Southwest Airlines flug WN 4168: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo,Do,Fr 09:55 Las Vegas Harry Reid (LAS) 1 13:15 Kona (KOA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 6:20 Effective 2024-10-03 through 2024-10-28
Fr 09:55 Las Vegas Harry Reid (LAS) 1 13:15 Kona (KOA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 6:20 Operates only on 2024-11-01
Di,Mi,Sa,So 10:00 Las Vegas Harry Reid (LAS) 1 13:20 Kona (KOA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 6:20 Effective 2024-10-05 through 2024-10-30
Do,Sa 10:00 Las Vegas Harry Reid (LAS) 1 13:20 Kona (KOA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 6:20 Effective 2024-10-31 through 2024-11-02
Mo,Do,Fr,So 12:50 Burbank (BUR) 15:35 Albuquerque (ABQ)
WN 4168 Non-stop Boeing 737-700 (73W) 1:45 Effective 2025-02-13 through 2025-02-17
Do,Fr,So 12:50 Burbank (BUR) 15:35 Albuquerque (ABQ)
WN 4168 Non-stop Boeing 737-700 (73W) 1:45 Effective 2025-02-21 through 2025-03-02
So 14:35 Denver (DEN) 18:00 Nashville (BNA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-12-01
Sa 14:50 Fresno (FAT) 18:05 Denver (DEN)
WN 4168 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-11-23 through 2024-11-30
Sa 14:50 Fresno (FAT) 18:05 Denver (DEN)
WN 4168 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-12-21 through 2025-01-04
Mo,Do,Fr 16:10 Baltimore (BWI) 18:35 Orlando (MCO)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Valid until 2024-09-30
Sa 18:05 Charleston (CHS) 20:00 Love Field, Dallas (DAL) 1
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-02-15 through 2025-03-01
So 18:15 San Diego (SAN) 1 19:40 Tucson (TUS)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-09-01
Sa 18:45 Denver (DEN) 22:10 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-11-23 through 2024-11-30
Sa 18:45 Denver (DEN) 22:10 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-12-21 through 2025-01-04
Do,Fr,So 20:30 Denver (DEN) 23:55 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 20:30 Denver (DEN) 23:55 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-11-11 through 2024-11-25
Fr,So 20:30 Denver (DEN) 23:55 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-12-08 through 2024-12-15
Do 20:30 Denver (DEN) 23:55 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-12-19
Fr 20:30 Denver (DEN) 23:55 Nashville (BNA)
WN 4168 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2025-01-03
Mo-Mi 20:40 Denver (DEN) 00:05 Nashville (BNA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-26 through 2024-12-02
The flight arrives 1 day after departure.
Mo,Do,Fr,So 20:40 Denver (DEN) 00:05 Nashville (BNA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-20 through 2025-01-02
The flight arrives 1 day after departure.
So 20:40 Denver (DEN) 00:05 Nashville (BNA)
WN 4168 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-05
The flight arrives 1 day after departure.
Indirekte Flüge:
Sa 14:50 Fresno (FAT) 22:10 Nashville (BNA)
WN 4168 1-stop Boeing 737-700 (73W) 5:20 Effective 2024-11-23 through 2024-11-30
Sa 14:50 Fresno (FAT) 22:10 Nashville (BNA)
WN 4168 1-stop Boeing 737-700 (73W) 5:20 Effective 2024-12-21 through 2025-01-04
This flight number is listed as serving the following routes:
Southwest Airlines flug WN 4168: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Southwest Airlines WN4168
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 6:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 6:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Effective 2024-10-05 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
So
Duration: 6:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Effective 2024-10-31 through 2024-11-02
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
So
-
Duration: 6:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Effective 2025-02-13 through 2025-02-17
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2025-02-21 through 2025-03-02
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Operates only on 2024-12-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Valid until 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Effective 2025-02-15 through 2025-03-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4168
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
20:40

00:05(+1)
Effective 2024-11-26 through 2024-12-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN4168
20:40

00:05(+1)
Effective 2024-12-20 through 2025-01-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN4168
20:40

00:05(+1)
Operates only on 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Indirekte Flüge:

Southwest Airlines WN4168
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN4168
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - Orlando (MCO)
  • Burbank (BUR) - Albuquerque (ABQ)
  • Charleston (CHS) - Love Field, Dallas (DAL)
  • Denver (DEN) - Nashville (BNA)
  • Fresno (FAT) - Denver (DEN)
  • Fresno (FAT) - Nashville (BNA)
  • Las Vegas Harry Reid (LAS) - Kona (KOA)
  • San Diego (SAN) - Tucson (TUS)