Southwest Airlines flug WN 3236: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo,Do,Fr,So 06:05 Atlanta (ATL) N 07:30 Tampa (TPA)
WN 3236 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-13 through 2025-02-17
Do,Fr,So 06:05 Atlanta (ATL) N 07:30 Tampa (TPA)
WN 3236 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-21 through 2025-03-02
Mo,Do,Fr 09:15 Love Field, Dallas (DAL) 1 10:25 San Diego (SAN) 1
WN 3236 Non-stop Boeing 737-700 (73W) 3:10 Effective 2024-10-03 through 2024-10-28
Fr 09:15 Love Field, Dallas (DAL) 1 10:25 San Diego (SAN) 1
WN 3236 Non-stop Boeing 737-700 (73W) 3:10 Operates only on 2024-11-01
Do 09:15 Phoenix Sky Harbor (PHX) 4 10:55 Salt Lake City (SLC)
WN 3236 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2024-11-28
Sa 11:00 Saint Louis (STL) 2 12:15 Phoenix Sky Harbor (PHX) 4
WN 3236 Non-stop Boeing 737-700 (73W) 3:15 Valid until 2024-09-28
Mo,Do,Fr 11:05 San Diego (SAN) 1 12:30 Tucson (TUS)
WN 3236 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-03 through 2024-10-28
Fr 11:05 San Diego (SAN) 1 12:30 Tucson (TUS)
WN 3236 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-11-01
Mo,Do,Fr 12:35 Atlanta (ATL) N 14:05 Orlando (MCO)
WN 3236 Non-stop Boeing 737-800 (73H) 1:30 Valid until 2024-09-30
Mo,Do,Fr 13:05 Tucson (TUS) 16:00 Denver (DEN)
WN 3236 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-03 through 2024-10-28
Fr 13:05 Tucson (TUS) 16:00 Denver (DEN)
WN 3236 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-11-01
Di,Mi 14:25 Atlanta (ATL) N 15:55 Orlando (MCO)
WN 3236 Non-stop Boeing 737-800 (73H) 1:30 Valid until 2024-10-01
Mi 14:25 Atlanta (ATL) N 15:55 Orlando (MCO)
WN 3236 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-10-02
Do,Fr,So 14:50 Rochester (ROC) 17:50 Orlando (MCO)
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2025-01-12 through 2025-01-17
Mo,So 14:50 Rochester (ROC) 17:50 Orlando (MCO)
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 14:50 Rochester (ROC) 17:50 Orlando (MCO)
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2025-02-02 through 2025-02-07
Mo 14:50 Rochester (ROC) 17:50 Orlando (MCO)
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2025-02-10
Mo,Di,Do 14:50 Rochester (ROC) 17:50 Orlando (MCO)
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2025-02-18 through 2025-02-24
Mo 14:50 Rochester (ROC) 17:50 Orlando (MCO)
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2025-03-03
So 18:45 Minneapolis/Saint Paul (MSP) 2 19:55 Denver (DEN)
WN 3236 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-09-01
Do,Fr,So 19:25 Denver (DEN) 22:20 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 19:25 Denver (DEN) 22:20 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-11 through 2024-11-25
Fr,So 19:25 Denver (DEN) 22:20 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-12-08 through 2024-12-15
Do 19:25 Denver (DEN) 22:20 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-12-19
Fr 19:25 Denver (DEN) 22:20 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2025-01-03
So 20:45 Denver (DEN) 23:40 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2024-12-01
So 20:50 Minneapolis/Saint Paul (MSP) 2 22:00 Denver (DEN)
WN 3236 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-09-08 through 2024-09-29
Mo-Mi 20:50 Denver (DEN) 23:45 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-11-26 through 2024-12-02
Mo,Do,Fr,So 20:50 Denver (DEN) 23:45 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-12-20 through 2025-01-02
So 20:50 Denver (DEN) 23:45 Minneapolis/Saint Paul (MSP) 2
WN 3236 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2025-01-05
So 22:30 Phoenix Sky Harbor (PHX) 4 00:25 Sacramento (SMF) B
WN 3236 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-06 through 2024-10-27
The flight arrives 1 day after departure.
Indirekte Flüge:
Mo,Do,Fr 09:15 Love Field, Dallas (DAL) 1 12:30 Tucson (TUS)
WN 3236 1-stop Boeing 737-700 (73W) 5:15 Effective 2024-10-03 through 2024-10-28
Fr 09:15 Love Field, Dallas (DAL) 1 12:30 Tucson (TUS)
WN 3236 1-stop Boeing 737-700 (73W) 5:15 Operates only on 2024-11-01
Mo,Do,Fr 11:05 San Diego (SAN) 1 16:00 Denver (DEN)
WN 3236 1-stop Boeing 737-700 (73W) 3:55 Effective 2024-10-03 through 2024-10-28
Fr 11:05 San Diego (SAN) 1 16:00 Denver (DEN)
WN 3236 1-stop Boeing 737-700 (73W) 3:55 Operates only on 2024-11-01
Mo,Do,Fr 09:15 Love Field, Dallas (DAL) 1 16:00 Denver (DEN)
WN 3236 2-stop Boeing 737-700 (73W) 7:45 Effective 2024-10-03 through 2024-10-28
Fr 09:15 Love Field, Dallas (DAL) 1 16:00 Denver (DEN)
WN 3236 2-stop Boeing 737-700 (73W) 7:45 Operates only on 2024-11-01
This flight number is listed as serving the following routes:
Southwest Airlines flug WN 3236: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Southwest Airlines WN3236
06:05

07:30
Effective 2025-02-13 through 2025-02-17
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
06:05

07:30
Effective 2025-02-21 through 2025-03-02
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 3:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Valid until 2024-09-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Valid until 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Valid until 2024-10-01
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Operates only on 2024-10-02
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Operates only on 2024-12-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Effective 2024-09-08 through 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3236
Effective 2024-11-26 through 2024-12-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Effective 2024-12-20 through 2025-01-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Operates only on 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3236
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Indirekte Flüge:

Southwest Airlines WN3236
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Effective 2024-10-03 through 2024-10-28
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 7:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN3236
Operates only on 2024-11-01
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 7:45, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Atlanta (ATL) - Orlando (MCO)
  • Atlanta (ATL) - Tampa (TPA)
  • Denver (DEN) - Minneapolis/Saint Paul (MSP)
  • Love Field, Dallas (DAL) - Denver (DEN)
  • Love Field, Dallas (DAL) - San Diego (SAN)
  • Love Field, Dallas (DAL) - Tucson (TUS)
  • Phoenix Sky Harbor (PHX) - Sacramento (SMF)
  • Phoenix Sky Harbor (PHX) - Salt Lake City (SLC)
  • Rochester (ROC) - Orlando (MCO)
  • Saint Louis (STL) - Phoenix Sky Harbor (PHX)
  • San Diego (SAN) - Denver (DEN)
  • San Diego (SAN) - Tucson (TUS)
  • Tucson (TUS) - Denver (DEN)