Southwest Airlines flug WN 2879: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo,Do,Fr,So 06:00 Ronald Reagan Washington (DCA) 08:45 Houston Hobby (HOU)
WN 2879 Non-stop Boeing 737 MAX 8 (7M8) 3:45 Effective 2025-02-13 through 2025-02-17
Do,Fr,So 06:00 Ronald Reagan Washington (DCA) 08:45 Houston Hobby (HOU)
WN 2879 Non-stop Boeing 737 MAX 8 (7M8) 3:45 Effective 2025-02-21 through 2025-03-02
Mo,Do,Fr,So 06:30 San Diego (SAN) 1 08:05 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-07 through 2024-11-25
Fr,So 06:30 San Diego (SAN) 1 08:05 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-08 through 2024-12-15
Do 06:30 San Diego (SAN) 1 08:05 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2024-12-19
Fr 06:30 San Diego (SAN) 1 08:05 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2025-01-03
Sa 06:35 San Diego (SAN) 1 08:10 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-23 through 2024-11-30
Sa 06:35 San Diego (SAN) 1 08:10 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-21 through 2025-01-04
Mo-Mi 06:45 Tucson (TUS) 07:05 San Diego (SAN) 1
WN 2879 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-26 through 2024-12-02
Mo,Do,Fr,So 06:45 Tucson (TUS) 07:05 San Diego (SAN) 1
WN 2879 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-20 through 2025-01-02
So 06:45 Tucson (TUS) 07:05 San Diego (SAN) 1
WN 2879 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-05
Mo-Mi 07:50 San Diego (SAN) 1 09:20 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-11-26 through 2024-12-02
Mo,Do,Fr,So 07:50 San Diego (SAN) 1 09:20 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-12-20 through 2025-01-02
So 07:50 San Diego (SAN) 1 09:20 San Jose (SJC) B
WN 2879 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2025-01-05
So 09:10 Baltimore (BWI) 11:30 Love Field, Dallas (DAL) 1
WN 2879 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-10-06 through 2024-10-27
So 12:10 Love Field, Dallas (DAL) 1 12:55 El Paso (ELP)
WN 2879 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-06 through 2024-10-27
Sa 12:50 San Jose (SJC) B 14:15 San Diego (SAN) 1
WN 2879 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-11 through 2025-02-08
Di,Mi 13:40 Love Field, Dallas (DAL) 1 14:25 El Paso (ELP)
WN 2879 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-10-08 through 2024-10-30
So 14:50 Love Field, Dallas (DAL) 1 17:00 Midway, Chicago (MDW)
WN 2879 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-09-08 through 2024-09-29
Sa 15:40 Love Field, Dallas (DAL) 1 16:25 El Paso (ELP)
WN 2879 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-10-05 through 2024-11-02
So 16:55 Love Field, Dallas (DAL) 1 19:05 Midway, Chicago (MDW)
WN 2879 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-09-01
Sa 17:00 Minneapolis/Saint Paul (MSP) 2 18:15 Phoenix Sky Harbor (PHX) 4
WN 2879 Non-stop Boeing 737-800 (73H) 3:15 Valid until 2024-09-28
Indirekte Flüge:
Mo-Mi 06:45 Tucson (TUS) 09:20 San Jose (SJC) B
WN 2879 1-stop Boeing 737-800 (73H) 3:35 Effective 2024-11-26 through 2024-12-02
Mo,Do,Fr,So 06:45 Tucson (TUS) 09:20 San Jose (SJC) B
WN 2879 1-stop Boeing 737-800 (73H) 3:35 Effective 2024-12-20 through 2025-01-02
So 06:45 Tucson (TUS) 09:20 San Jose (SJC) B
WN 2879 1-stop Boeing 737-800 (73H) 3:35 Operates only on 2025-01-05
So 09:10 Baltimore (BWI) 12:55 El Paso (ELP)
WN 2879 1-stop Boeing 737-700 (73W) 5:45 Effective 2024-10-06 through 2024-10-27
This flight number is listed as serving the following routes:
Southwest Airlines flug WN 2879: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Southwest Airlines WN2879
Effective 2025-02-13 through 2025-02-17
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2879
Effective 2025-02-21 through 2025-03-02
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2879
Effective 2024-11-07 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2024-11-26 through 2024-12-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-12-20 through 2025-01-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Operates only on 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-11-26 through 2024-12-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-12-20 through 2025-01-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Operates only on 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2025-01-11 through 2025-02-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2879
Effective 2024-10-08 through 2024-10-30
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-09-08 through 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-10-05 through 2024-11-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2879
Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Valid until 2024-09-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Indirekte Flüge:

Southwest Airlines WN2879
Effective 2024-11-26 through 2024-12-02
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-12-20 through 2025-01-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:35, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Operates only on 2025-01-05
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:35, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2879
Effective 2024-10-06 through 2024-10-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 5:45, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - El Paso (ELP)
  • Baltimore (BWI) - Love Field, Dallas (DAL)
  • Love Field, Dallas (DAL) - El Paso (ELP)
  • Love Field, Dallas (DAL) - Midway, Chicago (MDW)
  • Minneapolis/Saint Paul (MSP) - Phoenix Sky Harbor (PHX)
  • Ronald Reagan Washington (DCA) - Houston Hobby (HOU)
  • San Jose (SJC) - San Diego (SAN)
  • Tucson (TUS) - San Diego (SAN)
  • Tucson (TUS) - San Jose (SJC)