Southwest Airlines vuelo WN 367: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Dom 05:30 Saint Louis (STL) 2 06:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-12-01
Jue,Vie,Dom 05:40 Saint Louis (STL) 2 06:50 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 05:40 Saint Louis (STL) 2 06:50 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-11 through 2024-11-25
Vie,Dom 05:40 Saint Louis (STL) 2 06:50 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-08 through 2024-12-15
Jue 05:40 Saint Louis (STL) 2 06:50 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-12-19
Vie 05:40 Saint Louis (STL) 2 06:50 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2025-01-03
Jue 05:45 Saint Louis (STL) 2 06:55 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-11-28
Lun,Jue,Vie,Dom 06:00 Saint Louis (STL) 2 07:10 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 06:00 Saint Louis (STL) 2 07:10 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-02-21 through 2025-03-02
Jue,Vie,Dom 06:25 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-01-12 through 2025-01-17
Lun,Dom 06:25 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 06:25 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-02-02 through 2025-02-07
Lun 06:25 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Operates only on 2025-02-10
Lun,Mar,Jue 06:25 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Effective 2025-02-18 through 2025-02-24
Lun 06:25 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Operates only on 2025-03-03
Lun-Mie 06:30 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-11-04 through 2024-11-06
Mar,Mie 06:30 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-11-12 through 2024-11-20
Mar-Vie 06:30 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-11-29 through 2024-12-06
Lun-Jue 06:30 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-12-09 through 2024-12-18
Mar,Mie 06:30 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-12-24 through 2025-01-01
Lun 06:30 Saint Louis (STL) 2 07:40 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2025-01-06
Sab 06:45 Saint Louis (STL) 2 08:00 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:15 Effective 2025-01-11 through 2025-02-08
Lun,Jue,Vie 07:05 Love Field, Dallas (DAL) 1 10:30 Tampa (TPA)
WN 367 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-09-30
Mar,Mie 07:05 Love Field, Dallas (DAL) 1 10:30 Tampa (TPA)
WN 367 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-10-02
Sab 07:05 Saint Louis (STL) 2 08:15 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-02-15 through 2025-03-01
Dom 07:20 Love Field, Dallas (DAL) 1 10:45 Tampa (TPA)
WN 367 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-08 through 2024-09-29
Dom 07:35 Midway, Chicago (MDW) 09:40 Albuquerque (ABQ)
WN 367 Non-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-12-01
Lun-Vie 07:50 Saint Louis (STL) 2 09:00 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 07:50 Saint Louis (STL) 2 09:00 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-01-19 through 2025-01-24
Lun-Vie 07:50 Saint Louis (STL) 2 09:00 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 07:50 Saint Louis (STL) 2 09:00 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-02-09 through 2025-02-12
Mar,Mie 07:50 Saint Louis (STL) 2 09:00 Midway, Chicago (MDW)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-02-19 through 2025-03-05
Jue 08:30 Sacramento (SMF) B 10:00 Las Vegas Harry Reid (LAS) 1
WN 367 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-10-31
Dom 09:15 Love Field, Dallas (DAL) 1 12:40 Tampa (TPA)
WN 367 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-09-01
Dom 10:15 Albuquerque (ABQ) 11:35 Denver (DEN)
WN 367 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-12-01
Lun-Mie 11:05 John Glenn Columbus (CMH) 13:30 Sarasota/Bradenton (SRQ)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 11:05 John Glenn Columbus (CMH) 13:30 Sarasota/Bradenton (SRQ)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-20 through 2025-01-02
Dom 11:05 John Glenn Columbus (CMH) 13:30 Sarasota/Bradenton (SRQ)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-05
Sab 11:20 Denver (DEN) 16:50 Baltimore (BWI)
WN 367 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Valid until 2024-09-28
Sab 11:30 John Glenn Columbus (CMH) 13:55 Sarasota/Bradenton (SRQ)
WN 367 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-11-23 through 2024-11-30
Sab 11:30 John Glenn Columbus (CMH) 13:55 Sarasota/Bradenton (SRQ)
WN 367 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-12-21 through 2025-01-04
Dom 12:15 Las Vegas Harry Reid (LAS) 1 14:50 Portland (PDX)
WN 367 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-10-06 through 2024-10-27
Dom 12:15 Denver (DEN) 13:45 Burbank (BUR)
WN 367 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2024-12-01
Mar,Mie 12:55 Boise (BOI) 14:40 Denver (DEN)
WN 367 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-08 through 2024-10-30
Lun,Jue,Vie 13:35 San Jose (SJC) B 15:00 Santa Ana (SNA)
WN 367 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-03 through 2024-10-28
Vie 13:35 San Jose (SJC) B 15:00 Santa Ana (SNA)
WN 367 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-11-01
Dom 14:25 Burbank (BUR) 15:35 Las Vegas Harry Reid (LAS) 1
WN 367 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-12-01
Mar,Mie 15:20 Denver (DEN) 18:15 Love Field, Dallas (DAL) 1
WN 367 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-08 through 2024-10-30
Vuelos no directos:
Dom 05:30 Saint Louis (STL) 2 09:40 Albuquerque (ABQ)
WN 367 1-stop Boeing 737-700 (73W) 5:10 Operates only on 2024-12-01
Dom 07:35 Midway, Chicago (MDW) 11:35 Denver (DEN)
WN 367 1-stop Boeing 737-700 (73W) 5:00 Operates only on 2024-12-01
Dom 10:15 Albuquerque (ABQ) 13:45 Burbank (BUR)
WN 367 1-stop Boeing 737-700 (73W) 4:30 Operates only on 2024-12-01
Dom 12:15 Denver (DEN) 15:35 Las Vegas Harry Reid (LAS) 1
WN 367 1-stop Boeing 737-700 (73W) 4:20 Operates only on 2024-12-01
Mar,Mie 12:55 Boise (BOI) 18:15 Love Field, Dallas (DAL) 1
WN 367 1-stop Boeing 737-700 (73W) 4:20 Effective 2024-10-08 through 2024-10-30
Dom 05:30 Saint Louis (STL) 2 11:35 Denver (DEN)
WN 367 2-stop Boeing 737-700 (73W) 7:05 Operates only on 2024-12-01
Dom 07:35 Midway, Chicago (MDW) 13:45 Burbank (BUR)
WN 367 2-stop Boeing 737-700 (73W) 8:10 Operates only on 2024-12-01
Dom 10:15 Albuquerque (ABQ) 15:35 Las Vegas Harry Reid (LAS) 1
WN 367 2-stop Boeing 737-700 (73W) 6:20 Operates only on 2024-12-01
Dom 05:30 Saint Louis (STL) 2 13:45 Burbank (BUR)
WN 367 3-stop Boeing 737-700 (73W) 10:15 Operates only on 2024-12-01
Dom 07:35 Midway, Chicago (MDW) 15:35 Las Vegas Harry Reid (LAS) 1
WN 367 3-stop Boeing 737-700 (73W) 10:00 Operates only on 2024-12-01
Dom 05:30 Saint Louis (STL) 2 15:35 Las Vegas Harry Reid (LAS) 1
WN 367 4-stop Boeing 737-700 (73W) 12:05 Operates only on 2024-12-01
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 367: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN367
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN367
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Vuelos no directos:

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 5:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 7:05, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 8:10, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 10:15, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 10:00, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN367
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 12:05, 4-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Albuquerque (ABQ) - Burbank (BUR)
  • Albuquerque (ABQ) - Denver (DEN)
  • Albuquerque (ABQ) - Las Vegas Harry Reid (LAS)
  • Boise (BOI) - Denver (DEN)
  • Boise (BOI) - Love Field, Dallas (DAL)
  • Burbank (BUR) - Las Vegas Harry Reid (LAS)
  • Denver (DEN) - Baltimore (BWI)
  • Denver (DEN) - Burbank (BUR)
  • Denver (DEN) - Las Vegas Harry Reid (LAS)
  • Denver (DEN) - Love Field, Dallas (DAL)
  • John Glenn Columbus (CMH) - Sarasota/Bradenton (SRQ)
  • Las Vegas Harry Reid (LAS) - Portland (PDX)
  • Love Field, Dallas (DAL) - Tampa (TPA)
  • Midway, Chicago (MDW) - Albuquerque (ABQ)
  • Midway, Chicago (MDW) - Burbank (BUR)
  • Midway, Chicago (MDW) - Denver (DEN)
  • Midway, Chicago (MDW) - Las Vegas Harry Reid (LAS)
  • Sacramento (SMF) - Las Vegas Harry Reid (LAS)
  • Saint Louis (STL) - Albuquerque (ABQ)
  • Saint Louis (STL) - Burbank (BUR)
  • Saint Louis (STL) - Denver (DEN)
  • Saint Louis (STL) - Las Vegas Harry Reid (LAS)
  • Saint Louis (STL) - Midway, Chicago (MDW)
  • San Jose (SJC) - Santa Ana (SNA)