Todas las líneas aéreas volando desde Las Vegas Harry Reid (LAS) a Houston Hobby (HOU).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Sab 20:30 Las Vegas Harry Reid (LAS) 1 01:20 Houston Hobby (HOU)
Southwest Airlines WN 1274 Non-stop Boeing 737-800 (73H) 2:50 Effective 2024-11-23 through 2024-11-30
The flight arrives 1 day after departure.
Sab 20:30 Las Vegas Harry Reid (LAS) 1 01:20 Houston Hobby (HOU)
Southwest Airlines WN 1274 Non-stop Boeing 737-800 (73H) 2:50 Effective 2024-12-21 through 2025-01-04
The flight arrives 1 day after departure.
Lun-Mie 14:55 Las Vegas Harry Reid (LAS) 1 19:50 Houston Hobby (HOU)
Southwest Airlines WN 1379 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 14:55 Las Vegas Harry Reid (LAS) 1 19:50 Houston Hobby (HOU)
Southwest Airlines WN 1379 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-12-20 through 2025-01-02
Dom 14:55 Las Vegas Harry Reid (LAS) 1 19:50 Houston Hobby (HOU)
Southwest Airlines WN 1379 Non-stop Boeing 737-700 (73W) 2:55 Operates only on 2025-01-05
Jue,Vie,Dom 10:40 Las Vegas Harry Reid (LAS) 1 15:35 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-01-12 through 2025-01-17
Lun,Dom 10:40 Las Vegas Harry Reid (LAS) 1 15:35 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 10:40 Las Vegas Harry Reid (LAS) 1 15:35 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-02-02 through 2025-02-07
Lun 10:40 Las Vegas Harry Reid (LAS) 1 15:35 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Operates only on 2025-02-10
Lun,Mar,Jue 10:40 Las Vegas Harry Reid (LAS) 1 15:35 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-02-18 through 2025-02-24
Lun 10:40 Las Vegas Harry Reid (LAS) 1 15:35 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Operates only on 2025-03-03
Lun,Jue,Vie,Dom 11:55 Las Vegas Harry Reid (LAS) 1 16:50 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-800 (73H) 2:55 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 11:55 Las Vegas Harry Reid (LAS) 1 16:50 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-800 (73H) 2:55 Effective 2025-02-21 through 2025-03-02
Jue 12:05 Las Vegas Harry Reid (LAS) 1 17:00 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Operates only on 2024-11-28
Lun-Vie 12:05 Las Vegas Harry Reid (LAS) 1 17:00 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-700 (73W) 2:55 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 12:05 Las Vegas Harry Reid (LAS) 1 17:00 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-700 (73W) 2:55 Effective 2025-01-19 through 2025-01-24
Lun-Vie 12:05 Las Vegas Harry Reid (LAS) 1 17:00 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-700 (73W) 2:55 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 12:05 Las Vegas Harry Reid (LAS) 1 17:00 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-700 (73W) 2:55 Effective 2025-02-09 through 2025-02-12
Mar,Mie 12:05 Las Vegas Harry Reid (LAS) 1 17:00 Houston Hobby (HOU)
Southwest Airlines WN 1645 Non-stop Boeing 737-700 (73W) 2:55 Effective 2025-02-19 through 2025-03-05
Dom 18:25 Las Vegas Harry Reid (LAS) 1 23:15 Houston Hobby (HOU)
Southwest Airlines WN 1662 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2024-11-03
Lun,Jue,Vie,Dom 18:25 Las Vegas Harry Reid (LAS) 1 23:15 Houston Hobby (HOU)
Southwest Airlines WN 1662 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-11-07 through 2024-11-25
Vie,Dom 18:25 Las Vegas Harry Reid (LAS) 1 23:15 Houston Hobby (HOU)
Southwest Airlines WN 1662 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-12-08 through 2024-12-15
Jue 18:25 Las Vegas Harry Reid (LAS) 1 23:15 Houston Hobby (HOU)
Southwest Airlines WN 1662 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2024-12-19
Vie 18:25 Las Vegas Harry Reid (LAS) 1 23:15 Houston Hobby (HOU)
Southwest Airlines WN 1662 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2025-01-03
Dom 08:05 Las Vegas Harry Reid (LAS) 1 13:00 Houston Hobby (HOU)
Southwest Airlines WN 1737 Non-stop Boeing 737-800 (73H) 2:55 Operates only on 2024-12-01
Lun-Mie 12:15 Las Vegas Harry Reid (LAS) 1 17:15 Houston Hobby (HOU)
Southwest Airlines WN 1737 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 12:15 Las Vegas Harry Reid (LAS) 1 17:15 Houston Hobby (HOU)
Southwest Airlines WN 1737 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-12-20 through 2025-01-02
Dom 12:15 Las Vegas Harry Reid (LAS) 1 17:15 Houston Hobby (HOU)
Southwest Airlines WN 1737 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2025-01-05
Lun,Jue,Vie 10:40 Las Vegas Harry Reid (LAS) 1 15:45 Houston Hobby (HOU)
Southwest Airlines WN 1884 Non-stop Boeing 737-700 (73W) 3:05 Effective 2024-10-03 through 2024-10-28
Vie 10:40 Las Vegas Harry Reid (LAS) 1 15:45 Houston Hobby (HOU)
Southwest Airlines WN 1884 Non-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-11-01
Jue,Vie,Dom 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-11-11 through 2024-11-25
Dom 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2024-12-01
Vie,Dom 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-12-08 through 2024-12-15
Jue 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2024-12-19
Vie 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2025-01-03
Sab 05:00 Las Vegas Harry Reid (LAS) 1 09:50 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-01-11 through 2025-02-08
Jue,Vie,Dom 05:10 Las Vegas Harry Reid (LAS) 1 10:00 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-01-12 through 2025-01-17
Lun,Dom 05:10 Las Vegas Harry Reid (LAS) 1 10:00 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 05:10 Las Vegas Harry Reid (LAS) 1 10:00 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-02 through 2025-02-07
Lun 05:10 Las Vegas Harry Reid (LAS) 1 10:00 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2025-02-10
Lun,Mar,Jue 05:10 Las Vegas Harry Reid (LAS) 1 10:00 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-18 through 2025-02-24
Lun 05:10 Las Vegas Harry Reid (LAS) 1 10:00 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2025-03-03
Sab 05:15 Las Vegas Harry Reid (LAS) 1 10:05 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-15 through 2025-03-01
Jue 05:25 Las Vegas Harry Reid (LAS) 1 10:15 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2024-11-28
Sab 05:35 Las Vegas Harry Reid (LAS) 1 10:25 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-11-09 through 2024-11-16
Sab 05:35 Las Vegas Harry Reid (LAS) 1 10:25 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-12-07 through 2024-12-14
Lun-Vie 05:50 Las Vegas Harry Reid (LAS) 1 10:40 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737-800 (73H) 2:50 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 05:50 Las Vegas Harry Reid (LAS) 1 10:40 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737-800 (73H) 2:50 Effective 2025-01-19 through 2025-01-24
Lun-Vie 05:50 Las Vegas Harry Reid (LAS) 1 10:40 Houston Hobby (HOU)
Southwest Airlines WN 1934 Non-stop Boeing 737-800 (73H) 2:50 Effective 2025-01-27 through 2025-02-05
prev   1 2 3 4 5 6 7   next


Todas las líneas aéreas volando desde Las Vegas Harry Reid (LAS) a Houston Hobby (HOU).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Operates only on 2024-11-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Effective 2024-11-07 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-800 (73H)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737-800 (73H)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:50, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:50, non-stop
Boeing 737-800 (73H)
prev        Page 3 / 7        next
  • Una ruta nacional saliendo desde el aeropuerto Las Vegas Harry Reid (LAS) y llegando al aeropuerto Houston Hobby (HOU).
  • El vuelo tiene una distancia de 1232 millas, o 1983 km.
  • La zona horaria del aeropuerto de salida es UTC-8 , y la zona horario del aeropuerto de llegada es UTC-6 . La hora actual en el punto de salida es (loading...), y (loading...) en el punto de llegada. Hay una diferencia de tiempo de (loading...) hora/s entre los aeropuertos.
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:50 y 3:15.