Alle Airlines ab Toronto Pearson (YYZ) nach Merida (MID).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:36 Effective 2024-11-19 through 2024-12-03
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-700 (73W) 4:36 Operates only on 2024-12-10
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:36 Operates only on 2024-12-17
Do 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-700 (73W) 4:36 Effective 2024-12-19 through 2024-12-26
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (7S8) 4:36 Effective 2024-12-24 through 2024-12-31
Do 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:36 Operates only on 2025-01-02
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-700 (73W) 4:36 Operates only on 2025-01-07
Do 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (7S8) 4:36 Operates only on 2025-01-09
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:36 Operates only on 2025-01-14
Do 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737 MAX 8 (7M8) 4:36 Effective 2025-01-16 through 2025-01-30
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-700 (73W) 4:36 Operates only on 2025-01-21
Di 10:05 Toronto Pearson (YYZ) 3 13:41 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:36 Operates only on 2025-01-28
Di 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737 MAX 8 (7M8) 4:28 Operates only on 2025-02-04
Do 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-700 (73W) 4:28 Operates only on 2025-02-06
Di 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (7S8) 4:28 Operates only on 2025-02-11
Di,Do 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:28 Effective 2025-02-13 through 2025-02-18
Do 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-700 (73W) 4:28 Operates only on 2025-02-20
Di 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:28 Operates only on 2025-02-25
Do 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737 MAX 8 (7M8) 4:28 Operates only on 2025-02-27
Di 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (7S8) 4:28 Operates only on 2025-03-04
Do 10:05 Toronto Pearson (YYZ) 3 13:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:28 Operates only on 2025-03-06
Di 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (7S8) 4:28 Operates only on 2025-03-11
Di,Do 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737 MAX 8 (7M8) 4:28 Effective 2025-03-13 through 2025-03-20
Di 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:28 Operates only on 2025-03-25
Di,Do 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737 MAX 8 (7M8) 4:28 Effective 2025-03-27 through 2025-04-01
Di 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (73H) 4:28 Operates only on 2025-04-08
Di 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737 MAX 8 (7M8) 4:28 Operates only on 2025-04-15
Di 10:05 Toronto Pearson (YYZ) 3 12:33 Merida (MID)
WestJet WS 2792 Non-stop Boeing 737-800 (7S8) 4:28 Operates only on 2025-04-22


Alle Airlines ab Toronto Pearson (YYZ) nach Merida (MID).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Effective 2024-11-19 through 2024-12-03
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (73H)

Operates only on 2024-12-10
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-17
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (73H)

Effective 2024-12-19 through 2024-12-26
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2024-12-31
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (7S8)

Operates only on 2025-01-02
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-07
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-09
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (7S8)

Operates only on 2025-01-14
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (73H)

Effective 2025-01-16 through 2025-01-30
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-21
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-28
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:36, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-04
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-02-06
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-700 (73W)

Operates only on 2025-02-11
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (7S8)

Effective 2025-02-13 through 2025-02-18
Mo
-
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-20
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-700 (73W)

Operates only on 2025-02-25
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-27
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-03-04
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (7S8)

Operates only on 2025-03-06
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-11
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (7S8)

Effective 2025-03-13 through 2025-03-20
Mo
-
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-03-25
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (73H)

Effective 2025-03-27 through 2025-04-01
Mo
-
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-04-08
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (73H)

Operates only on 2025-04-15
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-04-22
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:28, non-stop
Boeing 737-800 (7S8)
  • Eine internationale Strecke Abflug vom Toronto Pearson, Canada (YYZ) und Ankunft am Merida, Mexico (MID).
  • Der Flug geht über eine Entfernung von 1673 Meilen oder 2692 Kilometer.
  • Die Zeitzone des Abflughafens ist UTC-5 , und die Zeitzone des Zielflughafens ist UTC-6 . Die aktuelle Zeit am Abflugort ist (loading...) und (loading...) am Zielort. Zwischen beiden Flughäfen besteht ein Zeitunterschied von (loading...) Stunden.
  • Bei Direktflügen kann die Flugzeit zwischen 4:28 und 4:36 betragen.