Virgin Atlantic Airways vuelos desde Minneapolis/Saint Paul (MSP) a O'Hare, Chicago (ORD).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:
Mie 13:30 Minneapolis/Saint Paul (MSP) 1 14:58 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:28 Operates only on 2024-01-17
Codeshare flight, operated by Delta Air Lines.(DL 700)
Mie,Dom 13:30 Minneapolis/Saint Paul (MSP) 1 14:58 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A220-100 (221) 1:28 Effective 2024-01-24 through 2024-01-28
Codeshare flight, operated by Delta Air Lines.(DL 700)
Sab 13:30 Minneapolis/Saint Paul (MSP) 1 14:58 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:28 Effective 2024-01-27 through 2024-02-03
Codeshare flight, operated by Delta Air Lines.(DL 700)
Lun,Jue,Vie,Dom 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A220-100 (221) 1:28 Effective 2024-01-29 through 2024-02-05
Codeshare flight, operated by Delta Air Lines.(DL 700)
Mar,Mie 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:28 Effective 2024-01-30 through 2024-01-31
Codeshare flight, operated by Delta Air Lines.(DL 700)
Lun-Vie,Dom 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A220-100 (221) 1:28 Effective 2024-02-06 through 2024-02-14
Codeshare flight, operated by Delta Air Lines.(DL 700)
Sab 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:28 Operates only on 2024-02-10
Codeshare flight, operated by Delta Air Lines.(DL 700)
Mar,Mie,Dom 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A220-100 (221) 1:28 Effective 2024-02-18 through 2024-02-28
Codeshare flight, operated by Delta Air Lines.(DL 700)
Lun,Jue-Sab 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A320 (320) 1:28 Effective 2024-02-22 through 2024-03-09
Codeshare flight, operated by Delta Air Lines.(DL 700)
Dom 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A220-300 (223) 1:28 Operates only on 2024-03-03
Codeshare flight, operated by Delta Air Lines.(DL 700)
Mar,Mie 13:40 Minneapolis/Saint Paul (MSP) 1 15:08 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A220-100 (221) 1:28 Effective 2024-03-05 through 2024-03-06
Codeshare flight, operated by Delta Air Lines.(DL 700)
Lun,Jue,Vie,Dom 13:50 Minneapolis/Saint Paul (MSP) 1 15:16 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A320 (320) 1:26 Effective 2024-01-15 through 2024-01-26
Codeshare flight, operated by Delta Air Lines.(DL 700)
Jue,Vie 13:50 Minneapolis/Saint Paul (MSP) 1 15:18 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A319 (319) 1:28 Effective 2024-02-15 through 2024-02-16
Codeshare flight, operated by Delta Air Lines.(DL 700)
Sab 13:50 Minneapolis/Saint Paul (MSP) 1 15:18 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:28 Operates only on 2024-02-17
Codeshare flight, operated by Delta Air Lines.(DL 700)
Lun 13:50 Minneapolis/Saint Paul (MSP) 1 15:18 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A320 (320) 1:28 Operates only on 2024-02-19
Codeshare flight, operated by Delta Air Lines.(DL 700)
Diario 15:30 Minneapolis/Saint Paul (MSP) 1 17:00 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A319 (319) 1:30 Effective 2024-03-10 through 2024-04-08
Codeshare flight, operated by Delta Air Lines.(DL 1506)
Lun-Vie,Dom 18:05 Minneapolis/Saint Paul (MSP) 1 19:39 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:34 Effective 2024-04-09 through 2024-06-06
Codeshare flight, operated by Delta Air Lines.(DL 1406)
Sab 19:45 Minneapolis/Saint Paul (MSP) 1 21:19 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Airbus A321 (321) 1:34 Effective 2024-05-11 through 2024-06-01
Codeshare flight, operated by Delta Air Lines.(DL 1523)
Lun,Dom 20:05 Minneapolis/Saint Paul (MSP) 1 21:54 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Embraer EMB 175 (E7W) 1:49 Valid until 2024-01-01
Codeshare flight, operated by Delta Air Lines.(DL 4085)
Sab,Dom 20:35 Minneapolis/Saint Paul (MSP) 1 22:04 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Boeing 717 (717) 1:29 Effective 2024-01-06 through 2024-01-07
Codeshare flight, operated by Delta Air Lines.(DL 2611)
Mar-Sab 20:43 Minneapolis/Saint Paul (MSP) 1 22:32 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4436 Non-stop Embraer EMB 175 (E7W) 1:49 Valid until 2024-01-05
Codeshare flight, operated by Delta Air Lines.(DL 4085)
Lun-Vie,Dom 07:00 Minneapolis/Saint Paul (MSP) 1 08:47 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:47 Effective 2024-03-10 through 2024-04-08
Codeshare flight, operated by Delta Air Lines.(DL 1686)
Diario 07:00 Minneapolis/Saint Paul (MSP) 1 08:36 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:36 Effective 2024-04-09 through 2024-06-06
Codeshare flight, operated by Delta Air Lines.(DL 1659)
Vie 07:15 Minneapolis/Saint Paul (MSP) 1 09:04 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:49 Operates only on 2024-01-19
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Mar-Vie 07:15 Minneapolis/Saint Paul (MSP) 1 09:04 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:49 Effective 2024-02-06 through 2024-02-09
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Lun-Vie 07:15 Minneapolis/Saint Paul (MSP) 1 09:04 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:49 Effective 2024-02-15 through 2024-02-23
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Lun-Vie,Dom 07:15 Minneapolis/Saint Paul (MSP) 1 09:04 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:49 Effective 2024-02-25 through 2024-03-08
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Mar-Vie 07:27 Minneapolis/Saint Paul (MSP) 1 09:22 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Canadair CRJ 900 (CR9) 1:55 Valid until 2024-01-05
Codeshare flight, operated by Delta Air Lines.(DL 5196)
Dom 07:27 Minneapolis/Saint Paul (MSP) 1 09:22 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Canadair CRJ 900 (CR9) 1:55 Operates only on 2024-01-07
Codeshare flight, operated by Delta Air Lines.(DL 5196)
Lun-Jue,Dom 07:32 Minneapolis/Saint Paul (MSP) 1 09:15 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:43 Effective 2024-01-15 through 2024-01-25
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Vie,Dom 07:32 Minneapolis/Saint Paul (MSP) 1 09:15 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:43 Effective 2024-01-26 through 2024-01-28
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Lun-Vie 08:50 Minneapolis/Saint Paul (MSP) 1 10:29 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:39 Effective 2024-01-08 through 2024-01-12
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Lun-Vie 08:50 Minneapolis/Saint Paul (MSP) 1 10:29 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:39 Effective 2024-01-29 through 2024-02-05
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Lun-Mie 09:00 Minneapolis/Saint Paul (MSP) 1 10:39 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:39 Effective 2024-02-12 through 2024-02-14
Codeshare flight, operated by Delta Air Lines.(DL 1609)
Sab 12:55 Minneapolis/Saint Paul (MSP) 1 14:40 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Embraer EMB 175 (E7W) 1:45 Operates only on 2024-01-06
Codeshare flight, operated by Delta Air Lines.(DL 3652)
Diario 15:15 Minneapolis/Saint Paul (MSP) 1 16:55 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:40 Effective 2024-06-07 through 2024-09-08
Codeshare flight, operated by Delta Air Lines.(DL 1637)
Diario 15:15 Minneapolis/Saint Paul (MSP) 1 16:45 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4474 Non-stop Boeing 717 (717) 1:30 Effective from 2024-09-09
Codeshare flight, operated by Delta Air Lines.(DL 1471)
Sab 07:27 Minneapolis/Saint Paul (MSP) 1 09:22 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4476 Non-stop Canadair CRJ 900 (CR9) 1:55 Operates only on 2024-01-06
Codeshare flight, operated by Delta Air Lines.(DL 5196)
Diario 13:23 Minneapolis/Saint Paul (MSP) 1 14:54 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4476 Non-stop Boeing 717 (717) 1:31 Effective 2024-04-09 through 2024-06-06
Codeshare flight, operated by Delta Air Lines.(DL 2653)
Diario 13:23 Minneapolis/Saint Paul (MSP) 1 14:56 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4476 Non-stop Boeing 717 (717) 1:33 Effective from 2024-06-07
Codeshare flight, operated by Delta Air Lines.(DL 2653)
Diario 20:00 Minneapolis/Saint Paul (MSP) 1 21:39 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4476 Non-stop Boeing 717 (717) 1:39 Effective 2024-01-08 through 2024-03-09
Codeshare flight, operated by Delta Air Lines.(DL 2919)
Sab 19:45 Minneapolis/Saint Paul (MSP) 1 21:19 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4484 Non-stop Airbus A321 (321) 1:34 Effective 2024-04-13 through 2024-05-04
Codeshare flight, operated by Delta Air Lines.(DL 1523)
Sab 19:45 Minneapolis/Saint Paul (MSP) 1 21:17 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4484 Non-stop Airbus A321 (321) 1:32 Effective 2024-06-22 through 2024-09-07
Codeshare flight, operated by Delta Air Lines.(DL 1200)
Diario 19:55 Minneapolis/Saint Paul (MSP) 1 21:26 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4484 Non-stop Airbus A319 (319) 1:31 Effective 2024-03-10 through 2024-04-08
Codeshare flight, operated by Delta Air Lines.(DL 2810)
Lun-Vie,Dom 20:20 Minneapolis/Saint Paul (MSP) 1 21:44 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4484 Non-stop Airbus A321 (321) 1:24 Effective 2024-04-09 through 2024-06-06
Codeshare flight, operated by Delta Air Lines.(DL 2810)
Lun-Vie,Dom 20:20 Minneapolis/Saint Paul (MSP) 1 21:52 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4484 Non-stop Airbus A321 (321) 1:32 Effective 2024-06-07 through 2024-09-08
Codeshare flight, operated by Delta Air Lines.(DL 2810)
Diario 20:20 Minneapolis/Saint Paul (MSP) 1 21:47 O'Hare, Chicago (ORD) 5
Virgin Atlantic Airways VS 4484 Non-stop Boeing 717 (717) 1:27 Effective from 2024-09-09
Codeshare flight, operated by Delta Air Lines.(DL 1563)
prev   1 2


Virgin Atlantic Airways vuelos desde Minneapolis/Saint Paul (MSP) a O'Hare, Chicago (ORD).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:

Operates only on 2024-01-17
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Boeing 717 (717)

Effective 2024-01-24 through 2024-01-28
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A220-100 (221)

Effective 2024-01-27 through 2024-02-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Boeing 717 (717)

Effective 2024-01-29 through 2024-02-05
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A220-100 (221)

Effective 2024-01-30 through 2024-01-31
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Boeing 717 (717)

Effective 2024-02-06 through 2024-02-14
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A220-100 (221)

Operates only on 2024-02-10
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Boeing 717 (717)

Effective 2024-02-18 through 2024-02-28
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A220-100 (221)

Effective 2024-02-22 through 2024-03-09
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A320 (320)

Operates only on 2024-03-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A220-300 (223)

Effective 2024-03-05 through 2024-03-06
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A220-100 (221)

Effective 2024-01-15 through 2024-01-26
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:26, non-stop
Airbus A320 (320)

Effective 2024-02-15 through 2024-02-16
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A319 (319)

Operates only on 2024-02-17
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Boeing 717 (717)

Operates only on 2024-02-19
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 700)
Duration: 1:28, non-stop
Airbus A320 (320)

Effective 2024-03-10 through 2024-04-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1506)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-04-09 through 2024-06-06
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1406)
Duration: 1:34, non-stop
Boeing 717 (717)

Effective 2024-05-11 through 2024-06-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1523)
Duration: 1:34, non-stop
Airbus A321 (321)

Valid until 2024-01-01
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 4085)
Duration: 1:49, non-stop
Embraer EMB 175 (E7W)

Effective 2024-01-06 through 2024-01-07
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2611)
Duration: 1:29, non-stop
Boeing 717 (717)

Valid until 2024-01-05
Lun
-
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 4085)
Duration: 1:49, non-stop
Embraer EMB 175 (E7W)

Effective 2024-03-10 through 2024-04-08
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1686)
Duration: 1:47, non-stop
Boeing 717 (717)

Effective 2024-04-09 through 2024-06-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1659)
Duration: 1:36, non-stop
Boeing 717 (717)

Operates only on 2024-01-19
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:49, non-stop
Boeing 717 (717)

Effective 2024-02-06 through 2024-02-09
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:49, non-stop
Boeing 717 (717)

Effective 2024-02-15 through 2024-02-23
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:49, non-stop
Boeing 717 (717)

Effective 2024-02-25 through 2024-03-08
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:49, non-stop
Boeing 717 (717)

Valid until 2024-01-05
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 5196)
Duration: 1:55, non-stop
Canadair CRJ 900 (CR9)

Operates only on 2024-01-07
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 5196)
Duration: 1:55, non-stop
Canadair CRJ 900 (CR9)

Effective 2024-01-15 through 2024-01-25
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:43, non-stop
Boeing 717 (717)

Effective 2024-01-26 through 2024-01-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:43, non-stop
Boeing 717 (717)

Effective 2024-01-08 through 2024-01-12
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:39, non-stop
Boeing 717 (717)

Effective 2024-01-29 through 2024-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:39, non-stop
Boeing 717 (717)

Effective 2024-02-12 through 2024-02-14
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1609)
Duration: 1:39, non-stop
Boeing 717 (717)

Operates only on 2024-01-06
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 3652)
Duration: 1:45, non-stop
Embraer EMB 175 (E7W)

Effective 2024-06-07 through 2024-09-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1637)
Duration: 1:40, non-stop
Boeing 717 (717)

Effective from 2024-09-09
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1471)
Duration: 1:30, non-stop
Boeing 717 (717)

Operates only on 2024-01-06
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 5196)
Duration: 1:55, non-stop
Canadair CRJ 900 (CR9)

Effective 2024-04-09 through 2024-06-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2653)
Duration: 1:31, non-stop
Boeing 717 (717)

Effective from 2024-06-07
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2653)
Duration: 1:33, non-stop
Boeing 717 (717)

Effective 2024-01-08 through 2024-03-09
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2919)
Duration: 1:39, non-stop
Boeing 717 (717)

Effective 2024-04-13 through 2024-05-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1523)
Duration: 1:34, non-stop
Airbus A321 (321)

Effective 2024-06-22 through 2024-09-07
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Delta Air Lines. (DL 1200)
Duration: 1:32, non-stop
Airbus A321 (321)

Effective 2024-03-10 through 2024-04-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2810)
Duration: 1:31, non-stop
Airbus A319 (319)

Effective 2024-04-09 through 2024-06-06
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2810)
Duration: 1:24, non-stop
Airbus A321 (321)

Effective 2024-06-07 through 2024-09-08
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Delta Air Lines. (DL 2810)
Duration: 1:32, non-stop
Airbus A321 (321)

Effective from 2024-09-09
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Delta Air Lines. (DL 1563)
Duration: 1:27, non-stop
Boeing 717 (717)
prev        Page 2 / 2
  • Una ruta nacional saliendo desde el aeropuerto Minneapolis/Saint Paul (MSP) y llegando al aeropuerto O'Hare, Chicago (ORD).
  • El vuelo tiene una distancia de 333 millas, o 537 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC-6 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 1:24 y 1:55.