Aerolineas Argentinas vuelo AR 1659: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun,Mie,Sab,Dom 15:20 San Martin los Andes (CPC) 17:20 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-04-08 through 2024-06-30
Mar,Vie 15:20 San Martin los Andes (CPC) 17:20 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective 2024-04-09 through 2024-06-28
Jue 15:20 San Martin los Andes (CPC) 17:20 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-700 (73R) 2:00 Effective 2024-04-11 through 2024-06-27
Mar,Jue 15:20 San Martin los Andes (CPC) 17:20 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-07-02 through 2024-09-26
Mie,Vie,Sab 15:20 San Martin los Andes (CPC) 17:20 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective 2024-07-03 through 2024-09-28
Dom 15:20 San Martin los Andes (CPC) 17:20 Ministro Pistarini, Buenos Aires (EZE) C
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-07-07 through 2024-09-29
Lun 15:50 San Martin los Andes (CPC) 17:50 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-07-01 through 2024-09-30
Lun,Mie,Jue,Sab,Dom 16:05 San Martin los Andes (CPC) 18:05 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-04-01 through 2024-04-07
Mar,Vie 16:05 San Martin los Andes (CPC) 18:05 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective 2024-04-02 through 2024-04-05
Mar,Sab,Dom 16:25 San Martin los Andes (CPC) 18:25 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective 2024-10-01 through 2024-10-26
Lun,Mie 16:25 San Martin los Andes (CPC) 18:25 Ministro Pistarini, Buenos Aires (EZE) C
AR 1659 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective from 2024-10-02
Vie 16:25 San Martin los Andes (CPC) 18:25 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-10-04 through 2024-10-25
Dom 16:25 San Martin los Andes (CPC) 18:25 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective from 2024-10-27
Mar,Vie,Sab 16:25 San Martin los Andes (CPC) 18:25 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective from 2024-10-29
Jue 16:40 San Martin los Andes (CPC) 18:40 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 2:00 Effective from 2024-10-03
Vie,Dom 19:00 Neuquen (NQN) 20:40 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 1:40 Effective 2024-03-01 through 2024-03-31
Lun 19:30 Neuquen (NQN) 21:10 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2024-03-04
Lun 19:30 Neuquen (NQN) 21:10 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-200 Combi (73M) 1:40 Effective 2024-03-11 through 2024-03-18
Lun 19:30 Neuquen (NQN) 21:10 Jorge Newbery, Buenos Aires (AEP)
AR 1659 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2024-03-25
This flight number is listed as serving the following routes:
Aerolineas Argentinas vuelo AR 1659: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Aerolineas Argentinas AR1659
Effective 2024-04-08 through 2024-06-30
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
Dom
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-04-09 through 2024-06-28
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Effective 2024-04-11 through 2024-06-27
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73R)

Aerolineas Argentinas AR1659
Effective 2024-07-02 through 2024-09-26
Lun
-
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-07-03 through 2024-09-28
Lun
-
Mar
-
Mie
Jue
-
Vie
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Effective 2024-07-07 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-07-01 through 2024-09-30
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-04-01 through 2024-04-07
Lun
Mar
-
Mie
Jue
Vie
-
Sab
Dom
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-04-02 through 2024-04-05
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Effective 2024-10-01 through 2024-10-26
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
Dom
Duration: 2:00, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Effective from 2024-10-02
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Effective 2024-10-04 through 2024-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective from 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective from 2024-10-29
Lun
-
Mar
Mie
-
Jue
-
Vie
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Effective from 2024-10-03
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-03-01 through 2024-03-31
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Operates only on 2024-03-04
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Aerolineas Argentinas AR1659
Effective 2024-03-11 through 2024-03-18
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-200 Combi (73M)

Aerolineas Argentinas AR1659
Operates only on 2024-03-25
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (738)
This flight number is listed as serving the following routes:
  • Neuquen (NQN) - Jorge Newbery, Buenos Aires (AEP)
  • San Martin los Andes (CPC) - Jorge Newbery, Buenos Aires (AEP)
  • San Martin los Andes (CPC) - Ministro Pistarini, Buenos Aires (EZE)