Southwest Airlines vuelo WN 2733: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun-Mie 07:40 Las Vegas Harry Reid (LAS) 1 08:50 Long Beach (LGB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-04 through 2024-11-06
Mar,Mie 07:40 Las Vegas Harry Reid (LAS) 1 08:50 Long Beach (LGB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-12 through 2024-11-20
Mar-Vie 07:40 Las Vegas Harry Reid (LAS) 1 08:50 Long Beach (LGB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-29 through 2024-12-06
Lun-Jue 07:40 Las Vegas Harry Reid (LAS) 1 08:50 Long Beach (LGB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-09 through 2024-12-18
Mar,Mie 07:40 Las Vegas Harry Reid (LAS) 1 08:50 Long Beach (LGB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-24 through 2025-01-01
Lun 07:40 Las Vegas Harry Reid (LAS) 1 08:50 Long Beach (LGB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2025-01-06
Lun,Jue,Vie,Dom 09:05 Long Beach (LGB) 10:35 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 09:05 Long Beach (LGB) 10:35 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-02-21 through 2025-03-02
Lun-Mie 09:25 Long Beach (LGB) 10:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mie 09:25 Long Beach (LGB) 10:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-12 through 2024-11-20
Mar-Vie 09:25 Long Beach (LGB) 10:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jue 09:25 Long Beach (LGB) 10:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-09 through 2024-12-18
Mar,Mie 09:25 Long Beach (LGB) 10:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-24 through 2025-01-01
Lun 09:25 Long Beach (LGB) 10:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-01-06
Jue,Vie,Dom 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-11 through 2024-11-25
Sab 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-23 through 2024-11-30
Vie,Dom 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-08 through 2024-12-15
Jue 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-12-19
Sab 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-21 through 2025-01-04
Vie 09:35 Long Beach (LGB) 11:00 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-01-03
Jue,Vie,Dom 10:30 Long Beach (LGB) 11:55 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-12 through 2025-01-17
Lun,Dom 10:30 Long Beach (LGB) 11:55 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 10:30 Long Beach (LGB) 11:55 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-02 through 2025-02-07
Lun 10:30 Long Beach (LGB) 11:55 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-02-10
Lun,Mar,Jue 10:30 Long Beach (LGB) 11:55 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 10:30 Long Beach (LGB) 11:55 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-03-03
Sab 10:35 Orlando (MCO) 13:15 Albany (ALB)
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2024-10-19
Sab 10:40 Orlando (MCO) 13:20 Albany (ALB)
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-10-05 through 2024-10-12
Sab 10:40 Orlando (MCO) 13:20 Albany (ALB)
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-10-26 through 2024-11-02
Mar,Mie 11:20 Tampa (TPA) 13:40 Baltimore (BWI)
WN 2733 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Valid until 2024-10-02
Lun-Vie 11:20 Long Beach (LGB) 12:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 11:20 Long Beach (LGB) 12:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-01-19 through 2025-01-24
Lun-Vie 11:20 Long Beach (LGB) 12:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 11:20 Long Beach (LGB) 12:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-02-09 through 2025-02-12
Mar,Mie 11:20 Long Beach (LGB) 12:50 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-02-19 through 2025-03-05
Jue,Vie,Dom 11:35 Sacramento (SMF) B 14:55 Denver (DEN)
WN 2733 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 11:35 Sacramento (SMF) B 14:55 Denver (DEN)
WN 2733 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-11 through 2024-11-25
Vie,Dom 11:35 Sacramento (SMF) B 14:55 Denver (DEN)
WN 2733 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-12-08 through 2024-12-15
Jue 11:35 Sacramento (SMF) B 14:55 Denver (DEN)
WN 2733 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-12-19
Vie 11:35 Sacramento (SMF) B 14:55 Denver (DEN)
WN 2733 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-01-03
Lun-Mie 12:10 Long Beach (LGB) 13:35 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 12:10 Long Beach (LGB) 13:35 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-20 through 2025-01-02
Dom 12:10 Long Beach (LGB) 13:35 Sacramento (SMF) B
WN 2733 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-01-05
Jue 12:15 Midway, Chicago (MDW) 15:05 Albany (ALB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2024-10-31
Lun,Jue,Vie 13:35 Midway, Chicago (MDW) 16:25 Albany (ALB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-10-03 through 2024-10-28
Vie 13:35 Midway, Chicago (MDW) 16:25 Albany (ALB)
WN 2733 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2024-11-01
Dom 14:35 Oakland (OAK) 2 16:05 San Diego (SAN) 1
WN 2733 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-09-08 through 2024-09-29
Jue 16:00 Albany (ALB) 17:20 Baltimore (BWI)
WN 2733 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-10-31
Sab 16:05 Tampa (TPA) 18:25 Baltimore (BWI)
WN 2733 Non-stop Boeing 737-700 (73W) 2:20 Valid until 2024-09-28
Lun,Jue,Vie 16:45 San Diego (SAN) 1 18:10 Phoenix Sky Harbor (PHX) 4
WN 2733 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2024-09-30
Lun,Jue,Vie 18:45 Phoenix Sky Harbor (PHX) 4 23:15 Kansas City (MCI)
WN 2733 Non-stop Boeing 737-700 (73W) 2:30 Valid until 2024-09-30
Sab 19:05 Baltimore (BWI) 20:55 Phoenix Sky Harbor (PHX) 4
WN 2733 Non-stop Boeing 737-700 (73W) 4:50 Valid until 2024-09-28
Vuelos no directos:
Lun-Mie 07:40 Las Vegas Harry Reid (LAS) 1 10:50 Sacramento (SMF) B
WN 2733 1-stop Boeing 737-700 (73W) 3:10 Effective 2024-11-04 through 2024-11-06
Mar,Mie 07:40 Las Vegas Harry Reid (LAS) 1 10:50 Sacramento (SMF) B
WN 2733 1-stop Boeing 737-700 (73W) 3:10 Effective 2024-11-12 through 2024-11-20
Mar-Vie 07:40 Las Vegas Harry Reid (LAS) 1 10:50 Sacramento (SMF) B
WN 2733 1-stop Boeing 737-700 (73W) 3:10 Effective 2024-11-29 through 2024-12-06
Lun-Jue 07:40 Las Vegas Harry Reid (LAS) 1 10:50 Sacramento (SMF) B
WN 2733 1-stop Boeing 737-700 (73W) 3:10 Effective 2024-12-09 through 2024-12-18
Mar,Mie 07:40 Las Vegas Harry Reid (LAS) 1 10:50 Sacramento (SMF) B
WN 2733 1-stop Boeing 737-700 (73W) 3:10 Effective 2024-12-24 through 2025-01-01
Lun 07:40 Las Vegas Harry Reid (LAS) 1 10:50 Sacramento (SMF) B
WN 2733 1-stop Boeing 737-700 (73W) 3:10 Operates only on 2025-01-06
Jue,Vie,Dom 09:35 Long Beach (LGB) 14:55 Denver (DEN)
WN 2733 1-stop Boeing 737-700 (73W) 4:20 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 09:35 Long Beach (LGB) 14:55 Denver (DEN)
WN 2733 1-stop Boeing 737-700 (73W) 4:20 Effective 2024-11-11 through 2024-11-25
Vie,Dom 09:35 Long Beach (LGB) 14:55 Denver (DEN)
WN 2733 1-stop Boeing 737-700 (73W) 4:20 Effective 2024-12-08 through 2024-12-15
Jue 09:35 Long Beach (LGB) 14:55 Denver (DEN)
WN 2733 1-stop Boeing 737-700 (73W) 4:20 Operates only on 2024-12-19
Vie 09:35 Long Beach (LGB) 14:55 Denver (DEN)
WN 2733 1-stop Boeing 737-700 (73W) 4:20 Operates only on 2025-01-03
Jue 12:15 Midway, Chicago (MDW) 17:20 Baltimore (BWI)
WN 2733 1-stop Boeing 737-700 (73W) 4:05 Operates only on 2024-10-31
Sab 16:05 Tampa (TPA) 20:55 Phoenix Sky Harbor (PHX) 4
WN 2733 1-stop Boeing 737-700 (73W) 7:50 Valid until 2024-09-28
Lun,Jue,Vie 16:45 San Diego (SAN) 1 23:15 Kansas City (MCI)
WN 2733 1-stop Boeing 737-700 (73W) 4:30 Valid until 2024-09-30
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 2733: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN2733
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2733
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2733
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Operates only on 2024-10-19
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2024-10-05 through 2024-10-12
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2024-10-26 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2733
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2733
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2733
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2733
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
14:35

16:05
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2733
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 4:50, non-stop
Boeing 737-700 (73W)

Vuelos no directos:

Southwest Airlines WN2733
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 7:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2733
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 4:30, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Albany (ALB) - Baltimore (BWI)
  • Baltimore (BWI) - Phoenix Sky Harbor (PHX)
  • Las Vegas Harry Reid (LAS) - Long Beach (LGB)
  • Las Vegas Harry Reid (LAS) - Sacramento (SMF)
  • Long Beach (LGB) - Denver (DEN)
  • Long Beach (LGB) - Sacramento (SMF)
  • Midway, Chicago (MDW) - Albany (ALB)
  • Midway, Chicago (MDW) - Baltimore (BWI)
  • Oakland (OAK) - San Diego (SAN)
  • Orlando (MCO) - Albany (ALB)
  • Phoenix Sky Harbor (PHX) - Kansas City (MCI)
  • Sacramento (SMF) - Denver (DEN)
  • San Diego (SAN) - Kansas City (MCI)
  • San Diego (SAN) - Phoenix Sky Harbor (PHX)
  • Tampa (TPA) - Baltimore (BWI)
  • Tampa (TPA) - Phoenix Sky Harbor (PHX)