Southwest Airlines flug WN 2756: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Do 07:45 Love Field, Dallas (DAL) 1 08:50 Denver (DEN)
WN 2756 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-11-28
Do,Fr,So 09:30 San Jose (SJC) B 11:00 Las Vegas Harry Reid (LAS) 1
WN 2756 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 09:30 San Jose (SJC) B 11:00 Las Vegas Harry Reid (LAS) 1
WN 2756 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-11-11 through 2024-11-25
Do 09:30 Denver (DEN) 13:55 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-11-28
Fr,So 09:30 San Jose (SJC) B 11:00 Las Vegas Harry Reid (LAS) 1
WN 2756 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-12-08 through 2024-12-15
Do 09:30 San Jose (SJC) B 11:00 Las Vegas Harry Reid (LAS) 1
WN 2756 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-12-19
Fr 09:30 San Jose (SJC) B 11:00 Las Vegas Harry Reid (LAS) 1
WN 2756 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2025-01-03
Täglich 11:00 Sacramento (SMF) B 13:40 Honolulu (HNL) 2
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 5:40 Effective 2024-10-03 through 2024-11-02
Mo-Fr 11:10 Denver (DEN) 15:35 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-07 through 2025-01-15
Di-Fr,So 11:10 Denver (DEN) 15:35 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-19 through 2025-01-24
Mo-Fr 11:10 Denver (DEN) 15:35 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-27 through 2025-02-05
Di,Mi,So 11:10 Denver (DEN) 15:35 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-02-09 through 2025-02-12
Di,Mi 11:10 Denver (DEN) 15:35 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-02-19 through 2025-03-05
Do,Fr,So 11:40 Las Vegas Harry Reid (LAS) 1 18:20 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 3:40 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 11:40 Las Vegas Harry Reid (LAS) 1 18:20 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 3:40 Effective 2024-11-11 through 2024-11-25
Fr,So 11:40 Las Vegas Harry Reid (LAS) 1 18:20 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 3:40 Effective 2024-12-08 through 2024-12-15
Do 11:40 Las Vegas Harry Reid (LAS) 1 18:20 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 3:40 Operates only on 2024-12-19
Fr 11:40 Las Vegas Harry Reid (LAS) 1 18:20 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 3:40 Operates only on 2025-01-03
Sa 12:30 Orlando (MCO) 15:25 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:55 Effective 2025-01-11 through 2025-02-08
Do,Fr,So 12:45 Denver (DEN) 17:05 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-01-12 through 2025-01-17
Mo,So 12:45 Denver (DEN) 17:05 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 12:45 Denver (DEN) 17:05 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-02 through 2025-02-07
Mo 12:45 Denver (DEN) 17:05 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-02-10
Mo,Di,Do 12:45 Denver (DEN) 17:05 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-18 through 2025-02-24
Mo 12:45 Denver (DEN) 17:05 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-03-03
Mo-Mi 14:30 Baltimore (BWI) 16:15 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-11-04 through 2024-11-06
Di,Mi 14:30 Baltimore (BWI) 16:15 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-11-12 through 2024-11-20
Do 14:30 Grand Rapids (GRR) 14:30 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Operates only on 2024-11-28
Di-Fr 14:30 Baltimore (BWI) 16:15 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-11-29 through 2024-12-06
Mo-Do 14:30 Baltimore (BWI) 16:15 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-12-09 through 2024-12-18
Di,Mi 14:30 Baltimore (BWI) 16:15 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-12-24 through 2025-01-01
Mo 14:30 Baltimore (BWI) 16:15 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2025-01-06
Sa 14:45 Orlando (MCO) 17:30 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-11-09 through 2024-11-16
Sa 14:45 Orlando (MCO) 17:30 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-700 (73W) 2:45 Effective 2024-12-07 through 2024-12-14
Sa 14:55 Baltimore (BWI) 16:45 Grand Rapids (GRR)
WN 2756 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-02-15 through 2025-03-01
Sa 16:00 Grand Rapids (GRR) 16:00 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Effective 2025-01-11 through 2025-02-08
Mo-Fr 16:15 Grand Rapids (GRR) 16:20 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2025-01-07 through 2025-01-15
Di-Fr,So 16:15 Grand Rapids (GRR) 16:20 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2025-01-19 through 2025-01-24
Mo-Fr 16:15 Grand Rapids (GRR) 16:20 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2025-01-27 through 2025-02-05
Di,Mi,So 16:15 Grand Rapids (GRR) 16:20 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2025-02-09 through 2025-02-12
Di,Mi 16:15 Grand Rapids (GRR) 16:20 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2025-02-19 through 2025-03-05
Mo-Mi 17:00 Grand Rapids (GRR) 17:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:05 Effective 2024-11-04 through 2024-11-06
Di,Mi 17:00 Grand Rapids (GRR) 17:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:05 Effective 2024-11-12 through 2024-11-20
Di-Fr 17:00 Grand Rapids (GRR) 17:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:05 Effective 2024-11-29 through 2024-12-06
Mo-Do 17:00 Grand Rapids (GRR) 17:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:05 Effective 2024-12-09 through 2024-12-18
Di,Mi 17:00 Grand Rapids (GRR) 17:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:05 Effective 2024-12-24 through 2025-01-01
Mo 17:00 Grand Rapids (GRR) 17:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:05 Operates only on 2025-01-06
Sa 17:30 Grand Rapids (GRR) 17:35 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-800 (73H) 1:05 Effective 2025-02-15 through 2025-03-01
Sa 17:35 Las Vegas Harry Reid (LAS) 1 18:55 Phoenix Sky Harbor (PHX) 4
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Valid until 2024-09-28
Do,Fr,So 17:55 Grand Rapids (GRR) 18:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-01-12 through 2025-01-17
Mo,So 17:55 Grand Rapids (GRR) 18:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 17:55 Grand Rapids (GRR) 18:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-02-02 through 2025-02-07
Mo 17:55 Grand Rapids (GRR) 18:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2025-02-10
Mo,Di,Do 17:55 Grand Rapids (GRR) 18:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-02-18 through 2025-02-24
Mo 17:55 Grand Rapids (GRR) 18:05 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2025-03-03
So 18:00 Miami (MIA) 20:00 Love Field, Dallas (DAL) 1
WN 2756 Non-stop Boeing 737-700 (73W) 3:00 Operates only on 2024-09-01
Sa 18:05 Grand Rapids (GRR) 18:10 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2024-11-09 through 2024-11-16
Sa 18:05 Grand Rapids (GRR) 18:10 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:05 Effective 2024-12-07 through 2024-12-14
Di,Mi 18:15 Reno (RNO) 19:35 Las Vegas Harry Reid (LAS) 1
WN 2756 Non-stop Boeing 737-700 (73W) 1:20 Valid until 2024-10-02
Do,Fr,So 18:55 Grand Rapids (GRR) 18:55 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 18:55 Grand Rapids (GRR) 18:55 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-11-11 through 2024-11-25
Fr,So 18:55 Grand Rapids (GRR) 18:55 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-12-08 through 2024-12-15
Do 18:55 Grand Rapids (GRR) 18:55 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Operates only on 2024-12-19
Fr 18:55 Grand Rapids (GRR) 18:55 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-700 (73W) 1:00 Operates only on 2025-01-03
So 19:25 Las Vegas Harry Reid (LAS) 1 20:45 Phoenix Sky Harbor (PHX) 4
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-09-08 through 2024-09-29
Sa 19:25 Grand Rapids (GRR) 19:25 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-800 (73H) 1:00 Effective 2024-11-23 through 2024-11-30
Sa 19:25 Grand Rapids (GRR) 19:25 Midway, Chicago (MDW)
WN 2756 Non-stop Boeing 737-800 (73H) 1:00 Effective 2024-12-21 through 2025-01-04
Mo,Do,Fr 19:45 Las Vegas Harry Reid (LAS) 1 21:00 Phoenix Sky Harbor (PHX) 4
WN 2756 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Valid until 2024-09-30
Di,Mi 20:25 Las Vegas Harry Reid (LAS) 1 21:40 Phoenix Sky Harbor (PHX) 4
WN 2756 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2024-10-02
Indirekte Flüge:
Do 07:45 Love Field, Dallas (DAL) 1 13:55 Grand Rapids (GRR)
WN 2756 1-stop Boeing 737-700 (73W) 5:10 Operates only on 2024-11-28
Do,Fr,So 09:30 San Jose (SJC) B 18:20 Grand Rapids (GRR)
WN 2756 1-stop Boeing 737-700 (73W) 5:50 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 09:30 San Jose (SJC) B 18:20 Grand Rapids (GRR)
WN 2756 1-stop Boeing 737-700 (73W) 5:50 Effective 2024-11-11 through 2024-11-25
Do 09:30 Denver (DEN) 14:30 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:00 Operates only on 2024-11-28
Fr,So 09:30 San Jose (SJC) B 18:20 Grand Rapids (GRR)
WN 2756 1-stop Boeing 737-700 (73W) 5:50 Effective 2024-12-08 through 2024-12-15
Do 09:30 San Jose (SJC) B 18:20 Grand Rapids (GRR)
WN 2756 1-stop Boeing 737-700 (73W) 5:50 Operates only on 2024-12-19
Fr 09:30 San Jose (SJC) B 18:20 Grand Rapids (GRR)
WN 2756 1-stop Boeing 737-700 (73W) 5:50 Operates only on 2025-01-03
Mo-Fr 11:10 Denver (DEN) 16:20 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-01-07 through 2025-01-15
Di-Fr,So 11:10 Denver (DEN) 16:20 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-01-19 through 2025-01-24
Mo-Fr 11:10 Denver (DEN) 16:20 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-01-27 through 2025-02-05
Di,Mi,So 11:10 Denver (DEN) 16:20 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-02-09 through 2025-02-12
Di,Mi 11:10 Denver (DEN) 16:20 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-02-19 through 2025-03-05
Do,Fr,So 11:40 Las Vegas Harry Reid (LAS) 1 18:55 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 5:15 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 11:40 Las Vegas Harry Reid (LAS) 1 18:55 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 5:15 Effective 2024-11-11 through 2024-11-25
Fr,So 11:40 Las Vegas Harry Reid (LAS) 1 18:55 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 5:15 Effective 2024-12-08 through 2024-12-15
Do 11:40 Las Vegas Harry Reid (LAS) 1 18:55 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 5:15 Operates only on 2024-12-19
Fr 11:40 Las Vegas Harry Reid (LAS) 1 18:55 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 5:15 Operates only on 2025-01-03
Sa 12:30 Orlando (MCO) 16:00 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:30 Effective 2025-01-11 through 2025-02-08
Do,Fr,So 12:45 Denver (DEN) 18:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-01-12 through 2025-01-17
Mo,So 12:45 Denver (DEN) 18:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-01-20 through 2025-01-26
Do,Fr,So 12:45 Denver (DEN) 18:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-02-02 through 2025-02-07
Mo 12:45 Denver (DEN) 18:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 4:20 Operates only on 2025-02-10
Mo,Di,Do 12:45 Denver (DEN) 18:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2025-02-18 through 2025-02-24
Mo 12:45 Denver (DEN) 18:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 4:20 Operates only on 2025-03-03
Mo-Mi 14:30 Baltimore (BWI) 17:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2024-11-04 through 2024-11-06
Di,Mi 14:30 Baltimore (BWI) 17:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2024-11-12 through 2024-11-20
Di-Fr 14:30 Baltimore (BWI) 17:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2024-11-29 through 2024-12-06
Mo-Do 14:30 Baltimore (BWI) 17:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2024-12-09 through 2024-12-18
Di,Mi 14:30 Baltimore (BWI) 17:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2024-12-24 through 2025-01-01
Mo 14:30 Baltimore (BWI) 17:05 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737 MAX 8 (7M8) 3:35 Operates only on 2025-01-06
Sa 14:45 Orlando (MCO) 18:10 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:25 Effective 2024-11-09 through 2024-11-16
Sa 14:45 Orlando (MCO) 18:10 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-700 (73W) 4:25 Effective 2024-12-07 through 2024-12-14
Sa 14:55 Baltimore (BWI) 17:35 Midway, Chicago (MDW)
WN 2756 1-stop Boeing 737-800 (73H) 3:40 Effective 2025-02-15 through 2025-03-01
Di,Mi 18:15 Reno (RNO) 21:40 Phoenix Sky Harbor (PHX) 4
WN 2756 1-stop Boeing 737-700 (73W) 3:25 Valid until 2024-10-02
Do 07:45 Love Field, Dallas (DAL) 1 14:30 Midway, Chicago (MDW)
WN 2756 2-stop Boeing 737-700 (73W) 6:45 Operates only on 2024-11-28
Do,Fr,So 09:30 San Jose (SJC) B 18:55 Midway, Chicago (MDW)
WN 2756 2-stop Boeing 737-700 (73W) 7:25 Effective 2024-11-03 through 2024-11-10
Mo,Do,Fr,So 09:30 San Jose (SJC) B 18:55 Midway, Chicago (MDW)
WN 2756 2-stop Boeing 737-700 (73W) 7:25 Effective 2024-11-11 through 2024-11-25
Fr,So 09:30 San Jose (SJC) B 18:55 Midway, Chicago (MDW)
WN 2756 2-stop Boeing 737-700 (73W) 7:25 Effective 2024-12-08 through 2024-12-15
Do 09:30 San Jose (SJC) B 18:55 Midway, Chicago (MDW)
WN 2756 2-stop Boeing 737-700 (73W) 7:25 Operates only on 2024-12-19
Fr 09:30 San Jose (SJC) B 18:55 Midway, Chicago (MDW)
WN 2756 2-stop Boeing 737-700 (73W) 7:25 Operates only on 2025-01-03
This flight number is listed as serving the following routes:
Southwest Airlines flug WN 2756: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Southwest Airlines WN2756
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-10-03 through 2024-11-02
Mo
Di
Mi
Do
Fr
Sa
So
Duration: 5:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-01-07 through 2025-01-15
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-19 through 2025-01-24
Mo
-
Di
Mi
Do
Fr
Sa
-
So
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-27 through 2025-02-05
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-09 through 2025-02-12
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-19 through 2025-03-05
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 3:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 3:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 3:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 3:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-11 through 2025-02-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-04 through 2024-11-06
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-12 through 2024-11-20
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-29 through 2024-12-06
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-12-09 through 2024-12-18
Mo
Di
Mi
Do
Fr
-
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-12-24 through 2025-01-01
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-01-06
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-15 through 2025-03-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2756
Effective 2025-01-11 through 2025-02-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-07 through 2025-01-15
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-19 through 2025-01-24
Mo
-
Di
Mi
Do
Fr
Sa
-
So
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-27 through 2025-02-05
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-09 through 2025-02-12
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-19 through 2025-03-05
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-04 through 2024-11-06
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-12 through 2024-11-20
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-29 through 2024-12-06
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-12-09 through 2024-12-18
Mo
Di
Mi
Do
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-12-24 through 2025-01-01
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-01-06
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-15 through 2025-03-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2756
Valid until 2024-09-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Valid until 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-09-08 through 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-23 through 2024-11-30
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2756
Effective 2024-12-21 through 2025-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2756
Valid until 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Valid until 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Indirekte Flüge:

Southwest Airlines WN2756
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 5:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-07 through 2025-01-15
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-19 through 2025-01-24
Mo
-
Di
Mi
Do
Fr
Sa
-
So
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-27 through 2025-02-05
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-09 through 2025-02-12
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-19 through 2025-03-05
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-11 through 2025-02-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-01-12 through 2025-01-17
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-01-20 through 2025-01-26
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-02 through 2025-02-07
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2025-02-18 through 2025-02-24
Mo
Di
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 4:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-04 through 2024-11-06
Mo
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-12 through 2024-11-20
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-29 through 2024-12-06
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-12-09 through 2024-12-18
Mo
Di
Mi
Do
Fr
-
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-12-24 through 2025-01-01
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Operates only on 2025-01-06
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 3:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2756
Effective 2024-11-09 through 2024-11-16
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-07 through 2024-12-14
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2025-02-15 through 2025-03-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:40, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2756
Valid until 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-11-28
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-03 through 2024-11-10
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 7:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-11-11 through 2024-11-25
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
Duration: 7:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Effective 2024-12-08 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 7:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2024-12-19
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 7:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2756
Operates only on 2025-01-03
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 7:25, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - Grand Rapids (GRR)
  • Baltimore (BWI) - Midway, Chicago (MDW)
  • Denver (DEN) - Grand Rapids (GRR)
  • Denver (DEN) - Midway, Chicago (MDW)
  • Grand Rapids (GRR) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Grand Rapids (GRR)
  • Las Vegas Harry Reid (LAS) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Phoenix Sky Harbor (PHX)
  • Love Field, Dallas (DAL) - Denver (DEN)
  • Love Field, Dallas (DAL) - Grand Rapids (GRR)
  • Love Field, Dallas (DAL) - Midway, Chicago (MDW)
  • Miami (MIA) - Love Field, Dallas (DAL)
  • Orlando (MCO) - Grand Rapids (GRR)
  • Orlando (MCO) - Midway, Chicago (MDW)
  • Reno (RNO) - Las Vegas Harry Reid (LAS)
  • Reno (RNO) - Phoenix Sky Harbor (PHX)
  • Sacramento (SMF) - Honolulu (HNL)
  • San Jose (SJC) - Grand Rapids (GRR)
  • San Jose (SJC) - Las Vegas Harry Reid (LAS)
  • San Jose (SJC) - Midway, Chicago (MDW)