Air Arabia PJSC flight G9 721: Entebbe - Sharjah

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon,Tue,Thu,Sat,Sun 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-03-31 through 2024-04-11
Wed,Fri 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Effective 2024-04-03 through 2024-04-10
Daily 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-04-12 through 2024-04-21
Mon 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Effective 2024-04-22 through 2024-04-29
Tue-Sun 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-04-23 through 2024-05-05
Mon,Tue,Thu,Sat,Sun 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-05-06 through 2024-05-14
Wed,Fri 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Effective 2024-05-08 through 2024-05-10
Mon-Thu,Sat,Sun 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-05-15 through 2024-05-23
Fri 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Operates only on 2024-05-17
Tue-Sun 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-05-24 through 2024-06-02
Mon 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Operates only on 2024-05-27
Daily 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-06-03 through 2024-06-11
Wed 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Operates only on 2024-06-12
Daily 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-06-13 through 2024-06-30
Mon 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A320 (320) 5:45 Operates only on 2024-07-01
Daily 14:25 Entebbe (EBB) 21:10 Sharjah (SHJ)
G9 721 Non-stop Airbus A321 (321) 5:45 Effective 2024-07-02 through 2024-10-26
Air Arabia PJSC flight G9 721:
Entebbe - Sharjah
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Air Arabia PJSC G9721
Effective 2024-03-31 through 2024-04-11
Mon
Tue
Wed
-
Thu
Fri
-
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Effective 2024-04-03 through 2024-04-10
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-04-12 through 2024-04-21
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Effective 2024-04-22 through 2024-04-29
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-04-23 through 2024-05-05
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Effective 2024-05-06 through 2024-05-14
Mon
Tue
Wed
-
Thu
Fri
-
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Effective 2024-05-08 through 2024-05-10
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-05-15 through 2024-05-23
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Operates only on 2024-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-05-24 through 2024-06-02
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Operates only on 2024-05-27
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-06-03 through 2024-06-11
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Operates only on 2024-06-12
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-06-13 through 2024-06-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)

Air Arabia PJSC G9721
Operates only on 2024-07-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:45, non-stop
Airbus A320 (320)

Air Arabia PJSC G9721
Effective 2024-07-02 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:45, non-stop
Airbus A321 (321)
  • G9 721 is an international flight departing from Entebbe airport, Uganda (EBB) and arriving at Sharjah airport, United Arab Emirates (SHJ).
  • The flight distance is 2328 miles, or 3746 km.
  • The timezone of the departure airport is UTC+3 , and the timezone of the arrival airport is UTC+4 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time is 5:45.