Volotea flug V7 3831: Asturias - Sevilla

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo 06:40 Asturias (OVD) 08:05 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-03-25
Sa 06:50 Asturias (OVD) 08:15 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-02-10 through 2024-03-16
Do 07:00 Asturias (OVD) 08:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Valid until 2024-01-04
Mo 07:00 Asturias (OVD) 08:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-01-08 through 2024-02-05
Sa 07:15 Asturias (OVD) 08:40 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Valid until 2024-01-06
So 07:30 Asturias (OVD) 08:55 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective from 2024-10-13
Sa 08:00 Asturias (OVD) 09:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-03-23 through 2024-05-25
Sa 08:00 Asturias (OVD) 09:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective from 2024-10-12
Mo 10:00 Asturias (OVD) 11:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-01-01
Mo 11:15 Asturias (OVD) 12:40 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-02-12 through 2024-03-18
So 11:25 Asturias (OVD) 12:50 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-03-24 through 2024-05-26
Sa 14:00 Asturias (OVD) 15:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-06-01 through 2024-06-29
Sa 14:00 Asturias (OVD) 15:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-07 through 2024-10-05
Do 14:35 Asturias (OVD) 16:00 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective from 2024-10-10
Fr 14:40 Asturias (OVD) 16:05 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-02-09 through 2024-03-15
Di 14:40 Asturias (OVD) 16:05 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-03-26
Mo 15:05 Asturias (OVD) 16:30 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-04-01 through 2024-05-27
Mo 15:05 Asturias (OVD) 16:30 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective from 2024-10-07
Di,Fr 15:10 Asturias (OVD) 16:35 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Valid until 2024-01-05
Fr 15:20 Asturias (OVD) 16:45 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-01-12 through 2024-02-02
Fr 15:30 Asturias (OVD) 16:55 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective from 2024-03-22
Di 15:45 Asturias (OVD) 17:10 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-06-04 through 2024-10-01
Mi 15:50 Asturias (OVD) 17:15 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-06-05 through 2024-10-02
Mo 16:15 Asturias (OVD) 17:40 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-06-03 through 2024-09-30
Mi 16:20 Asturias (OVD) 17:45 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Valid until 2024-01-03
So 16:20 Asturias (OVD) 17:45 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-06-02 through 2024-06-30
So 16:20 Asturias (OVD) 17:45 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-09-08 through 2024-10-06
So 16:45 Asturias (OVD) 18:10 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-07-07 through 2024-09-01
Do 17:05 Asturias (OVD) 18:30 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-06-06 through 2024-10-03
Do 18:45 Asturias (OVD) 20:10 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-03-21 through 2024-05-30
Do,So 18:55 Asturias (OVD) 20:20 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-01-11 through 2024-03-17
Di,Mi 19:00 Asturias (OVD) 20:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-03-27 through 2024-05-29
Di,Mi 19:00 Asturias (OVD) 20:25 Sevilla (SVQ)
V7 3831 Non-stop Airbus A319 (319) 1:25 Effective 2024-10-08 through 2024-10-30
So 19:15 Asturias (OVD) 20:40 Sevilla (SVQ)
V7 3831 Non-stop Airbus A320 (320) 1:25 Operates only on 2024-01-07
Volotea flug V7 3831:
Asturias - Sevilla
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Volotea V73831
Operates only on 2024-03-25
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-02-10 through 2024-03-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Valid until 2024-01-04
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-01-08 through 2024-02-05
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Valid until 2024-01-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective from 2024-10-13
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-03-23 through 2024-05-25
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective from 2024-10-12
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Operates only on 2024-01-01
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-02-12 through 2024-03-18
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-03-24 through 2024-05-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-06-01 through 2024-06-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-09-07 through 2024-10-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective from 2024-10-10
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-02-09 through 2024-03-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Operates only on 2024-03-26
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-04-01 through 2024-05-27
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective from 2024-10-07
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Valid until 2024-01-05
Mo
-
Di
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-01-12 through 2024-02-02
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective from 2024-03-22
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-06-04 through 2024-10-01
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-06-05 through 2024-10-02
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-06-03 through 2024-09-30
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Valid until 2024-01-03
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-06-02 through 2024-06-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-09-08 through 2024-10-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-07-07 through 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-06-06 through 2024-10-03
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-03-21 through 2024-05-30
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-01-11 through 2024-03-17
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-03-27 through 2024-05-29
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Effective 2024-10-08 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:25, non-stop
Airbus A319 (319)

Volotea V73831
Operates only on 2024-01-07
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Airbus A320 (320)
  • V7 3831 ist ein Inlandsflug Abflug vom Asturias (OVD) und Ankunft am Sevilla (SVQ).
  • Der Flug geht über eine Entfernung von 424 Meilen oder 683 Kilometer.
  • Der Abflug- und der Zielflughafen liegen in folgender/folgenden Zeitzone/n UTC+1 . Die aktuelle Zeit in beiden Flughäfen ist (loading...).
  • Die Flugzeit bei Direktflügen beträgt 1:25.