Todas las líneas aéreas volando desde Tucson (TUS) a Denver (DEN).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Sab 09:45 Tucson (TUS) 12:40 Denver (DEN)
Southwest Airlines WN 3077 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-05 through 2024-11-02
Lun-Mie 14:00 Tucson (TUS) 15:55 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 14:00 Tucson (TUS) 15:55 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-12-20 through 2025-01-02
Dom 14:00 Tucson (TUS) 15:55 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2025-01-05
Jue,Vie,Dom 19:20 Tucson (TUS) 21:20 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 19:20 Tucson (TUS) 21:20 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-11 through 2024-11-25
Vie,Dom 19:20 Tucson (TUS) 21:20 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-08 through 2024-12-15
Jue 19:20 Tucson (TUS) 21:20 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2024-12-19
Vie 19:20 Tucson (TUS) 21:20 Denver (DEN)
Southwest Airlines WN 3143 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-01-03
Lun,Jue,Vie 13:05 Tucson (TUS) 16:00 Denver (DEN)
Southwest Airlines WN 3236 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-03 through 2024-10-28
Vie 13:05 Tucson (TUS) 16:00 Denver (DEN)
Southwest Airlines WN 3236 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-11-01
Jue,Vie,Dom 05:05 Tucson (TUS) 07:05 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-01-12 through 2025-01-17
Lun,Dom 05:05 Tucson (TUS) 07:05 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 05:05 Tucson (TUS) 07:05 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-02 through 2025-02-07
Lun 05:05 Tucson (TUS) 07:05 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2025-02-10
Lun,Mar,Jue 05:05 Tucson (TUS) 07:05 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-18 through 2025-02-24
Lun 05:05 Tucson (TUS) 07:05 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2025-03-03
Sab 05:10 Tucson (TUS) 07:00 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-11-09 through 2024-11-16
Sab 05:10 Tucson (TUS) 07:00 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-11-23 through 2024-11-30
Dom 05:10 Tucson (TUS) 07:00 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2024-12-01
Sab 05:10 Tucson (TUS) 07:00 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-12-07 through 2024-12-14
Sab 05:10 Tucson (TUS) 07:00 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-12-21 through 2025-01-04
Lun-Vie 05:10 Tucson (TUS) 07:10 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 05:10 Tucson (TUS) 07:10 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-01-19 through 2025-01-24
Lun-Vie 05:10 Tucson (TUS) 07:10 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 05:10 Tucson (TUS) 07:10 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-09 through 2025-02-12
Mar,Mie 05:10 Tucson (TUS) 07:10 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-19 through 2025-03-05
Sab 05:25 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-02-15 through 2025-03-01
Jue,Vie,Dom 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-11-11 through 2024-11-25
Vie,Dom 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2024-12-08 through 2024-12-15
Jue 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2024-12-19
Vie 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-01-03
Lun,Jue,Vie,Dom 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 05:30 Tucson (TUS) 07:20 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-02-21 through 2025-03-02
Sab 05:50 Tucson (TUS) 07:40 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-01-11 through 2025-02-08
Lun-Mie 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-11-04 through 2024-11-06
Mar,Mie 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-11-12 through 2024-11-20
Jue 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2024-11-28
Mar-Vie 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-11-29 through 2024-12-06
Lun-Jue 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-09 through 2024-12-18
Mar,Mie 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-24 through 2025-01-01
Lun 06:00 Tucson (TUS) 07:50 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2025-01-06
Lun-Mie 19:45 Tucson (TUS) 21:45 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 19:45 Tucson (TUS) 21:45 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-12-20 through 2025-01-02
Dom 19:45 Tucson (TUS) 21:45 Denver (DEN)
Southwest Airlines WN 3267 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Operates only on 2025-01-05
Dom 16:05 Tucson (TUS) 19:00 Denver (DEN)
Southwest Airlines WN 3278 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-09-08 through 2024-09-29
Jue,Vie,Dom 16:05 Tucson (TUS) 18:00 Denver (DEN)
Southwest Airlines WN 3357 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 16:05 Tucson (TUS) 18:00 Denver (DEN)
Southwest Airlines WN 3357 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-11 through 2024-11-25
Vie,Dom 16:05 Tucson (TUS) 18:00 Denver (DEN)
Southwest Airlines WN 3357 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-08 through 2024-12-15
prev   1 2 3 4 5 6 7   next


Todas las líneas aéreas volando desde Tucson (TUS) a Denver (DEN).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-700 (73W)
prev        Page 3 / 7        next
  • Una ruta nacional saliendo desde el aeropuerto Tucson (TUS) y llegando al aeropuerto Denver (DEN).
  • El vuelo tiene una distancia de 639 millas, o 1028 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC-7 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:50 y 2:10.