FLUGPLAN |
---|
Direkte Codeshareflüge: |
Mo-Fr,So
12:28
Allentown (ABE)
14:43
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:15 Effective 2024-03-10 through 2024-04-08 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Di-So
12:31
Allentown (ABE)
14:50
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:19 Effective 2024-01-02 through 2024-01-07 Codeshare flight, operated by Delta Air Lines.(DL 5489) |
Mo,Do,Fr
12:35
Allentown (ABE)
14:54
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:19 Effective 2024-01-08 through 2024-01-15 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Mo-Fr,So
12:35
Allentown (ABE)
14:54
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:19 Effective 2024-01-16 through 2024-02-05 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Do,Fr
12:35
Allentown (ABE)
14:54
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:19 Effective 2024-02-08 through 2024-02-16 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Mo,Do,Fr,So
12:35
Allentown (ABE)
14:54
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:19 Effective 2024-02-19 through 2024-02-26 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Do
12:35
Allentown (ABE)
14:54
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:19 Effective 2024-02-29 through 2024-03-07 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Mo,Fr,So
12:35
Allentown (ABE)
14:54
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:19 Effective 2024-03-01 through 2024-03-08 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Mo-Fr,So
13:00
Allentown (ABE)
15:12
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:12 Effective 2024-04-09 through 2024-06-06 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Di,Mi,So
14:00
Allentown (ABE)
16:20
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:20 Effective 2024-01-09 through 2024-01-14 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Sa
14:00
Allentown (ABE)
16:20
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:20 Effective 2024-01-13 through 2024-01-27 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Di,Mi,Sa
14:00
Allentown (ABE)
16:20
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:20 Effective 2024-02-03 through 2024-02-10 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Mo-Mi,Sa,So
14:00
Allentown (ABE)
16:20
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:20 Effective 2024-02-11 through 2024-02-17 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
So
14:00
Allentown (ABE)
16:20
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:20 Operates only on 2024-02-18 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Di,Mi,Sa
14:00
Allentown (ABE)
16:20
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 700 (CR7) 2:20 Effective 2024-02-20 through 2024-03-09 Codeshare flight, operated by Delta Air Lines.(DL 5241) |
Sa
14:00
Allentown (ABE)
16:15
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:15 Effective 2024-03-16 through 2024-04-06 Codeshare flight, operated by Delta Air Lines.(DL 5246) |
Sa
14:50
Allentown (ABE)
17:02
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:12 Effective 2024-04-13 through 2024-06-01 Codeshare flight, operated by Delta Air Lines.(DL 4914) |
Täglich
17:50
Allentown (ABE)
20:08
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:18 Effective from 2024-09-09 Codeshare flight, operated by Delta Air Lines.(DL 5246) |
Täglich
18:00
Allentown (ABE)
20:10
Atlanta (ATL) S VS 2283 Non-stop Canadair CRJ 900 (CR9) 2:10 Effective 2024-06-07 through 2024-09-08 Codeshare flight, operated by Delta Air Lines.(DL 5246) |