Austrian flüge ab Vienna (VIE) nach Amsterdam (AMS).

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mi,Do 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320neo (32N) 1:55 Effective 2024-11-06 through 2024-11-13
Mo 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A321 (321) 1:55 Operates only on 2024-11-11
Mo,Di,Do-So 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-11-14 through 2024-11-19
Mi,Do 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320neo (32N) 1:55 Effective 2024-11-20 through 2024-11-21
Täglich 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-11-22 through 2024-12-03
Mi 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320neo (32N) 1:55 Effective 2024-12-04 through 2024-12-18
Mo,Di,Do-So 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-12-05 through 2024-12-15
Mo 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A321 (321) 1:55 Operates only on 2024-12-16
Di,Do,Fr,So 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-12-17 through 2024-12-22
Mi 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Operates only on 2025-01-01
Mo-Mi,So 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2025-02-17 through 2025-02-26
Do 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320neo (32N) 1:55 Effective 2025-02-20 through 2025-02-27
Fr 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A321 (321) 1:55 Operates only on 2025-02-21
Mo-Fr,So 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2025-02-28 through 2025-03-21
So 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320neo (32N) 1:55 Operates only on 2025-03-23
Mo-Fr 14:50 Vienna (VIE) 3 16:45 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2025-03-24 through 2025-03-28
Mo,Di,Do-So 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Valid until 2024-09-03
Mo,Mi-So 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-09-04 through 2024-09-23
Di 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-09-10 through 2024-09-17
Di-So 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-09-24 through 2024-10-06
Mo 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Embraer EMB 195 (E95) 1:55 Operates only on 2024-09-30
Täglich 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective 2024-10-07 through 2024-10-26
Täglich 14:55 Vienna (VIE) 3 16:50 Amsterdam (AMS)
Austrian OS 373 Non-stop Airbus A320 (320) 1:55 Effective from 2025-03-30
Mo-Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Valid until 2024-09-05
Mo,Do-Sa 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-09-06 through 2024-09-14
Di,Mi,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-09-08 through 2024-09-11
Mo,Do,Sa,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-09-15 through 2024-09-21
Mo-Mi,Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-09-17 through 2024-09-25
Do-Sa 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-09-26 through 2024-10-05
Mo-Mi,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-09-29 through 2024-10-02
Do-So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-10-06 through 2024-10-12
Mo-Mi,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-10-07 through 2024-10-16
Do 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Operates only on 2024-10-17
Mo-Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-10-18 through 2024-10-27
Mo,Do,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-10-28 through 2024-11-07
Di,Mi,Fr 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-10-29 through 2024-11-20
So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A321 (321) 1:55 Effective 2024-11-10 through 2024-11-24
Mo,Do 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-11-11 through 2024-11-18
Di-Fr 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-11-21 through 2024-11-28
Mo 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-11-25 through 2024-12-16
Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A321 (321) 1:55 Effective 2024-11-29 through 2024-12-01
Di-Fr 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-12-03 through 2024-12-18
So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A321 (321) 1:55 Effective 2024-12-08 through 2024-12-22
Mo,Do 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2024-12-19 through 2025-01-13
Mi,Fr 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-12-20 through 2024-12-27
Mi,Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2024-12-29 through 2025-01-05
Di,Mi,Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2025-01-07 through 2025-01-15
Di-Fr,So 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Airbus A320 (320) 1:55 Effective 2025-01-16 through 2025-01-29
Mo 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2025-01-20 through 2025-01-27
Mo,Do 17:20 Vienna (VIE) 3 19:15 Amsterdam (AMS)
Austrian OS 375 Non-stop Embraer EMB 195 (E95) 1:55 Effective 2025-01-30 through 2025-02-03
prev   1 2 3   next


Austrian flüge ab Vienna (VIE) nach Amsterdam (AMS).
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Effective 2024-11-06 through 2024-11-13
Mo
-
Di
-
Mi
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320neo (32N)

Operates only on 2024-11-11
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A321 (321)

Effective 2024-11-14 through 2024-11-19
Mo
Di
Mi
-
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-11-20 through 2024-11-21
Mo
-
Di
-
Mi
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320neo (32N)

Effective 2024-11-22 through 2024-12-03
Mo
Di
Mi
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-12-04 through 2024-12-18
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320neo (32N)

Effective 2024-12-05 through 2024-12-15
Mo
Di
Mi
-
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Operates only on 2024-12-16
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A321 (321)

Effective 2024-12-17 through 2024-12-22
Mo
-
Di
Mi
-
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Operates only on 2025-01-01
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2025-02-17 through 2025-02-26
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2025-02-20 through 2025-02-27
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320neo (32N)

Operates only on 2025-02-21
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A321 (321)

Effective 2025-02-28 through 2025-03-21
Mo
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Operates only on 2025-03-23
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A320neo (32N)

Effective 2025-03-24 through 2025-03-28
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320 (320)

Valid until 2024-09-03
Mo
Di
Mi
-
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-09-04 through 2024-09-23
Mo
Di
-
Mi
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-09-10 through 2024-09-17
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-09-24 through 2024-10-06
Mo
-
Di
Mi
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Operates only on 2024-09-30
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-10-07 through 2024-10-26
Mo
Di
Mi
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective from 2025-03-30
Mo
Di
Mi
Do
Fr
Sa
So
Duration: 1:55, non-stop
Airbus A320 (320)

Valid until 2024-09-05
Mo
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-09-06 through 2024-09-14
Mo
Di
-
Mi
-
Do
Fr
Sa
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-09-08 through 2024-09-11
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-09-15 through 2024-09-21
Mo
Di
-
Mi
-
Do
Fr
-
Sa
So
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-09-17 through 2024-09-25
Mo
Di
Mi
Do
-
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-09-26 through 2024-10-05
Mo
-
Di
-
Mi
-
Do
Fr
Sa
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-09-29 through 2024-10-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-10-06 through 2024-10-12
Mo
-
Di
-
Mi
-
Do
Fr
Sa
So
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-10-07 through 2024-10-16
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Operates only on 2024-10-17
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-10-18 through 2024-10-27
Mo
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-10-28 through 2024-11-07
Mo
Di
-
Mi
-
Do
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-10-29 through 2024-11-20
Mo
-
Di
Mi
Do
-
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-11-10 through 2024-11-24
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A321 (321)

Effective 2024-11-11 through 2024-11-18
Mo
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-11-21 through 2024-11-28
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-11-25 through 2024-12-16
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-11-29 through 2024-12-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A321 (321)

Effective 2024-12-03 through 2024-12-18
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-12-08 through 2024-12-22
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Airbus A321 (321)

Effective 2024-12-19 through 2025-01-13
Mo
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2024-12-20 through 2024-12-27
Mo
-
Di
-
Mi
Do
-
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2024-12-29 through 2025-01-05
Mo
-
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2025-01-07 through 2025-01-15
Mo
-
Di
Mi
Do
-
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2025-01-16 through 2025-01-29
Mo
-
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Airbus A320 (320)

Effective 2025-01-20 through 2025-01-27
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)

Effective 2025-01-30 through 2025-02-03
Mo
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Embraer EMB 195 (E95)
prev        Page 2 / 3        next
  • Eine internationale Strecke Abflug vom Vienna, Austria (VIE) und Ankunft am Amsterdam, Netherlands (AMS).
  • Der Flug geht über eine Entfernung von 596 Meilen oder 959 Kilometer.
  • Der Abflug- und der Zielflughafen liegen in folgender/folgenden Zeitzone/n UTC+1 . Die aktuelle Zeit in beiden Flughäfen ist (loading...).
  • Die Flugzeit bei Direktflügen beträgt 1:55.