Southwest Airlines flug WN 777: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Sa 05:55 Sacramento (SMF) B 07:30 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-23 through 2024-11-30
Sa 05:55 Sacramento (SMF) B 07:30 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-12-21 through 2025-01-04
So 06:00 Denver (DEN) 06:55 Las Vegas Harry Reid (LAS) 1
WN 777 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-06 through 2024-10-27
Do,Fr,So 06:20 Sacramento (SMF) B 07:55 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 06:20 Sacramento (SMF) B 07:55 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-11 through 2024-11-25
Fr,So 06:20 Sacramento (SMF) B 07:55 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-12-08 through 2024-12-15
Do 06:20 Sacramento (SMF) B 07:55 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2024-12-19
Fr 06:20 Sacramento (SMF) B 07:55 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2025-01-03
Do,Fr,So 06:40 Sacramento (SMF) B 08:15 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-01-12 through 2025-01-17
Mo,So 06:40 Sacramento (SMF) B 08:15 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 06:40 Sacramento (SMF) B 08:15 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-02-02 through 2025-02-07
Mo 06:40 Sacramento (SMF) B 08:15 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2025-02-10
Mo,Di,Do 06:40 Sacramento (SMF) B 08:15 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-02-18 through 2025-02-24
Mo 06:40 Sacramento (SMF) B 08:15 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2025-03-03
So 07:30 Las Vegas Harry Reid (LAS) 1 08:40 Long Beach (LGB)
WN 777 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-10-06 through 2024-10-27
Sa 07:35 Denver (DEN) 11:00 Midway, Chicago (MDW)
WN 777 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-05 through 2024-11-02
Do 07:35 Denver (DEN) 11:00 Midway, Chicago (MDW)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-10-31
Sa 07:40 Louisville (SDF) 07:55 Midway, Chicago (MDW)
WN 777 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2024-09-28
Di,Mi 07:50 Denver (DEN) 11:15 Midway, Chicago (MDW)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-10-08 through 2024-10-30
Mo-Mi 07:50 Sacramento (SMF) B 09:25 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-04 through 2024-11-06
Di,Mi 07:50 Sacramento (SMF) B 09:25 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-12 through 2024-11-20
Di-Fr 07:50 Sacramento (SMF) B 09:25 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-29 through 2024-12-06
Mo-Do 07:50 Sacramento (SMF) B 09:25 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-12-09 through 2024-12-18
Di,Mi 07:50 Sacramento (SMF) B 09:25 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-12-24 through 2025-01-01
Mo 07:50 Sacramento (SMF) B 09:25 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2025-01-06
Sa 08:20 Portland (PDX) 11:45 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-23 through 2024-11-30
Sa 08:20 Portland (PDX) 11:45 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-21 through 2025-01-04
Do,Fr,So 09:00 Portland (PDX) 12:25 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-01-12 through 2025-01-17
Mo,So 09:00 Portland (PDX) 12:25 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 09:00 Portland (PDX) 12:25 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-02-02 through 2025-02-07
Mo 09:00 Portland (PDX) 12:25 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-02-10
Mo,Di,Do 09:00 Portland (PDX) 12:25 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-02-18 through 2025-02-24
Mo 09:00 Portland (PDX) 12:25 Denver (DEN)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-03-03
Mo-Fr 09:30 Sacramento (SMF) B 11:05 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-01-07 through 2025-01-15
Di-Fr,So 09:30 Sacramento (SMF) B 11:05 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-01-19 through 2025-01-24
Mo-Fr 09:30 Sacramento (SMF) B 11:05 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-01-27 through 2025-02-05
Di,Mi,So 09:30 Sacramento (SMF) B 11:05 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-02-09 through 2025-02-12
Di,Mi 09:30 Sacramento (SMF) B 11:05 Portland (PDX)
WN 777 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-02-19 through 2025-03-05
Mo,Fr 09:45 Las Vegas Harry Reid (LAS) 1 14:30 San Antonio (SAT) A
WN 777 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-10-28 through 2024-11-01
Mo,Do,Fr 09:50 Las Vegas Harry Reid (LAS) 1 14:35 San Antonio (SAT) A
WN 777 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-10-03 through 2024-10-25
Mo,Do,Fr 10:15 Denver (DEN) 13:25 Austin (AUS)
WN 777 Non-stop Boeing 737-800 (73H) 2:10 Valid until 2024-09-30
Di,Mi 10:40 Denver (DEN) 13:45 Austin (AUS)
WN 777 Non-stop Boeing 737-700 (73W) 2:05 Valid until 2024-10-02
So 10:50 Denver (DEN) 13:55 Austin (AUS)
WN 777 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-09-01
Mo,Do,Fr,So 11:20 Sacramento (SMF) B 12:55 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-02-13 through 2025-02-17
Do,Fr,So 11:20 Sacramento (SMF) B 12:55 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-02-21 through 2025-03-02
So 12:10 Denver (DEN) 15:15 Austin (AUS)
WN 777 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-09-08 through 2024-09-29
Sa 13:00 Phoenix Sky Harbor (PHX) 4 13:15 San Diego (SAN) 1
WN 777 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-09 through 2024-11-16
Sa 13:00 Phoenix Sky Harbor (PHX) 4 13:15 San Diego (SAN) 1
WN 777 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-07 through 2024-12-14
Sa 13:55 San Diego (SAN) 1 15:35 Sacramento (SMF) B
WN 777 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-11-09 through 2024-11-16
Sa 13:55 San Diego (SAN) 1 15:35 Sacramento (SMF) B
WN 777 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-12-07 through 2024-12-14
Mo,Fr 15:05 San Antonio (SAT) A 16:15 Love Field, Dallas (DAL) 1
WN 777 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-10-28 through 2024-11-01
Mo,Do,Fr 15:10 San Antonio (SAT) A 16:20 Love Field, Dallas (DAL) 1
WN 777 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-10-03 through 2024-10-25
Sa 16:10 Sacramento (SMF) B 17:45 Portland (PDX)
WN 777 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-09 through 2024-11-16
Sa 16:10 Sacramento (SMF) B 17:45 Portland (PDX)
WN 777 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-07 through 2024-12-14
Mo,Do,Fr 17:00 Love Field, Dallas (DAL) 1 20:25 Charlotte (CLT)
WN 777 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-10-03 through 2024-10-25
Mo-Mi 18:00 Sacramento (SMF) B 19:35 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-26 through 2024-12-02
Mo,Do,Fr,So 18:00 Sacramento (SMF) B 19:35 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-12-20 through 2025-01-02
So 18:00 Sacramento (SMF) B 19:35 Portland (PDX)
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2025-01-05
Sa 20:25 Denver (DEN) 21:30 Las Vegas Harry Reid (LAS) 1
WN 777 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2025-02-15 through 2025-03-01
Indirekte Flüge:
Sa 05:55 Sacramento (SMF) B 11:45 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:50 Effective 2024-11-23 through 2024-11-30
Sa 05:55 Sacramento (SMF) B 11:45 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:50 Effective 2024-12-21 through 2025-01-04
So 06:00 Denver (DEN) 08:40 Long Beach (LGB)
WN 777 1-stop Boeing 737-700 (73W) 3:40 Effective 2024-10-06 through 2024-10-27
Do,Fr,So 06:40 Sacramento (SMF) B 12:25 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-01-12 through 2025-01-17
Mo,So 06:40 Sacramento (SMF) B 12:25 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 06:40 Sacramento (SMF) B 12:25 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-02-02 through 2025-02-07
Mo 06:40 Sacramento (SMF) B 12:25 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:45 Operates only on 2025-02-10
Mo,Di,Do 06:40 Sacramento (SMF) B 12:25 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-02-18 through 2025-02-24
Mo 06:40 Sacramento (SMF) B 12:25 Denver (DEN)
WN 777 1-stop Boeing 737 MAX 8 (7M8) 4:45 Operates only on 2025-03-03
Mo,Fr 09:45 Las Vegas Harry Reid (LAS) 1 16:15 Love Field, Dallas (DAL) 1
WN 777 1-stop Boeing 737-700 (73W) 4:30 Effective 2024-10-28 through 2024-11-01
Mo,Do,Fr 09:50 Las Vegas Harry Reid (LAS) 1 16:20 Love Field, Dallas (DAL) 1
WN 777 1-stop Boeing 737-700 (73W) 4:30 Effective 2024-10-03 through 2024-10-25
Sa 13:00 Phoenix Sky Harbor (PHX) 4 15:35 Sacramento (SMF) B
WN 777 1-stop Boeing 737-700 (73W) 3:35 Effective 2024-11-09 through 2024-11-16
Sa 13:00 Phoenix Sky Harbor (PHX) 4 15:35 Sacramento (SMF) B
WN 777 1-stop Boeing 737-700 (73W) 3:35 Effective 2024-12-07 through 2024-12-14
Sa 13:55 San Diego (SAN) 1 17:45 Portland (PDX)
WN 777 1-stop Boeing 737-700 (73W) 3:50 Effective 2024-11-09 through 2024-11-16
Sa 13:55 San Diego (SAN) 1 17:45 Portland (PDX)
WN 777 1-stop Boeing 737-700 (73W) 3:50 Effective 2024-12-07 through 2024-12-14
Mo,Do,Fr 15:10 San Antonio (SAT) A 20:25 Charlotte (CLT)
WN 777 1-stop Boeing 737-700 (73W) 4:15 Effective 2024-10-03 through 2024-10-25
Mo,Do,Fr 09:50 Las Vegas Harry Reid (LAS) 1 20:25 Charlotte (CLT)
WN 777 2-stop Boeing 737-700 (73W) 7:35 Effective 2024-10-03 through 2024-10-25
Sa 13:00 Phoenix Sky Harbor (PHX) 4 17:45 Portland (PDX)
WN 777 2-stop Boeing 737-700 (73W) 5:45 Effective 2024-11-09 through 2024-11-16
Sa 13:00 Phoenix Sky Harbor (PHX) 4 17:45 Portland (PDX)
WN 777 2-stop Boeing 737-700 (73W) 5:45 Effective 2024-12-07 through 2024-12-14
This flight number is listed as serving the following routes:
Southwest Airlines flug WN 777: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Southwest Airlines WN777
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-05 through 2024-11-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Operates only on 2024-10-31
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Valid until 2024-09-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-08 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-11-04 through 2024-11-06
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-11-12 through 2024-11-20
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-11-29 through 2024-12-06
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-12-09 through 2024-12-18
Mo
Di
Mi
Do
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-12-24 through 2025-01-01
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Operates only on 2025-01-06
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-01-07 through 2025-01-15
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2025-01-19 through 2025-01-24
Mo
-
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2025-01-27 through 2025-02-05
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2025-02-09 through 2025-02-12
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2025-02-19 through 2025-03-05
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-10-28 through 2024-11-01
Mo
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-03 through 2024-10-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Valid until 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Valid until 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2025-02-13 through 2025-02-17
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-21 through 2025-03-02
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-09-08 through 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN777
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-28 through 2024-11-01
Mo
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-03 through 2024-10-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-03 through 2024-10-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-26 through 2024-12-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-12-20 through 2025-01-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-15 through 2025-03-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Indirekte Flüge:

Southwest Airlines WN777
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:50, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:50, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN777
Effective 2024-10-28 through 2024-11-01
Mo
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-03 through 2024-10-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-03 through 2024-10-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 4:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-10-03 through 2024-10-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 7:35, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 5:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN777
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 5:45, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Austin (AUS)
  • Denver (DEN) - Las Vegas Harry Reid (LAS)
  • Denver (DEN) - Long Beach (LGB)
  • Denver (DEN) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Charlotte (CLT)
  • Las Vegas Harry Reid (LAS) - Long Beach (LGB)
  • Las Vegas Harry Reid (LAS) - Love Field, Dallas (DAL)
  • Las Vegas Harry Reid (LAS) - San Antonio (SAT)
  • Louisville (SDF) - Midway, Chicago (MDW)
  • Love Field, Dallas (DAL) - Charlotte (CLT)
  • Phoenix Sky Harbor (PHX) - Portland (PDX)
  • Phoenix Sky Harbor (PHX) - Sacramento (SMF)
  • Phoenix Sky Harbor (PHX) - San Diego (SAN)
  • Portland (PDX) - Denver (DEN)
  • Sacramento (SMF) - Denver (DEN)
  • Sacramento (SMF) - Portland (PDX)
  • San Antonio (SAT) - Charlotte (CLT)
  • San Antonio (SAT) - Love Field, Dallas (DAL)
  • San Diego (SAN) - Portland (PDX)
  • San Diego (SAN) - Sacramento (SMF)