Southwest Airlines flug WN 224: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Di-Fr 05:05 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 09:45 San Antonio (SAT) A
WN 224 Non-stop Boeing 737-800 (738) 2:40 Valid until 2024-01-02
Mo,Do,Fr 05:45 Kansas City (MCI) 07:15 Midway, Chicago (MDW)
WN 224 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-08-05 through 2024-09-30
So 06:10 Kansas City (MCI) 07:40 Midway, Chicago (MDW)
WN 224 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-08-11 through 2024-08-25
So 06:10 Kansas City (MCI) 07:40 Midway, Chicago (MDW)
WN 224 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-09-08 through 2024-09-29
Sa 06:20 Kansas City (MCI) 07:45 Midway, Chicago (MDW)
WN 224 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-08-10 through 2024-09-28
Di,Mi 06:25 Kansas City (MCI) 07:45 Midway, Chicago (MDW)
WN 224 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-08-06 through 2024-10-02
So 07:00 Milwaukee (MKE) 10:40 Tampa (TPA)
WN 224 Non-stop Boeing 737-800 (73H) 2:40 Effective 2024-04-14 through 2024-05-19
So 07:00 Milwaukee (MKE) 10:40 Tampa (TPA)
WN 224 Non-stop Boeing 737-800 (73H) 2:40 Operates only on 2024-06-02
So 07:05 Kansas City (MCI) 08:30 Midway, Chicago (MDW)
WN 224 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2024-09-01
So 07:20 Milwaukee (MKE) 11:00 Tampa (TPA)
WN 224 Non-stop Boeing 737-800 (73H) 2:40 Operates only on 2024-05-26
Do 07:30 San Antonio (SAT) A 07:45 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-07-04
Mo,Do,Fr 08:40 Tulsa (TUL) 09:40 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 224 Non-stop Boeing 737-700 (73W) 3:00 Effective 2024-01-08 through 2024-03-04
Sa 08:50 Milwaukee (MKE) 12:30 Tampa (TPA)
WN 224 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-04-13 through 2024-06-01
Sa 08:55 William P. Hobby, Houston (HOU) 10:25 Tulsa (TUL)
WN 224 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2024-01-13 through 2024-03-02
Di,Mi 09:35 Milwaukee (MKE) 13:15 Tampa (TPA)
WN 224 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-04-09 through 2024-05-29
Sa 11:10 Tulsa (TUL) 14:30 Orlando (MCO)
WN 224 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-01-13 through 2024-03-02
Mo,So 11:15 Sacramento (SMF) B 12:30 Burbank (BUR)
WN 224 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2024-01-01
Mi-Fr,So 11:15 Sacramento (SMF) B 12:30 Burbank (BUR)
WN 224 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-01-03 through 2024-01-07
Mo,Do,Fr 11:20 Milwaukee (MKE) 15:00 Tampa (TPA)
WN 224 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-04-11 through 2024-06-03
Mo,So 13:05 Burbank (BUR) 16:25 Denver (DEN)
WN 224 Non-stop Boeing 737-700 (73W) 2:20 Valid until 2024-01-01
Mi-Fr,So 13:05 Burbank (BUR) 16:25 Denver (DEN)
WN 224 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-01-03 through 2024-01-07
So 14:45 Savannah (SAV) 16:20 William P. Hobby, Houston (HOU)
WN 224 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-01-14 through 2024-03-03
Di,Mi 15:40 Buffalo (BUF) 18:30 Orlando (MCO)
WN 224 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-02-20 through 2024-03-06
Sa 15:45 Sacramento (SMF) B 16:55 Burbank (BUR)
WN 224 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-01-06
So 17:05 William P. Hobby, Houston (HOU) 18:35 Tulsa (TUL)
WN 224 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-01-14 through 2024-03-03
Sa 17:30 Burbank (BUR) 20:45 Denver (DEN)
WN 224 Non-stop Boeing 737-700 (73W) 2:15 Operates only on 2024-01-06
Di,Mi 18:05 Denver (DEN) 19:05 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-03-12 through 2024-04-03
Sa 18:10 Denver (DEN) 20:05 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-03-09
Sa 18:10 Denver (DEN) 19:05 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-03-16 through 2024-04-06
So 19:10 Tulsa (TUL) 20:10 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 224 Non-stop Boeing 737-700 (73W) 3:00 Effective 2024-01-14 through 2024-03-03
Sa 19:45 Sky Harbor, Phoenix (PHX) 4 21:05 Long Beach (LGB)
WN 224 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-03-16 through 2024-04-06
Fr 20:10 Saint Louis (STL) 2 23:30 Sarasota/Bradenton (SRQ)
WN 224 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-07-05
Sa 20:40 Austin (AUS) 22:10 San Jose (SJC) B
WN 224 Non-stop Boeing 737-800 (73H) 3:30 Effective 2024-06-08 through 2024-08-03
So 20:45 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 22:10 San Jose (SJC) B
WN 224 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-01-14 through 2024-03-03
Sa 20:45 Sky Harbor, Phoenix (PHX) 4 21:05 Long Beach (LGB)
WN 224 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-03-09
Di,Mi 21:05 Austin (AUS) 22:40 San Jose (SJC) B
WN 224 Non-stop Boeing 737-700 (73W) 3:35 Effective 2024-06-04 through 2024-07-31
So 21:05 Austin (AUS) 22:35 San Jose (SJC) B
WN 224 Non-stop Boeing 737-800 (73H) 3:30 Effective 2024-06-09 through 2024-08-04
Mo,Do,Fr 21:10 Austin (AUS) 22:40 San Jose (SJC) B
WN 224 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2024-06-06 through 2024-07-01
Mo,Do,Fr 21:10 Austin (AUS) 22:40 San Jose (SJC) B
WN 224 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2024-07-08 through 2024-08-02
So 21:55 Denver (DEN) 22:50 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-03-10 through 2024-04-07
Do,Fr 22:25 Denver (DEN) 00:20 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-03-07 through 2024-03-08
The flight arrives 1 day after departure.
Mo,Do,Fr 22:25 Denver (DEN) 23:20 Sky Harbor, Phoenix (PHX) 4
WN 224 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-03-11 through 2024-04-08
Indirekte Flüge:
Sa 08:55 William P. Hobby, Houston (HOU) 14:30 Orlando (MCO)
WN 224 1-stop Boeing 737 MAX 8 (7M8) 4:35 Effective 2024-01-13 through 2024-03-02
Mo,So 11:15 Sacramento (SMF) B 16:25 Denver (DEN)
WN 224 1-stop Boeing 737-700 (73W) 4:10 Valid until 2024-01-01
Mi-Fr,So 11:15 Sacramento (SMF) B 16:25 Denver (DEN)
WN 224 1-stop Boeing 737-700 (73W) 4:10 Effective 2024-01-03 through 2024-01-07
So 14:45 Savannah (SAV) 18:35 Tulsa (TUL)
WN 224 1-stop Boeing 737-700 (73W) 4:50 Effective 2024-01-14 through 2024-03-03
Sa 15:45 Sacramento (SMF) B 20:45 Denver (DEN)
WN 224 1-stop Boeing 737-700 (73W) 4:00 Operates only on 2024-01-06
So 17:05 William P. Hobby, Houston (HOU) 20:10 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 224 1-stop Boeing 737-700 (73W) 5:05 Effective 2024-01-14 through 2024-03-03
Sa 18:10 Denver (DEN) 21:05 Long Beach (LGB)
WN 224 1-stop Boeing 737-700 (73W) 3:55 Effective 2024-03-09 through 2024-04-06
So 19:10 Tulsa (TUL) 22:10 San Jose (SJC) B
WN 224 1-stop Boeing 737-700 (73W) 5:00 Effective 2024-01-14 through 2024-03-03
So 14:45 Savannah (SAV) 20:10 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 224 2-stop Boeing 737-700 (73W) 8:25 Effective 2024-01-14 through 2024-03-03
So 17:05 William P. Hobby, Houston (HOU) 22:10 San Jose (SJC) B
WN 224 2-stop Boeing 737-700 (73W) 7:05 Effective 2024-01-14 through 2024-03-03
So 14:45 Savannah (SAV) 22:10 San Jose (SJC) B
WN 224 3-stop Boeing 737-700 (73W) 10:25 Effective 2024-01-14 through 2024-03-03
This flight number is listed as serving the following routes:
Southwest Airlines flug WN 224: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Southwest Airlines WN224
Valid until 2024-01-02
Mo
-
Di
Mi
Do
Fr
Sa
-
So
-
Duration: 2:40, non-stop
Boeing 737-800 (738)

Southwest Airlines WN224
Effective 2024-08-05 through 2024-09-30
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-08-11 through 2024-08-25
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-09-08 through 2024-09-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-08-10 through 2024-09-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-08-06 through 2024-10-02
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-04-14 through 2024-05-19
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Operates only on 2024-06-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Operates only on 2024-09-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Operates only on 2024-05-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Operates only on 2024-07-04
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-01-08 through 2024-03-04
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 3:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-04-13 through 2024-06-01
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-13 through 2024-03-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN224
Effective 2024-04-09 through 2024-05-29
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-13 through 2024-03-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN224
Valid until 2024-01-01
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-03 through 2024-01-07
Mo
-
Di
-
Mi
Do
Fr
Sa
-
So
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-04-11 through 2024-06-03
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Valid until 2024-01-01
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-03 through 2024-01-07
Mo
-
Di
-
Mi
Do
Fr
Sa
-
So
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-02-20 through 2024-03-06
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Operates only on 2024-01-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Operates only on 2024-01-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-03-12 through 2024-04-03
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN224
Operates only on 2024-03-09
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-03-16 through 2024-04-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-03-16 through 2024-04-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Operates only on 2024-07-05
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-06-08 through 2024-08-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Operates only on 2024-03-09
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-06-04 through 2024-07-31
Mo
-
Di
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-06-09 through 2024-08-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-06-06 through 2024-07-01
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN224
Effective 2024-07-08 through 2024-08-02
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN224
Effective 2024-03-10 through 2024-04-07
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN224
Effective 2024-03-07 through 2024-03-08
Mo
-
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN224
Effective 2024-03-11 through 2024-04-08
Mo
Di
-
Mi
-
Do
Fr
Sa
-
So
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Indirekte Flüge:

Southwest Airlines WN224
Effective 2024-01-13 through 2024-03-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN224
Valid until 2024-01-01
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-03 through 2024-01-07
Mo
-
Di
-
Mi
Do
Fr
Sa
-
So
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 4:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Operates only on 2024-01-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 4:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 5:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-03-09 through 2024-04-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
19:10

22:10
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 5:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 8:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 7:05, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN224
Effective 2024-01-14 through 2024-03-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 10:25, 3-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Austin (AUS) - San Jose (SJC)
  • Buffalo (BUF) - Orlando (MCO)
  • Burbank (BUR) - Denver (DEN)
  • Denver (DEN) - Long Beach (LGB)
  • Denver (DEN) - Sky Harbor, Phoenix (PHX)
  • HARRY REID INTL AIRPORT, Las Vegas (LAS) - San Antonio (SAT)
  • HARRY REID INTL AIRPORT, Las Vegas (LAS) - San Jose (SJC)
  • Kansas City (MCI) - Midway, Chicago (MDW)
  • Milwaukee (MKE) - Tampa (TPA)
  • Sacramento (SMF) - Burbank (BUR)
  • Sacramento (SMF) - Denver (DEN)
  • Saint Louis (STL) - Sarasota/Bradenton (SRQ)
  • San Antonio (SAT) - Sky Harbor, Phoenix (PHX)
  • Savannah (SAV) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Savannah (SAV) - San Jose (SJC)
  • Savannah (SAV) - Tulsa (TUL)
  • Savannah (SAV) - William P. Hobby, Houston (HOU)
  • Sky Harbor, Phoenix (PHX) - Long Beach (LGB)
  • Tulsa (TUL) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Tulsa (TUL) - Orlando (MCO)
  • Tulsa (TUL) - San Jose (SJC)
  • William P. Hobby, Houston (HOU) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • William P. Hobby, Houston (HOU) - Orlando (MCO)
  • William P. Hobby, Houston (HOU) - San Jose (SJC)
  • William P. Hobby, Houston (HOU) - Tulsa (TUL)