Neos flüge ab Verona (VRN) nach Sharm el-Sheikh (SSH).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo 18:00 Verona (VRN) 22:50 Sharm el-Sheikh (SSH) 2
Neos NO 1502 Non-stop Boeing 737 (737) 3:50 Effective 2024-12-23 through 2025-01-06
Mi 18:00 Verona (VRN) 21:50 Sharm el-Sheikh (SSH) 2
Neos NO 3962 Non-stop Boeing 737 (737) 3:50 Effective 2025-04-16 through 2025-04-23
Mi 18:00 Verona (VRN) 22:50 Sharm el-Sheikh (SSH) 2
Neos NO 3962 Non-stop Boeing 737 (737) 3:50 Effective from 2025-04-30
Do 16:30 Verona (VRN) 21:20 Sharm el-Sheikh (SSH) 2
Neos NO 4432 Non-stop Boeing 737 (737) 3:50 Effective 2024-12-26 through 2025-01-09
Do 06:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 Non-stop Boeing 737 (737) 3:50 Effective 2024-11-14 through 2024-11-21
Do 06:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 Non-stop Boeing 737 (737) 3:50 Effective 2025-02-27 through 2025-03-27
Do 07:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 Non-stop Boeing 737 (737) 3:50 Effective 2025-04-03 through 2025-04-24
Do 07:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 Non-stop Boeing 737 (737) 2:50 Effective from 2025-05-01
Fr 17:00 Verona (VRN) 21:50 Sharm el-Sheikh (SSH) 2
Neos NO 5248 Non-stop Boeing 737 (737) 3:50 Effective 2025-02-21 through 2025-03-28
Fr 18:00 Verona (VRN) 21:50 Sharm el-Sheikh (SSH) 2
Neos NO 5248 Non-stop Boeing 737 (737) 3:50 Effective 2025-04-04 through 2025-04-18
Fr 18:00 Verona (VRN) 22:50 Sharm el-Sheikh (SSH) 2
Neos NO 5248 Non-stop Boeing 737 (737) 3:50 Effective from 2025-04-25
Fr 18:00 Verona (VRN) 21:50 Sharm el-Sheikh (SSH) 2
Neos NO 5624 Non-stop Boeing 737 (737) 3:50 Effective 2025-04-11 through 2025-04-18
Fr 18:00 Verona (VRN) 22:50 Sharm el-Sheikh (SSH) 2
Neos NO 5624 Non-stop Boeing 737 (737) 3:50 Effective from 2025-04-25
Fr 06:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 5632 Non-stop Boeing 737 (737) 3:50 Effective 2024-12-20 through 2025-01-10
Sa 06:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2025-03-22 through 2025-03-29
Sa 07:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2024-09-14 through 2024-09-28
Sa 07:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2024-11-02 through 2024-12-14
Sa 07:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2025-04-05 through 2025-04-19
Sa 07:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective from 2025-04-26
Sa 08:00 Verona (VRN) 12:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2024-10-05 through 2024-10-26
Sa 17:05 Verona (VRN) 21:55 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2024-12-21 through 2025-01-04
Sa 17:40 Verona (VRN) 22:30 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2025-01-18 through 2025-02-08
Sa 18:00 Verona (VRN) 22:50 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Operates only on 2024-09-07
Sa 18:25 Verona (VRN) 23:15 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Effective 2025-02-15 through 2025-03-15
Sa 18:40 Verona (VRN) 23:30 Sharm el-Sheikh (SSH) 2
Neos NO 6508 Non-stop Boeing 737 (737) 3:50 Operates only on 2025-01-11
Sa 07:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 6920 Non-stop Boeing 737 (737) 3:50 Valid until 2024-09-07
So 06:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Operates only on 2024-10-27
So 06:00 Verona (VRN) 10:50 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Effective 2024-11-03 through 2024-11-17
So 07:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Effective 2024-11-24 through 2024-12-15
So 08:00 Verona (VRN) 12:50 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Effective 2024-10-06 through 2024-10-20
So 16:00 Verona (VRN) 20:50 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Operates only on 2024-09-15
So 18:30 Verona (VRN) 23:20 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Valid until 2024-09-08
So 18:30 Verona (VRN) 23:20 Sharm el-Sheikh (SSH) 2
Neos NO 7148 Non-stop Boeing 737 (737) 3:50 Effective 2024-09-22 through 2024-09-29
So 17:00 Verona (VRN) 21:50 Sharm el-Sheikh (SSH) 2
Neos NO 7248 Non-stop Boeing 737 (737) 3:50 Effective 2024-12-22 through 2025-01-05
So 07:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 7928 Non-stop Boeing 737 (737) 3:50 Effective 2024-12-22 through 2025-03-23
So 08:00 Verona (VRN) 11:50 Sharm el-Sheikh (SSH) 2
Neos NO 7928 Non-stop Boeing 737 (737) 3:50 Effective 2025-03-30 through 2025-04-20
So 08:00 Verona (VRN) 12:50 Sharm el-Sheikh (SSH) 2
Neos NO 7928 Non-stop Boeing 737 (737) 3:50 Effective from 2025-04-27
Indirekte Flüge:
Di 08:00 Verona (VRN) 14:50 Sharm el-Sheikh (SSH) 2
Neos NO 2522 1-stop Boeing 737 (737) 5:50 Effective 2024-12-24 through 2025-01-07
Mi 09:30 Verona (VRN) 17:20 Sharm el-Sheikh (SSH) 2
Neos NO 3462 1-stop Boeing 737 (737) 5:50 Operates only on 2024-10-30
Mi 09:30 Verona (VRN) 16:20 Sharm el-Sheikh (SSH) 2
Neos NO 3462 1-stop Boeing 737 (737) 5:50 Operates only on 2024-11-06
Mi 10:30 Verona (VRN) 17:20 Sharm el-Sheikh (SSH) 2
Neos NO 3462 1-stop Boeing 737 (737) 5:50 Valid until 2024-10-23
Do 07:00 Verona (VRN) 13:10 Sharm el-Sheikh (SSH) 2
Neos NO 4456 1-stop Boeing 737 (737) 5:10 Valid until 2024-09-12
Do 07:00 Verona (VRN) 13:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 1-stop Boeing 737 (737) 5:50 Effective 2025-01-16 through 2025-02-20
Do 08:00 Verona (VRN) 15:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 1-stop Boeing 737 (737) 5:50 Operates only on 2024-10-31
Do 08:00 Verona (VRN) 14:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 1-stop Boeing 737 (737) 5:50 Operates only on 2024-11-07
Do 09:00 Verona (VRN) 15:50 Sharm el-Sheikh (SSH) 2
Neos NO 4456 1-stop Boeing 737 (737) 5:50 Effective 2024-09-19 through 2024-10-24
Do 07:00 Verona (VRN) 13:50 Sharm el-Sheikh (SSH) 2
Neos NO 4508 1-stop Boeing 737 (737) 5:50 Operates only on 2024-12-19


Neos flüge ab Verona (VRN) nach Sharm el-Sheikh (SSH).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Effective 2024-12-23 through 2025-01-06
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-04-16 through 2025-04-23
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective from 2025-04-30
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-12-26 through 2025-01-09
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-11-14 through 2024-11-21
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-02-27 through 2025-03-27
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-04-03 through 2025-04-24
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective from 2025-05-01
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:50, non-stop
Boeing 737 (737)

Effective 2025-02-21 through 2025-03-28
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-04-04 through 2025-04-18
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective from 2025-04-25
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-04-11 through 2025-04-18
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective from 2025-04-25
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-12-20 through 2025-01-10
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-03-22 through 2025-03-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-09-14 through 2024-09-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-11-02 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-04-05 through 2025-04-19
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective from 2025-04-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-10-05 through 2024-10-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-01-18 through 2025-02-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Operates only on 2024-09-07
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-02-15 through 2025-03-15
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Operates only on 2025-01-11
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Valid until 2024-09-07
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, non-stop
Boeing 737 (737)

Operates only on 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-11-03 through 2024-11-17
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-11-24 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-10-06 through 2024-10-20
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Operates only on 2024-09-15
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Valid until 2024-09-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-09-22 through 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-12-22 through 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2024-12-22 through 2025-03-23
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective 2025-03-30 through 2025-04-20
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Effective from 2025-04-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:50, non-stop
Boeing 737 (737)

Indirekte Flüge:

Effective 2024-12-24 through 2025-01-07
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Operates only on 2024-10-30
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Operates only on 2024-11-06
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Valid until 2024-10-23
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Valid until 2024-09-12
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:10, 1-stop
Boeing 737 (737)

Effective 2025-01-16 through 2025-02-20
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Operates only on 2024-10-31
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Operates only on 2024-11-07
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Effective 2024-09-19 through 2024-10-24
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)

Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737 (737)
  • Eine internationale Strecke Abflug vom Verona, Italy (VRN) und Ankunft am Sharm el-Sheikh, Egypt (SSH).
  • Der Flug geht über eine Entfernung von 1760 Meilen oder 2832 Kilometer.
  • Die Zeitzone des Abflughafens ist UTC+1 , und die Zeitzone des Zielflughafens ist UTC+2 . Die aktuelle Zeit am Abflugort ist (loading...) und (loading...) am Zielort. Zwischen beiden Flughäfen besteht ein Zeitunterschied von (loading...) Stunden.
  • Bei Direktflügen kann die Flugzeit zwischen 2:50 und 3:50 betragen.