Southwest Airlines flüge ab Love Field, Dallas (DAL) nach Amarillo (AMA).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo 11:00 Love Field, Dallas (DAL) 1 12:20 Amarillo (AMA)
Southwest Airlines WN 3371 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-03-03
So 09:40 Love Field, Dallas (DAL) 1 11:00 Amarillo (AMA)
Southwest Airlines WN 3439 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-12-01
Mo,Do,Fr,So 22:15 Love Field, Dallas (DAL) 1 23:35 Amarillo (AMA)
Southwest Airlines WN 3483 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-13 through 2025-02-17
Do,Fr,So 22:15 Love Field, Dallas (DAL) 1 23:35 Amarillo (AMA)
Southwest Airlines WN 3483 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-21 through 2025-03-02
Di,Mi 19:45 Love Field, Dallas (DAL) 1 21:05 Amarillo (AMA)
Southwest Airlines WN 3573 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-10-08 through 2024-10-30
Do 09:10 Love Field, Dallas (DAL) 1 10:30 Amarillo (AMA)
Southwest Airlines WN 3689 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-10-31
So 15:25 Love Field, Dallas (DAL) 1 16:40 Amarillo (AMA)
Southwest Airlines WN 3949 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-06 through 2024-10-27
Di,Mi 15:30 Love Field, Dallas (DAL) 1 16:45 Amarillo (AMA)
Southwest Airlines WN 3949 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-08 through 2024-10-30
Mo,Do,Fr 16:15 Love Field, Dallas (DAL) 1 17:35 Amarillo (AMA)
Southwest Airlines WN 3949 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-03 through 2024-10-28
Fr 16:15 Love Field, Dallas (DAL) 1 17:35 Amarillo (AMA)
Southwest Airlines WN 3949 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-11-01
Sa 18:50 Love Field, Dallas (DAL) 1 20:10 Amarillo (AMA)
Southwest Airlines WN 3949 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-10-05 through 2024-11-02
So 19:15 Love Field, Dallas (DAL) 1 20:35 Amarillo (AMA)
Southwest Airlines WN 3967 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-09-01
Mo,Do,Fr 08:30 Love Field, Dallas (DAL) 1 09:45 Amarillo (AMA)
Southwest Airlines WN 4126 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2024-09-30
Di,Mi 09:50 Love Field, Dallas (DAL) 1 11:05 Amarillo (AMA)
Southwest Airlines WN 4126 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2024-10-02
So 09:50 Love Field, Dallas (DAL) 1 11:05 Amarillo (AMA)
Southwest Airlines WN 4126 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2024-09-01
So 21:50 Love Field, Dallas (DAL) 1 23:05 Amarillo (AMA)
Southwest Airlines WN 4332 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-06 through 2024-10-27
Mo-Mi 13:40 Love Field, Dallas (DAL) 1 15:00 Amarillo (AMA)
Southwest Airlines WN 4345 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-04 through 2024-11-06
Di,Mi 13:40 Love Field, Dallas (DAL) 1 15:00 Amarillo (AMA)
Southwest Airlines WN 4345 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-12 through 2024-11-20
Di-Fr 13:40 Love Field, Dallas (DAL) 1 15:00 Amarillo (AMA)
Southwest Airlines WN 4345 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-29 through 2024-12-06
Mo-Do 13:40 Love Field, Dallas (DAL) 1 15:00 Amarillo (AMA)
Southwest Airlines WN 4345 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-09 through 2024-12-18
Di,Mi 13:40 Love Field, Dallas (DAL) 1 15:00 Amarillo (AMA)
Southwest Airlines WN 4345 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-24 through 2025-01-01
Mo 13:40 Love Field, Dallas (DAL) 1 15:00 Amarillo (AMA)
Southwest Airlines WN 4345 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-01-06
Sa 16:15 Love Field, Dallas (DAL) 1 17:35 Amarillo (AMA)
Southwest Airlines WN 4358 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-23 through 2024-11-30
Sa 16:15 Love Field, Dallas (DAL) 1 17:35 Amarillo (AMA)
Southwest Airlines WN 4358 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-21 through 2025-01-04
Mo,Do,Fr 11:45 Love Field, Dallas (DAL) 1 13:00 Amarillo (AMA)
Southwest Airlines WN 4474 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2024-09-30
Di,Mi 20:45 Love Field, Dallas (DAL) 1 22:00 Amarillo (AMA)
Southwest Airlines WN 4474 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2024-10-02
Di,Mi 11:00 Love Field, Dallas (DAL) 1 12:15 Amarillo (AMA)
Southwest Airlines WN 4527 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-08 through 2024-10-30
Do,Fr,So 08:50 Love Field, Dallas (DAL) 1 10:10 Amarillo (AMA)
Southwest Airlines WN 4530 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 08:50 Love Field, Dallas (DAL) 1 10:10 Amarillo (AMA)
Southwest Airlines WN 4530 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-11 through 2024-11-25
Fr,So 08:50 Love Field, Dallas (DAL) 1 10:10 Amarillo (AMA)
Southwest Airlines WN 4530 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-08 through 2024-12-15
Do 08:50 Love Field, Dallas (DAL) 1 10:10 Amarillo (AMA)
Southwest Airlines WN 4530 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2024-12-19
Fr 08:50 Love Field, Dallas (DAL) 1 10:10 Amarillo (AMA)
Southwest Airlines WN 4530 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-03
Do,Fr,So 21:55 Love Field, Dallas (DAL) 1 23:10 Amarillo (AMA)
Southwest Airlines WN 4575 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 21:55 Love Field, Dallas (DAL) 1 23:10 Amarillo (AMA)
Southwest Airlines WN 4575 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-11 through 2024-11-25
Fr,So 21:55 Love Field, Dallas (DAL) 1 23:10 Amarillo (AMA)
Southwest Airlines WN 4575 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-08 through 2024-12-15
Do 21:55 Love Field, Dallas (DAL) 1 23:10 Amarillo (AMA)
Southwest Airlines WN 4575 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-12-19
Fr 21:55 Love Field, Dallas (DAL) 1 23:10 Amarillo (AMA)
Southwest Airlines WN 4575 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2025-01-03
So 09:35 Love Field, Dallas (DAL) 1 10:50 Amarillo (AMA)
Southwest Airlines WN 4730 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-10-06 through 2024-10-27
Sa 09:50 Love Field, Dallas (DAL) 1 11:10 Amarillo (AMA)
Southwest Airlines WN 4855 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-11 through 2025-02-08
Mo-Fr 14:40 Love Field, Dallas (DAL) 1 16:00 Amarillo (AMA)
Southwest Airlines WN 4855 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-01-07 through 2025-01-15
Di-Fr,So 14:40 Love Field, Dallas (DAL) 1 16:00 Amarillo (AMA)
Southwest Airlines WN 4855 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-01-19 through 2025-01-24
Mo-Fr 14:40 Love Field, Dallas (DAL) 1 16:00 Amarillo (AMA)
Southwest Airlines WN 4855 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-01-27 through 2025-02-05
Di,Mi,So 14:40 Love Field, Dallas (DAL) 1 16:00 Amarillo (AMA)
Southwest Airlines WN 4855 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-09 through 2025-02-12
Di,Mi 14:40 Love Field, Dallas (DAL) 1 16:00 Amarillo (AMA)
Southwest Airlines WN 4855 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-19 through 2025-03-05
Sa 09:40 Love Field, Dallas (DAL) 1 11:00 Amarillo (AMA)
Southwest Airlines WN 4918 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-02-15 through 2025-03-01
Do,Fr,So 16:25 Love Field, Dallas (DAL) 1 17:45 Amarillo (AMA)
Southwest Airlines WN 4918 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-12 through 2025-01-17
Mo,So 16:25 Love Field, Dallas (DAL) 1 17:45 Amarillo (AMA)
Southwest Airlines WN 4918 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 16:25 Love Field, Dallas (DAL) 1 17:45 Amarillo (AMA)
Southwest Airlines WN 4918 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-02 through 2025-02-07
Mo 16:25 Love Field, Dallas (DAL) 1 17:45 Amarillo (AMA)
Southwest Airlines WN 4918 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-02-10
Mo,Di,Do 16:25 Love Field, Dallas (DAL) 1 17:45 Amarillo (AMA)
Southwest Airlines WN 4918 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-02-18 through 2025-02-24
prev   1 2 3 4   next


Southwest Airlines flüge ab Love Field, Dallas (DAL) nach Amarillo (AMA).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-10-08 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-10-31
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-10-08 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-10-05 through 2024-11-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Valid until 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Mo
Di
Mi
Do
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Valid until 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-10-08 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2025-01-11 through 2025-02-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-07 through 2025-01-15
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-19 through 2025-01-24
Mo
-
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-27 through 2025-02-05
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-09 through 2025-02-12
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-19 through 2025-03-05
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-15 through 2025-03-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)
prev        Page 3 / 4        next
  • Eine Inlandstrecke Abflug vom Love Field, Dallas (DAL) und Ankunft am Amarillo (AMA).
  • Der Flug geht über eine Entfernung von 323 Meilen oder 520 Kilometer.
  • Der Abflug- und der Zielflughafen liegen in folgender/folgenden Zeitzone/n UTC-6 . Die aktuelle Zeit in beiden Flughäfen ist (loading...).
  • Bei Direktflügen kann die Flugzeit zwischen 1:15 und 1:20 betragen.