FLUGPLAN |
---|
Direkte Codeshareflüge: |
Mi
16:40
Tenerife-Norte (TFN)
19:55
Sevilla (SVQ) Iberia IB 5320 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-23 Codeshare flight, operated by Vueling.(VY 3251) |
Sa
07:00
Tenerife-Norte (TFN)
10:15
Sevilla (SVQ) Iberia IB 5322 Non-stop Airbus A320 (320) 2:15 Valid until 2024-09-07 Codeshare flight, operated by Vueling.(VY 3255) |
Mo
07:30
Tenerife-Norte (TFN)
10:45
Sevilla (SVQ) Iberia IB 5322 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-21 Codeshare flight, operated by Vueling.(VY 3255) |
Do
07:55
Tenerife-Norte (TFN)
11:10
Sevilla (SVQ) Iberia IB 5322 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-24 Codeshare flight, operated by Vueling.(VY 3255) |
Fr,So
08:50
Tenerife-Norte (TFN)
12:05
Sevilla (SVQ) Iberia IB 5322 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-25 Codeshare flight, operated by Vueling.(VY 3255) |
Di
09:20
Tenerife-Norte (TFN)
12:35
Sevilla (SVQ) Iberia IB 5322 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-22 Codeshare flight, operated by Vueling.(VY 3255) |
Mi
13:20
Tenerife-Norte (TFN)
16:30
Sevilla (SVQ) Iberia IB 5324 Non-stop Airbus A320 (320) 2:10 Valid until 2024-10-23 Codeshare flight, operated by Vueling.(VY 3257) |
Di,Do,So
14:15
Tenerife-Norte (TFN)
17:30
Sevilla (SVQ) Iberia IB 5324 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-24 Codeshare flight, operated by Vueling.(VY 3257) |
Sa
15:55
Tenerife-Norte (TFN)
19:10
Sevilla (SVQ) Iberia IB 5324 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-26 Codeshare flight, operated by Vueling.(VY 3257) |
Fr
16:05
Tenerife-Norte (TFN)
19:20
Sevilla (SVQ) Iberia IB 5324 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-25 Codeshare flight, operated by Vueling.(VY 3257) |
Mo
20:20
Tenerife-Norte (TFN)
23:35
Sevilla (SVQ) Iberia IB 5324 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-21 Codeshare flight, operated by Vueling.(VY 3257) |
Fr
08:00
Tenerife-Norte (TFN)
11:15
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-25 Codeshare flight, operated by Vueling.(VY 3259) |
Mo
13:25
Tenerife-Norte (TFN)
16:35
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:10 Valid until 2024-10-21 Codeshare flight, operated by Vueling.(VY 3259) |
Do
18:35
Tenerife-Norte (TFN)
21:50
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-24 Codeshare flight, operated by Vueling.(VY 3259) |
So
20:05
Tenerife-Norte (TFN)
23:20
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:15 Valid until 2024-10-20 Codeshare flight, operated by Vueling.(VY 3259) |
Sa
20:50
Tenerife-Norte (TFN)
00:05
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:15 Effective 2024-09-07 through 2024-09-28 Codeshare flight, operated by Vueling.(VY 3259) The flight arrives 1 day after departure. |
Di,Sa
21:10
Tenerife-Norte (TFN)
00:25
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:15 Valid until 2024-09-03 Codeshare flight, operated by Vueling.(VY 3259) The flight arrives 1 day after departure. |
Sa
21:10
Tenerife-Norte (TFN)
00:25
Sevilla (SVQ) Iberia IB 5326 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-05 through 2024-10-26 Codeshare flight, operated by Vueling.(VY 3259) The flight arrives 1 day after departure. |
Di-Sa
07:30
Tenerife-Norte (TFN)
10:45
Sevilla (SVQ) Iberia IB 5458 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-29 through 2025-03-29 Codeshare flight, operated by Vueling.(VY 3255) |
Mo
08:40
Tenerife-Norte (TFN)
11:55
Sevilla (SVQ) Iberia IB 5458 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-28 through 2025-03-24 Codeshare flight, operated by Vueling.(VY 3255) |
So
18:15
Tenerife-Norte (TFN)
21:30
Sevilla (SVQ) Iberia IB 5458 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-27 through 2025-03-23 Codeshare flight, operated by Vueling.(VY 3255) |
Mo,Fr
14:25
Tenerife-Norte (TFN)
17:40
Sevilla (SVQ) Iberia IB 5460 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-28 through 2025-03-28 Codeshare flight, operated by Vueling.(VY 3257) |
Di,Sa
15:10
Tenerife-Norte (TFN)
18:25
Sevilla (SVQ) Iberia IB 5460 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-29 through 2025-03-29 Codeshare flight, operated by Vueling.(VY 3257) |
So
11:20
Tenerife-Norte (TFN)
14:35
Sevilla (SVQ) Iberia IB 5462 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-27 through 2025-03-23 Codeshare flight, operated by Vueling.(VY 3259) |
Mi,Do
16:25
Tenerife-Norte (TFN)
19:40
Sevilla (SVQ) Iberia IB 5462 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-30 through 2025-03-27 Codeshare flight, operated by Vueling.(VY 3259) |
Mo,Di,Fr
20:20
Tenerife-Norte (TFN)
23:35
Sevilla (SVQ) Iberia IB 5462 Non-stop Airbus A320 (320) 2:15 Effective 2024-10-28 through 2025-03-28 Codeshare flight, operated by Vueling.(VY 3259) |