FLUGPLAN |
---|
Direkte Codeshareflüge: |
Sa
13:30
San Jose del Cabo (SJD) 2
20:23
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:53 Effective 2024-10-12 through 2024-11-02 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Täglich
13:40
San Jose del Cabo (SJD) 2
20:32
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:52 Effective 2025-04-14 through 2025-05-06 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sa
13:54
San Jose del Cabo (SJD) 2
20:46
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:52 Effective 2025-05-10 through 2025-06-07 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sa
13:54
San Jose del Cabo (SJD) 2
21:01
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 4:07 Effective from 2025-06-14 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Täglich
14:05
San Jose del Cabo (SJD) 2
21:00
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:55 Effective 2025-03-09 through 2025-04-13 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sa
14:17
San Jose del Cabo (SJD) 2
20:17
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 4:00 Effective 2024-12-07 through 2024-12-14 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sa
14:30
San Jose del Cabo (SJD) 2
20:23
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:53 Operates only on 2024-11-09 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Sa
14:45
San Jose del Cabo (SJD) 2
20:30
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:45 Effective 2024-11-16 through 2024-11-30 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Täglich
15:05
San Jose del Cabo (SJD) 2
21:00
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:55 Effective 2024-12-19 through 2025-01-05 Codeshare flight, operated by Delta Air Lines.(DL 1828) |
Täglich
15:11
San Jose del Cabo (SJD) 2
20:58
Atlanta (ATL) I VS 2981 Non-stop Boeing 737-900 (739) 3:47 Effective 2025-01-06 through 2025-03-08 Codeshare flight, operated by Delta Air Lines.(DL 1828) |