American Airlines vuelo AA 3829: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Diario 14:40 Dallas/Ft. Worth (DFW) 16:16 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective from 2024-10-27
Sab 15:20 Dallas/Ft. Worth (DFW) 17:00 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:40 Operates only on 2024-03-02
Lun,Mar,Jue-Dom 15:29 Dallas/Ft. Worth (DFW) 17:09 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:40 Effective 2024-02-15 through 2024-03-01
Lun,Mar,Jue-Dom 15:29 Dallas/Ft. Worth (DFW) 17:09 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:40 Effective 2024-03-03 through 2024-03-09
Lun,Mar,Jue-Dom 15:29 Dallas/Ft. Worth (DFW) 17:05 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective 2024-03-10 through 2024-04-02
Diario 15:49 Dallas/Ft. Worth (DFW) 17:29 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:40 Valid until 2024-01-07
Mie 15:58 Dallas/Ft. Worth (DFW) 17:34 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 170 / EMB 175 (E70) 1:36 Effective 2024-03-13 through 2024-04-03
Mie 16:04 Dallas/Ft. Worth (DFW) 17:43 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:39 Effective 2024-02-21 through 2024-02-28
Mie 16:04 Dallas/Ft. Worth (DFW) 17:43 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 170 / EMB 175 (E70) 1:39 Operates only on 2024-03-06
Diario 16:15 Dallas/Ft. Worth (DFW) 17:53 McAllen/Mission (MFE)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:38 Effective 2024-01-08 through 2024-02-14
Sab 17:32 McAllen/Mission (MFE) 19:08 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Operates only on 2024-03-02
Lun,Mar,Jue-Dom 17:38 McAllen/Mission (MFE) 19:16 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:38 Effective 2024-03-10 through 2024-04-02
Mar,Jue-Sab 17:39 McAllen/Mission (MFE) 19:15 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective 2024-03-05 through 2024-03-09
Lun,Mar,Jue-Dom 17:41 McAllen/Mission (MFE) 19:17 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective 2024-02-15 through 2024-03-01
Lun,Dom 17:41 McAllen/Mission (MFE) 19:17 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective 2024-03-03 through 2024-03-04
Diario 18:00 McAllen/Mission (MFE) 19:41 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:41 Valid until 2024-01-07
Mie 18:08 McAllen/Mission (MFE) 19:46 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 170 / EMB 175 (E70) 1:38 Effective 2024-03-13 through 2024-04-03
Mie 18:14 McAllen/Mission (MFE) 19:50 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective 2024-02-21 through 2024-02-28
Mie 18:14 McAllen/Mission (MFE) 19:50 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 170 / EMB 175 (E70) 1:36 Operates only on 2024-03-06
Diario 18:15 McAllen/Mission (MFE) 20:00 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:45 Effective from 2024-10-27
Diario 18:23 McAllen/Mission (MFE) 19:59 Dallas/Ft. Worth (DFW)
AA 3829 Non-stop Embraer EMB 175 (E75) 1:36 Effective 2024-01-08 through 2024-02-14
This flight number is listed as serving the following routes:
American Airlines vuelo AA 3829: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

American Airlines AA3829
Effective from 2024-10-27
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Operates only on 2024-03-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-02-15 through 2024-03-01
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:40, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-03 through 2024-03-09
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:40, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-10 through 2024-04-02
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Valid until 2024-01-07
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:40, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-13 through 2024-04-03
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:36, non-stop
Embraer EMB 170 / EMB 175 (E70)

American Airlines AA3829
Effective 2024-02-21 through 2024-02-28
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:39, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Operates only on 2024-03-06
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:39, non-stop
Embraer EMB 170 / EMB 175 (E70)

American Airlines AA3829
Effective 2024-01-08 through 2024-02-14
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:38, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Operates only on 2024-03-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-10 through 2024-04-02
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:38, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-05 through 2024-03-09
Lun
-
Mar
Mie
-
Jue
Vie
Sab
Dom
-
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-02-15 through 2024-03-01
Lun
Mar
Mie
-
Jue
Vie
Sab
Dom
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-03 through 2024-03-04
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Valid until 2024-01-07
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:41, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-03-13 through 2024-04-03
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:38, non-stop
Embraer EMB 170 / EMB 175 (E70)

American Airlines AA3829
Effective 2024-02-21 through 2024-02-28
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:36, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Operates only on 2024-03-06
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:36, non-stop
Embraer EMB 170 / EMB 175 (E70)

American Airlines AA3829
Effective from 2024-10-27
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:45, non-stop
Embraer EMB 175 (E75)

American Airlines AA3829
Effective 2024-01-08 through 2024-02-14
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Duration: 1:36, non-stop
Embraer EMB 175 (E75)
This flight number is listed as serving the following routes:
  • McAllen/Mission (MFE) - Dallas/Ft. Worth (DFW)