Alle Airlines ab Songshan, Taipei (TSA) nach Fuzhou (FOC).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Di,Mi,Fr 07:10 Songshan, Taipei (TSA) 1 08:40 Fuzhou (FOC)
Mandarin Airlines AE 211 Non-stop Boeing 737-800 (738) 1:30 Valid until 2024-10-25
Di,Mi,Fr 07:10 Songshan, Taipei (TSA) 1 08:40 Fuzhou (FOC)
Mandarin Airlines AE 211 Non-stop Boeing 737-800 (738) 1:30 Effective from 2025-04-01
Di,Mi,Fr 07:35 Songshan, Taipei (TSA) 1 09:15 Fuzhou (FOC)
Mandarin Airlines AE 211 Non-stop Boeing 737-800 (738) 1:40 Effective 2024-10-29 through 2025-03-28
Mo-Do,Sa,So 20:45 Songshan, Taipei (TSA) 1 22:15 Fuzhou (FOC)
Xiamen Airlines MF 884 Non-stop Boeing 737-800 (738) 1:30 Valid until 2024-10-26
Mo-Do,Sa,So 20:45 Songshan, Taipei (TSA) 1 22:25 Fuzhou (FOC)
Xiamen Airlines MF 884 Non-stop Boeing 737-800 (738) 1:40 Effective 2024-10-27 through 2025-03-29
Mo-Do,Sa,So 20:45 Songshan, Taipei (TSA) 1 22:15 Fuzhou (FOC)
Xiamen Airlines MF 884 Non-stop Boeing 737-800 (738) 1:30 Effective from 2025-03-30
Direkte Codeshareflüge:
Mo-Do,Sa,So 20:45 Songshan, Taipei (TSA) 1 22:15 Fuzhou (FOC)
Mandarin Airlines AE 5107 Non-stop Boeing 737-800 (738) 1:30 Valid until 2024-10-26
Codeshare flight, operated by Xiamen Airlines.(MF 884)
Di,Mi,Fr 07:10 Songshan, Taipei (TSA) 1 08:40 Fuzhou (FOC)
Xiamen Airlines MF 9029 Non-stop Boeing 737-800 (738) 1:30
Codeshare flight, operated by Mandarin Airlines.(AE 211)


Alle Airlines ab Songshan, Taipei (TSA) nach Fuzhou (FOC).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Valid until 2024-10-25
Mo
-
Di
Mi
Do
-
Fr
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-800 (738)

Effective from 2025-04-01
Mo
-
Di
Mi
Do
-
Fr
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-29 through 2025-03-28
Mo
-
Di
Mi
Do
-
Fr
Sa
-
So
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Valid until 2024-10-26
Mo
Di
Mi
Do
Fr
-
Sa
So
Duration: 1:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-29
Mo
Di
Mi
Do
Fr
-
Sa
So
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective from 2025-03-30
Mo
Di
Mi
Do
Fr
-
Sa
So
Duration: 1:30, non-stop
Boeing 737-800 (738)

Direkte Codeshareflüge:

Valid until 2024-10-26
Mo
Di
Mi
Do
Fr
-
Sa
So
Codeshare flight, operated by Xiamen Airlines. (MF 884)
Duration: 1:30, non-stop
Boeing 737-800 (738)

Mo
-
Di
Mi
Do
-
Fr
Sa
-
So
-
Codeshare flight, operated by Mandarin Airlines. (AE 211)
Duration: 1:30, non-stop
Boeing 737-800 (738)
  • Eine internationale Strecke Abflug vom Songshan, Taipei, Taiwan (TSA) und Ankunft am Fuzhou, China (FOC).
  • Der Flug geht über eine Entfernung von 132 Meilen oder 212 Kilometer.
  • Der Abflug- und der Zielflughafen liegen in folgender/folgenden Zeitzone/n UTC+8 . Die aktuelle Zeit in beiden Flughäfen ist (loading...).
  • Bei Direktflügen kann die Flugzeit zwischen 1:30 und 1:40 betragen.