Alle Airlines ab Baku (GYD) nach Vienna (VIE).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Di,Fr,Sa 08:00 Baku (GYD) 1 10:20 Vienna (VIE) 1
Azerbaijan Airlines J2 71 Non-stop Airbus A320 (320) 4:20 Valid until 2024-10-26
Di,Fr,Sa 08:30 Baku (GYD) 1 10:00 Vienna (VIE) 1
Azerbaijan Airlines J2 71 Non-stop Airbus A320 (320) 4:30 Effective 2024-10-29 through 2025-03-29
Di,Fr,Sa 08:30 Baku (GYD) 1 10:00 Vienna (VIE) 1
Azerbaijan Airlines J2 71 Non-stop Airbus A320 (320) 3:30 Effective from 2025-04-01
Mo 17:30 Baku (GYD) 19:45 Vienna (VIE)
Silk Way West Airlines 7L 280 Non-stop Boeing 747-8 Freighter (74N) 4:15 Valid until 2024-10-21
This is a Scheduled Cargo flight.
Mo 17:30 Baku (GYD) 19:45 Vienna (VIE)
Silk Way West Airlines 7L 280 Non-stop Boeing 747-8 Freighter (74N) 5:15 Effective 2024-10-28 through 2025-03-24
This is a Scheduled Cargo flight.
Mo 17:30 Baku (GYD) 19:45 Vienna (VIE)
Silk Way West Airlines 7L 280 Non-stop Boeing 747-8 Freighter (74N) 4:15 Effective from 2025-03-31
This is a Scheduled Cargo flight.
Fr 15:00 Baku (GYD) 17:15 Vienna (VIE)
Silk Way West Airlines 7L 284 Non-stop Boeing 747-8 Freighter (74N) 4:15 Valid until 2024-10-25
This is a Scheduled Cargo flight.
Fr 15:00 Baku (GYD) 17:15 Vienna (VIE)
Silk Way West Airlines 7L 284 Non-stop Boeing 747-8 Freighter (74N) 5:15 Effective 2024-11-01 through 2025-03-28
This is a Scheduled Cargo flight.
Fr 15:00 Baku (GYD) 17:15 Vienna (VIE)
Silk Way West Airlines 7L 284 Non-stop Boeing 747-8 Freighter (74N) 4:15 Effective from 2025-04-04
This is a Scheduled Cargo flight.


Alle Airlines ab Baku (GYD) nach Vienna (VIE).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

08:00

10:20
Valid until 2024-10-26
Mo
-
Di
Mi
-
Do
-
Fr
Sa
So
-
Duration: 4:20, non-stop
Airbus A320 (320)

08:30

10:00
Effective 2024-10-29 through 2025-03-29
Mo
-
Di
Mi
-
Do
-
Fr
Sa
So
-
Duration: 4:30, non-stop
Airbus A320 (320)

08:30

10:00
Effective from 2025-04-01
Mo
-
Di
Mi
-
Do
-
Fr
Sa
So
-
Duration: 3:30, non-stop
Airbus A320 (320)

17:30

19:45
Valid until 2024-10-21
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:15, non-stop
Boeing 747-8 Freighter (74N)

17:30

19:45
Effective 2024-10-28 through 2025-03-24
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 5:15, non-stop
Boeing 747-8 Freighter (74N)

17:30

19:45
Effective from 2025-03-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:15, non-stop
Boeing 747-8 Freighter (74N)

15:00

17:15
Valid until 2024-10-25
This is a Scheduled Cargo flight.
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 4:15, non-stop
Boeing 747-8 Freighter (74N)

15:00

17:15
Effective 2024-11-01 through 2025-03-28
This is a Scheduled Cargo flight.
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 5:15, non-stop
Boeing 747-8 Freighter (74N)

15:00

17:15
Effective from 2025-04-04
This is a Scheduled Cargo flight.
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 4:15, non-stop
Boeing 747-8 Freighter (74N)
  • Eine internationale Strecke Abflug vom Baku, Azerbaijan (GYD) und Ankunft am Vienna, Austria (VIE).
  • Der Flug geht über eine Entfernung von 1721 Meilen oder 2770 Kilometer.
  • Die Zeitzone des Abflughafens ist UTC+4 , und die Zeitzone des Zielflughafens ist UTC+1 . Die aktuelle Zeit am Abflugort ist (loading...) und (loading...) am Zielort. Zwischen beiden Flughäfen besteht ein Zeitunterschied von (loading...) Stunden.
  • Bei Direktflügen kann die Flugzeit zwischen 3:30 und 5:15 betragen.