Todas las líneas aéreas volando desde Midway, Chicago (MDW) a Charleston (CHS).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Sab 14:50 Midway, Chicago (MDW) 17:50 Charleston (CHS)
Southwest Airlines WN 236 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-23 through 2024-11-30
Sab 14:50 Midway, Chicago (MDW) 17:50 Charleston (CHS)
Southwest Airlines WN 236 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-21 through 2025-01-04
Dom 20:40 Midway, Chicago (MDW) 23:40 Charleston (CHS)
Southwest Airlines WN 970 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2024-12-01
Lun-Mie 16:00 Midway, Chicago (MDW) 19:00 Charleston (CHS)
Southwest Airlines WN 1472 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 16:00 Midway, Chicago (MDW) 19:00 Charleston (CHS)
Southwest Airlines WN 1472 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-20 through 2025-01-02
Dom 16:00 Midway, Chicago (MDW) 19:00 Charleston (CHS)
Southwest Airlines WN 1472 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-01-05
Dom 10:05 Midway, Chicago (MDW) 13:10 Charleston (CHS)
Southwest Airlines WN 1678 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-12-01
Dom 14:25 Midway, Chicago (MDW) 17:30 Charleston (CHS)
Southwest Airlines WN 2492 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2024-09-01
Sab 13:20 Midway, Chicago (MDW) 16:20 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-11-09 through 2024-11-16
Sab 13:20 Midway, Chicago (MDW) 16:20 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-12-07 through 2024-12-14
Jue,Vie,Dom 13:55 Midway, Chicago (MDW) 16:55 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 13:55 Midway, Chicago (MDW) 16:55 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-11 through 2024-11-25
Vie,Dom 13:55 Midway, Chicago (MDW) 16:55 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-08 through 2024-12-15
Jue 13:55 Midway, Chicago (MDW) 16:55 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2024-12-19
Vie 13:55 Midway, Chicago (MDW) 16:55 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-01-03
Jue,Vie,Dom 15:00 Midway, Chicago (MDW) 18:00 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-01-12 through 2025-01-17
Lun,Dom 15:00 Midway, Chicago (MDW) 18:00 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 15:00 Midway, Chicago (MDW) 18:00 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-02-02 through 2025-02-07
Lun 15:00 Midway, Chicago (MDW) 18:00 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-02-10
Lun,Mar,Jue 15:00 Midway, Chicago (MDW) 18:00 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-02-18 through 2025-02-24
Lun 15:00 Midway, Chicago (MDW) 18:00 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-03-03
Sab 15:45 Midway, Chicago (MDW) 18:45 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-02-15 through 2025-03-01
Lun,Jue,Vie,Dom 16:20 Midway, Chicago (MDW) 19:20 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 16:20 Midway, Chicago (MDW) 19:20 Charleston (CHS)
Southwest Airlines WN 2621 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-21 through 2025-03-02
Dom 11:50 Midway, Chicago (MDW) 14:55 Charleston (CHS)
Southwest Airlines WN 3305 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-09-08 through 2024-09-29
Lun,Jue,Vie 13:05 Midway, Chicago (MDW) 16:10 Charleston (CHS)
Southwest Airlines WN 3305 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Valid until 2024-09-30
Mar,Mie 14:20 Midway, Chicago (MDW) 17:20 Charleston (CHS)
Southwest Airlines WN 3305 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Valid until 2024-10-02
Sab 14:35 Midway, Chicago (MDW) 17:40 Charleston (CHS)
Southwest Airlines WN 3305 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Valid until 2024-09-28
Dom 08:30 Midway, Chicago (MDW) 11:35 Charleston (CHS)
Southwest Airlines WN 3334 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-10-06 through 2024-10-27
Dom 20:40 Midway, Chicago (MDW) 23:40 Charleston (CHS)
Southwest Airlines WN 4224 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-09-08 through 2024-09-29
Sab 10:45 Midway, Chicago (MDW) 13:50 Charleston (CHS)
Southwest Airlines WN 4458 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-05 through 2024-11-02
Jue 14:20 Midway, Chicago (MDW) 17:25 Charleston (CHS)
Southwest Airlines WN 4458 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2024-10-31
Mar,Mie 15:15 Midway, Chicago (MDW) 18:15 Charleston (CHS)
Southwest Airlines WN 4458 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-10-08 through 2024-10-30
Lun,Jue,Vie 16:10 Midway, Chicago (MDW) 19:10 Charleston (CHS)
Southwest Airlines WN 4458 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-10-03 through 2024-10-28
Vie 16:10 Midway, Chicago (MDW) 19:10 Charleston (CHS)
Southwest Airlines WN 4458 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2024-11-01
Dom 20:35 Midway, Chicago (MDW) 23:35 Charleston (CHS)
Southwest Airlines WN 4458 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-10-06 through 2024-10-27
Vuelos no directos:
Sab 08:00 Midway, Chicago (MDW) 12:35 Charleston (CHS)
Southwest Airlines WN 1324 1-stop Boeing 737-700 (73W) 3:35 Effective 2025-02-15 through 2025-03-01
Jue,Vie,Dom 13:20 Midway, Chicago (MDW) 20:40 Charleston (CHS)
Southwest Airlines WN 977 2-stop Boeing 737-700 (73W) 6:20 Effective 2025-01-12 through 2025-01-17
Lun,Dom 13:20 Midway, Chicago (MDW) 20:40 Charleston (CHS)
Southwest Airlines WN 977 2-stop Boeing 737-700 (73W) 6:20 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 13:20 Midway, Chicago (MDW) 20:40 Charleston (CHS)
Southwest Airlines WN 977 2-stop Boeing 737-700 (73W) 6:20 Effective 2025-02-02 through 2025-02-07
Lun 13:20 Midway, Chicago (MDW) 20:40 Charleston (CHS)
Southwest Airlines WN 977 2-stop Boeing 737-700 (73W) 6:20 Operates only on 2025-02-10
Lun,Mar,Jue 13:20 Midway, Chicago (MDW) 20:40 Charleston (CHS)
Southwest Airlines WN 977 2-stop Boeing 737-700 (73W) 6:20 Effective 2025-02-18 through 2025-02-24
Lun 13:20 Midway, Chicago (MDW) 20:40 Charleston (CHS)
Southwest Airlines WN 977 2-stop Boeing 737-700 (73W) 6:20 Operates only on 2025-03-03


Todas las líneas aéreas volando desde Midway, Chicago (MDW) a Charleston (CHS).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos no directos:

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 6:20, 2-stop
Boeing 737-700 (73W)
  • Una ruta nacional saliendo desde el aeropuerto Midway, Chicago (MDW) y llegando al aeropuerto Charleston (CHS).
  • El vuelo tiene una distancia de 745 millas, o 1198 km.
  • La zona horaria del aeropuerto de salida es UTC-6 , y la zona horario del aeropuerto de llegada es UTC-5 . La hora actual en el punto de salida es (loading...), y (loading...) en el punto de llegada. Hay una diferencia de tiempo de (loading...) hora/s entre los aeropuertos.
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:00 y 2:05.