Southwest Airlines vuelo WN 478: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Jue 06:05 Austin (AUS) 08:35 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2024-11-28
Dom 06:15 Austin (AUS) 08:45 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-12-01
Sab 06:35 Austin (AUS) 09:05 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-700 (73W) 2:30 Effective 2025-02-15 through 2025-03-01
Lun-Vie 06:40 Austin (AUS) 09:10 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 06:40 Austin (AUS) 09:10 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-19 through 2025-01-24
Lun-Vie 06:40 Austin (AUS) 09:10 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 06:40 Austin (AUS) 09:10 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-09 through 2025-02-12
Mar,Mie 06:40 Austin (AUS) 09:10 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-19 through 2025-03-05
Jue,Vie,Dom 06:45 Austin (AUS) 09:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 06:45 Austin (AUS) 09:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-11 through 2024-11-25
Vie,Dom 06:45 Austin (AUS) 09:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-12-08 through 2024-12-15
Jue 06:45 Austin (AUS) 09:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-12-19
Vie 06:45 Austin (AUS) 09:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2025-01-03
Lun-Mie 07:45 Austin (AUS) 10:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-04 through 2024-11-06
Mar,Mie 07:45 Austin (AUS) 10:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-12 through 2024-11-20
Mar-Vie 07:45 Austin (AUS) 10:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-29 through 2024-12-06
Lun-Jue 07:45 Austin (AUS) 10:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-12-09 through 2024-12-18
Mar,Mie 07:45 Austin (AUS) 10:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-12-24 through 2025-01-01
Lun 07:45 Austin (AUS) 10:15 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2025-01-06
Sab 07:50 Austin (AUS) 10:20 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-09 through 2024-11-16
Sab 07:50 Austin (AUS) 10:20 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-12-07 through 2024-12-14
Lun,Jue,Vie,Dom 08:30 Austin (AUS) 11:00 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 08:30 Austin (AUS) 11:00 Midway, Chicago (MDW)
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-21 through 2025-03-02
Sab 09:40 Midway, Chicago (MDW) 10:55 Saint Louis (STL) 2
WN 478 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-02-15 through 2025-03-01
Jue 10:45 Saint Louis (STL) 2 12:50 Austin (AUS)
WN 478 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2024-10-31
Sab 12:05 Oakland (OAK) 2 13:35 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-11-23 through 2024-11-30
Sab 12:05 Oakland (OAK) 2 13:35 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-12-21 through 2025-01-04
Lun,Jue,Vie 14:55 Baltimore (BWI) 17:40 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737-700 (73W) 2:45 Valid until 2024-09-13
Lun,Jue,Vie 14:55 Baltimore (BWI) 17:40 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-09-23 through 2024-09-30
Lun,Jue,Vie 15:00 Baltimore (BWI) 17:45 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-09-16 through 2024-09-20
Mar,Mie 16:15 Baltimore (BWI) 19:00 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737-700 (73W) 2:45 Valid until 2024-10-02
Sab 16:25 Baltimore (BWI) 19:10 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Valid until 2024-09-28
Lun-Mie 17:00 Little Rock (LIT) 18:10 Love Field, Dallas (DAL) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 17:00 Little Rock (LIT) 18:10 Love Field, Dallas (DAL) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-20 through 2025-01-02
Dom 17:00 Little Rock (LIT) 18:10 Love Field, Dallas (DAL) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2025-01-05
Jue,Vie,Dom 17:00 Sacramento (SMF) B 18:30 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-01-12 through 2025-01-17
Lun,Dom 17:00 Sacramento (SMF) B 18:30 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 17:00 Sacramento (SMF) B 18:30 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-02-02 through 2025-02-07
Lun 17:00 Sacramento (SMF) B 18:30 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2025-02-10
Lun,Mar,Jue 17:00 Sacramento (SMF) B 18:30 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-02-18 through 2025-02-24
Lun 17:00 Sacramento (SMF) B 18:30 San Diego (SAN) 1
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2025-03-03
Dom 17:25 Baltimore (BWI) 20:05 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2024-09-01
Lun-Mie 18:50 Love Field, Dallas (DAL) 1 20:30 Phoenix Sky Harbor (PHX) 4
WN 478 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 18:50 Love Field, Dallas (DAL) 1 20:30 Phoenix Sky Harbor (PHX) 4
WN 478 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-12-20 through 2025-01-02
Dom 18:50 Love Field, Dallas (DAL) 1 20:30 Phoenix Sky Harbor (PHX) 4
WN 478 Non-stop Boeing 737-700 (73W) 2:40 Operates only on 2025-01-05
Jue,Vie,Dom 19:05 San Diego (SAN) 1 23:40 San Antonio (SAT) A
WN 478 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-01-12 through 2025-01-17
Lun,Dom 19:05 San Diego (SAN) 1 23:40 San Antonio (SAT) A
WN 478 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 19:05 San Diego (SAN) 1 23:40 San Antonio (SAT) A
WN 478 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-02 through 2025-02-07
Lun 19:05 San Diego (SAN) 1 23:40 San Antonio (SAT) A
WN 478 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-02-10
Lun,Mar,Jue 19:05 San Diego (SAN) 1 23:40 San Antonio (SAT) A
WN 478 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-18 through 2025-02-24
Lun 19:05 San Diego (SAN) 1 23:40 San Antonio (SAT) A
WN 478 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-03-03
Dom 19:30 Baltimore (BWI) 22:10 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-09-08 through 2024-09-22
Dom 19:30 Baltimore (BWI) 22:10 Fort Lauderdale (FLL) 1
WN 478 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2024-09-29
Lun,Jue,Vie 20:35 Phoenix Sky Harbor (PHX) 4 22:25 San Jose (SJC) B
WN 478 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-10-03 through 2024-10-28
Vie 20:35 Phoenix Sky Harbor (PHX) 4 22:25 San Jose (SJC) B
WN 478 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2024-11-01
Dom 21:40 Baltimore (BWI) 23:10 Charlotte (CLT)
WN 478 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-10-06 through 2024-10-27
Vuelos no directos:
Sab 06:35 Austin (AUS) 10:55 Saint Louis (STL) 2
WN 478 1-stop Boeing 737-700 (73W) 4:20 Effective 2025-02-15 through 2025-03-01
Lun-Mie 17:00 Little Rock (LIT) 20:30 Phoenix Sky Harbor (PHX) 4
WN 478 1-stop Boeing 737-700 (73W) 4:30 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 17:00 Little Rock (LIT) 20:30 Phoenix Sky Harbor (PHX) 4
WN 478 1-stop Boeing 737-700 (73W) 4:30 Effective 2024-12-20 through 2025-01-02
Dom 17:00 Little Rock (LIT) 20:30 Phoenix Sky Harbor (PHX) 4
WN 478 1-stop Boeing 737-700 (73W) 4:30 Operates only on 2025-01-05
Jue,Vie,Dom 17:00 Sacramento (SMF) B 23:40 San Antonio (SAT) A
WN 478 1-stop Boeing 737-700 (73W) 4:40 Effective 2025-01-12 through 2025-01-17
Lun,Dom 17:00 Sacramento (SMF) B 23:40 San Antonio (SAT) A
WN 478 1-stop Boeing 737-700 (73W) 4:40 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 17:00 Sacramento (SMF) B 23:40 San Antonio (SAT) A
WN 478 1-stop Boeing 737-700 (73W) 4:40 Effective 2025-02-02 through 2025-02-07
Lun 17:00 Sacramento (SMF) B 23:40 San Antonio (SAT) A
WN 478 1-stop Boeing 737-700 (73W) 4:40 Operates only on 2025-02-10
Lun,Mar,Jue 17:00 Sacramento (SMF) B 23:40 San Antonio (SAT) A
WN 478 1-stop Boeing 737-700 (73W) 4:40 Effective 2025-02-18 through 2025-02-24
Lun 17:00 Sacramento (SMF) B 23:40 San Antonio (SAT) A
WN 478 1-stop Boeing 737-700 (73W) 4:40 Operates only on 2025-03-03
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 478: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN478
Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
12:05

13:35
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
12:05

13:35
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN478
Valid until 2024-09-13
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-09-23 through 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-09-16 through 2024-09-20
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-09-08 through 2024-09-22
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN478
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Vuelos no directos:

Southwest Airlines WN478
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN478
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 4:40, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Austin (AUS) - Midway, Chicago (MDW)
  • Austin (AUS) - Saint Louis (STL)
  • Baltimore (BWI) - Charlotte (CLT)
  • Baltimore (BWI) - Fort Lauderdale (FLL)
  • Little Rock (LIT) - Love Field, Dallas (DAL)
  • Little Rock (LIT) - Phoenix Sky Harbor (PHX)
  • Love Field, Dallas (DAL) - Phoenix Sky Harbor (PHX)
  • Midway, Chicago (MDW) - Saint Louis (STL)
  • Oakland (OAK) - San Diego (SAN)
  • Phoenix Sky Harbor (PHX) - San Jose (SJC)
  • Sacramento (SMF) - San Antonio (SAT)
  • Sacramento (SMF) - San Diego (SAN)
  • San Diego (SAN) - San Antonio (SAT)