Alle Airlines ab Gaborone (GBE) nach Maun (MUB).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Fr 06:40 Gaborone (GBE) 07:40 Maun (MUB)
Air Botswana BP 30 Non-stop Embraer EMB 175 (E75) 1:00 Effective 2024-09-06 through 2024-10-25
Fr 06:40 Gaborone (GBE) 07:40 Maun (MUB)
Air Botswana BP 30 Non-stop Embraer ERJ 145 (ER4) 1:00 Effective from 2024-11-01
Sa 07:00 Gaborone (GBE) 08:00 Maun (MUB)
Air Botswana BP 30 Non-stop Embraer ERJ 145 (ER4) 1:00 Effective from 2024-11-02
Mo 07:10 Gaborone (GBE) 08:10 Maun (MUB)
Air Botswana BP 30 Non-stop Embraer ERJ 145 (ER4) 1:00 Effective from 2024-11-04
Di,Do 07:15 Gaborone (GBE) 08:15 Maun (MUB)
Air Botswana BP 32 Non-stop Embraer EMB 170 / EMB 190 (EMJ) 1:00 Effective 2024-09-03 through 2024-10-01
Do 07:15 Gaborone (GBE) 08:15 Maun (MUB)
Air Botswana BP 32 Non-stop Embraer EMB 175 (E75) 1:00 Effective 2024-10-03 through 2024-10-31
Di 07:15 Gaborone (GBE) 08:15 Maun (MUB)
Air Botswana BP 32 Non-stop Embraer EMB 170 / EMB 190 (EMJ) 1:00 Effective 2024-10-08 through 2024-10-29
Sa 07:30 Gaborone (GBE) 09:00 Maun (MUB)
Air Botswana BP 32 Non-stop ATR 72 (AT7) 1:30 Valid until 2024-10-26
Di 09:30 Gaborone (GBE) 10:30 Maun (MUB)
Air Botswana BP 32 Non-stop Embraer ERJ 145 (ER4) 1:00 Effective from 2024-11-05
Do 09:30 Gaborone (GBE) 10:30 Maun (MUB)
Air Botswana BP 32 Non-stop Embraer EMB 170 / EMB 190 (EMJ) 1:00 Effective from 2024-11-07
Mo 11:00 Gaborone (GBE) 12:30 Maun (MUB)
Air Botswana BP 32 Non-stop ATR 72 (AT7) 1:30 Effective 2024-09-02 through 2024-10-28
Fr,So 17:45 Gaborone (GBE) 19:15 Maun (MUB)
Air Botswana BP 32 Non-stop ATR 72 (AT7) 1:30 Effective from 2024-11-01
Mo 11:00 Gaborone (GBE) 12:30 Maun (MUB)
Air Botswana BP 34 Non-stop ATR 72 (AT7) 1:30 Effective 2024-11-04 through 2024-12-02
Mi 12:25 Gaborone (GBE) 13:55 Maun (MUB)
Air Botswana BP 34 Non-stop ATR 72 (AT7) 1:30 Effective 2024-10-02 through 2024-10-30
Mi 12:40 Gaborone (GBE) 13:40 Maun (MUB)
Air Botswana BP 34 Non-stop Embraer EMB 170 / EMB 190 (EMJ) 1:00 Effective 2024-09-04 through 2024-09-11
Mi 12:40 Gaborone (GBE) 13:40 Maun (MUB)
Air Botswana BP 34 Non-stop Embraer EMB 175 (E75) 1:00 Effective 2024-09-18 through 2024-09-25
Mo 14:50 Gaborone (GBE) 16:20 Maun (MUB)
Air Botswana BP 34 Non-stop ATR 72 (AT7) 1:30 Effective from 2024-12-09
So 17:45 Gaborone (GBE) 18:45 Maun (MUB)
Air Botswana BP 34 Non-stop Embraer EMB 170 / EMB 190 (EMJ) 1:00 Valid until 2024-09-29
Fr 17:45 Gaborone (GBE) 18:45 Maun (MUB)
Air Botswana BP 34 Non-stop Embraer EMB 175 (E75) 1:00 Effective 2024-09-06 through 2024-10-04
Fr,So 17:45 Gaborone (GBE) 18:45 Maun (MUB)
Air Botswana BP 34 Non-stop Embraer EMB 175 (E75) 1:00 Effective 2024-10-06 through 2024-10-27
Mi 19:00 Gaborone (GBE) 20:00 Maun (MUB)
Air Botswana BP 34 Non-stop Embraer EMB 175 (E75) 1:00 Effective from 2024-11-06


Alle Airlines ab Gaborone (GBE) nach Maun (MUB).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Effective 2024-09-06 through 2024-10-25
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 175 (E75)

Effective from 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:00, non-stop
Embraer ERJ 145 (ER4)

Effective from 2024-11-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:00, non-stop
Embraer ERJ 145 (ER4)

Effective from 2024-11-04
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer ERJ 145 (ER4)

Effective 2024-09-03 through 2024-10-01
Mo
-
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 170 / EMB 190 (EMJ)

Effective 2024-10-03 through 2024-10-31
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 175 (E75)

Effective 2024-10-08 through 2024-10-29
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 170 / EMB 190 (EMJ)

Valid until 2024-10-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Effective from 2024-11-05
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer ERJ 145 (ER4)

Effective from 2024-11-07
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 170 / EMB 190 (EMJ)

Effective 2024-09-02 through 2024-10-28
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Effective from 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:30, non-stop
ATR 72 (AT7)

Effective 2024-11-04 through 2024-12-02
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Effective 2024-10-02 through 2024-10-30
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Effective 2024-09-04 through 2024-09-11
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 170 / EMB 190 (EMJ)

Effective 2024-09-18 through 2024-09-25
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 175 (E75)

Effective from 2024-12-09
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
ATR 72 (AT7)

Valid until 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:00, non-stop
Embraer EMB 170 / EMB 190 (EMJ)

Effective 2024-09-06 through 2024-10-04
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 175 (E75)

Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:00, non-stop
Embraer EMB 175 (E75)

Effective from 2024-11-06
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Embraer EMB 175 (E75)
  • Eine Inlandstrecke Abflug vom Gaborone (GBE) und Ankunft am Maun (MUB).
  • Der Flug geht über eine Entfernung von 354 Meilen oder 569 Kilometer.
  • Der Abflug- und der Zielflughafen liegen in folgender/folgenden Zeitzone/n UTC+2 . Die aktuelle Zeit in beiden Flughäfen ist (loading...).
  • Bei Direktflügen kann die Flugzeit zwischen 1:00 und 1:30 betragen.