HORARIO DE VUELOS |
---|
Vuelos directos de código compartido: |
Lun,Mar
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Valid until 2024-01-01 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Mar,Mie,Vie,Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-01-02 through 2024-01-09 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun-Vie,Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-01-11 through 2024-01-17 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Sab
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-01-13 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Mar-Vie
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-01-19 through 2024-01-25 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Vie
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-01-26 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun,Mie-Vie,Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-01-29 through 2024-02-05 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Sab
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-02-03 through 2024-02-10 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun-Jue,Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-02-06 through 2024-02-14 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun,Mar,Jue,Vie
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-02-16 through 2024-02-27 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Sab
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-02-24 through 2024-03-23 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Mar,Mie,Vie
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-03-01 through 2024-03-06 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Mie-Vie,Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-03-10 through 2024-03-17 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun-Vie,Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-03-18 through 2024-03-26 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Mie,Jue,Sab
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-03-27 through 2024-03-30 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Dom
07:45
Ministro Pistarini, Buenos Aires (EZE) B
11:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Operates only on 2024-03-31 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun,Mar,Vie-Dom
09:40
Jorge Newbery, Buenos Aires (AEP)
13:20
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-04-08 through 2024-04-28 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Mie,Jue
09:40
Ministro Pistarini, Buenos Aires (EZE) B
13:20
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-04-10 through 2024-04-25 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Lun,Mar,Jue-Dom
09:45
Jorge Newbery, Buenos Aires (AEP)
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-04-01 through 2024-04-07 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Mie
09:45
Ministro Pistarini, Buenos Aires (EZE) B
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Operates only on 2024-04-03 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Mar,Mie,Vie
09:45
Jorge Newbery, Buenos Aires (AEP)
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-10-01 through 2024-10-16 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Jue
09:45
Jorge Newbery, Buenos Aires (AEP)
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-10-03 through 2024-10-10 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Lun,Sab
09:45
Ministro Pistarini, Buenos Aires (EZE) B
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-10-05 through 2024-10-07 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Sab,Dom
09:45
Ministro Pistarini, Buenos Aires (EZE) B
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-10-06 through 2024-10-13 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Lun,Sab
09:45
Ministro Pistarini, Buenos Aires (EZE) B
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective from 2024-10-14 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Mar-Vie
09:45
Jorge Newbery, Buenos Aires (AEP)
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective 2024-10-17 through 2024-10-23 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Dom
09:45
Ministro Pistarini, Buenos Aires (EZE) B
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective from 2024-10-20 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Jue
09:45
Jorge Newbery, Buenos Aires (AEP)
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective from 2024-10-24 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Mar,Mie,Vie
09:45
Jorge Newbery, Buenos Aires (AEP)
13:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Effective from 2024-10-25 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Sab
11:45
Ministro Pistarini, Buenos Aires (EZE) B
15:25
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-02-17 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |
Lun
13:35
Ministro Pistarini, Buenos Aires (EZE) B
17:15
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-07-01 through 2024-09-30 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Mie
13:35
Jorge Newbery, Buenos Aires (AEP)
17:15
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-07-03 through 2024-09-25 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Sab
14:20
Jorge Newbery, Buenos Aires (AEP)
18:00
Ushuaia (USH) G3 3216 Non-stop Boeing 737-800 (738) 3:40 Effective 2024-07-06 through 2024-09-28 Codeshare flight, operated by Aerolineas Argentinas.(AR 1882) |
Lun
17:55
Jorge Newbery, Buenos Aires (AEP)
21:35
Ushuaia (USH) G3 3216 Non-stop Boeing 737 MAX 8 (7M8) 3:40 Operates only on 2024-01-08 Codeshare flight, operated by Aerolineas Argentinas.(AR 1894) |