A321 (321) 2:15 Effective 2024-11-12 through 2025-03-25 Codeshare flight, operated by Vueling.(VY 6535) |
Tue,Sat
16:55
Gran Canaria (LPA)
20:50
Asturias (OVD) IB 5626 Non-stop Airbus A320 (320) 2:55 Valid until 2024-10-26 Codeshare flight, operated by Vueling.(VY 6574) |
Thu
17:20
Gran Canaria (LPA)
21:15
Asturias (OVD) IB 5626 Non-stop Airbus A320 (320) 2:55 Valid until 2024-10-24 Codeshare flight, operated by Vueling.(VY 6574) |