Todas las líneas aéreas volando desde Detroit (DTW) a Nashville (BNA).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Jue,Vie,Dom 18:50 Detroit (DTW) E 19:40 Nashville (BNA)
Southwest Airlines WN 371 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-01-12 through 2025-01-17
Lun,Dom 18:50 Detroit (DTW) E 19:40 Nashville (BNA)
Southwest Airlines WN 371 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 18:50 Detroit (DTW) E 19:40 Nashville (BNA)
Southwest Airlines WN 371 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-02-02 through 2025-02-07
Lun 18:50 Detroit (DTW) E 19:40 Nashville (BNA)
Southwest Airlines WN 371 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2025-02-10
Lun,Mar,Jue 18:50 Detroit (DTW) E 19:40 Nashville (BNA)
Southwest Airlines WN 371 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-02-18 through 2025-02-24
Lun 18:50 Detroit (DTW) E 19:40 Nashville (BNA)
Southwest Airlines WN 371 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2025-03-03
Dom 13:40 Detroit (DTW) E 14:10 Nashville (BNA)
Southwest Airlines WN 423 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-09-01
Dom 16:00 Detroit (DTW) E 16:30 Nashville (BNA)
Southwest Airlines WN 423 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-09-15 through 2024-09-29
Dom 16:10 Detroit (DTW) E 16:40 Nashville (BNA)
Southwest Airlines WN 423 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-09-08
Sab 17:15 Detroit (DTW) E 17:45 Nashville (BNA)
Southwest Airlines WN 423 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Valid until 2024-09-28
Lun-Mie 15:40 Detroit (DTW) E 16:20 Nashville (BNA)
Southwest Airlines WN 486 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 15:40 Detroit (DTW) E 16:20 Nashville (BNA)
Southwest Airlines WN 486 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-12-20 through 2025-01-02
Dom 15:40 Detroit (DTW) E 16:20 Nashville (BNA)
Southwest Airlines WN 486 Non-stop Boeing 737-700 (73W) 1:40 Operates only on 2025-01-05
Sab 05:55 Detroit (DTW) E 06:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-23 through 2024-11-30
Sab 05:55 Detroit (DTW) E 06:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-21 through 2025-01-04
Lun,Jue,Vie,Dom 06:00 Detroit (DTW) E 06:55 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 06:00 Detroit (DTW) E 06:55 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-02-21 through 2025-03-02
Jue 06:05 Detroit (DTW) E 06:55 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2024-11-28
Sab 06:05 Detroit (DTW) E 07:05 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-15 through 2025-03-01
Jue,Vie,Dom 06:10 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 06:10 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-11-11 through 2024-11-25
Vie,Dom 06:10 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-12-08 through 2024-12-15
Jue 06:10 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2024-12-19
Vie 06:10 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2025-01-03
Jue,Vie,Dom 06:20 Detroit (DTW) E 07:25 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-01-12 through 2025-01-17
Lun,Dom 06:20 Detroit (DTW) E 07:25 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 06:20 Detroit (DTW) E 07:25 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-02-02 through 2025-02-07
Lun 06:20 Detroit (DTW) E 07:25 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2025-02-10
Lun,Mar,Jue 06:20 Detroit (DTW) E 07:25 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-02-18 through 2025-02-24
Lun 06:20 Detroit (DTW) E 07:25 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2025-03-03
Sab 06:25 Detroit (DTW) E 07:10 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-11-09 through 2024-11-16
Sab 06:25 Detroit (DTW) E 07:10 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-12-07 through 2024-12-14
Sab 06:30 Detroit (DTW) E 07:30 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-01-11 through 2025-02-08
Lun-Vie 06:40 Detroit (DTW) E 07:35 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 06:40 Detroit (DTW) E 07:35 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-01-19 through 2025-01-24
Lun-Vie 06:40 Detroit (DTW) E 07:35 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 06:40 Detroit (DTW) E 07:35 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-02-09 through 2025-02-12
Mar,Mie 06:40 Detroit (DTW) E 07:35 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-02-19 through 2025-03-05
Lun-Mie 07:00 Detroit (DTW) E 07:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-11-04 through 2024-11-06
Mar,Mie 07:00 Detroit (DTW) E 07:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-11-12 through 2024-11-20
Mar-Vie 07:00 Detroit (DTW) E 07:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-11-29 through 2024-12-06
Lun-Jue 07:00 Detroit (DTW) E 07:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-12-09 through 2024-12-18
Mar,Mie 07:00 Detroit (DTW) E 07:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-12-24 through 2025-01-01
Lun 07:00 Detroit (DTW) E 07:50 Nashville (BNA)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-01-06
Lun,Jue,Vie 06:30 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 759 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-10-03 through 2024-10-28
Jue 06:30 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 759 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-10-31
Vie 06:30 Detroit (DTW) E 07:00 Nashville (BNA)
Southwest Airlines WN 759 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-11-01
Dom 06:35 Detroit (DTW) E 07:05 Nashville (BNA)
Southwest Airlines WN 759 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-10-06 through 2024-10-27
Mar,Mie 07:00 Detroit (DTW) E 07:35 Nashville (BNA)
Southwest Airlines WN 759 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-10-08 through 2024-10-30
Dom 19:25 Detroit (DTW) E 19:55 Nashville (BNA)
Southwest Airlines WN 888 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-09-01
1 2 3 4 ... 6 7 8   next


Todas las líneas aéreas volando desde Detroit (DTW) a Nashville (BNA).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2024-09-15 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)
Page 1 / 8        next
  • Una ruta nacional saliendo desde el aeropuerto Detroit (DTW) y llegando al aeropuerto Nashville (BNA).
  • El vuelo tiene una distancia de 457 millas, o 735 km.
  • La zona horaria del aeropuerto de salida es UTC-5 , y la zona horario del aeropuerto de llegada es UTC-6 . La hora actual en el punto de salida es (loading...), y (loading...) en el punto de llegada. Hay una diferencia de tiempo de (loading...) hora/s entre los aeropuertos.
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:30 y 2:05.