FLUGPLAN |
---|
Direktflüge: |
Sa
12:25
Madrid (MAD) 4S
14:10
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-11-02 through 2024-11-09 |
So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2024-10-27 through 2024-11-10 |
Mi,Fr
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-10-30 through 2024-11-22 |
Sa,So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2024-11-16 through 2024-11-17 |
Mi,Fr,Sa
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-11-23 through 2024-11-30 |
So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2024-11-24 through 2024-12-01 |
Mo,Mi,Fr,Sa
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-12-02 through 2024-12-14 |
Do,So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2024-12-05 through 2024-12-12 |
Do-So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2024-12-15 through 2025-01-12 |
Mo-Mi
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2024-12-16 through 2025-01-13 |
Mo,Mi,Do
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2025-01-15 through 2025-01-20 |
Mi,Fr,Sa
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-01-17 through 2025-01-22 |
So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2025-01-19 |
Mo,Do-So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2025-01-23 through 2025-02-17 |
Mi
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-01-29 through 2025-02-19 |
Mo,Mi-Sa
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-02-20 through 2025-03-05 |
So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2025-02-23 through 2025-03-02 |
Do,So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2025-03-06 through 2025-03-09 |
Mo,Mi-Sa
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-03-07 through 2025-03-19 |
Do,So
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2025-03-16 through 2025-03-27 |
Mo,Mi,Fr,Sa
13:00
Madrid (MAD) 4S
14:45
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-03-21 through 2025-03-29 |
Mo,Mi,So
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:50 Valid until 2024-09-11 |
Di,Do-Sa
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Valid until 2024-09-10 |
Mo,Mi-Fr
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-09-12 through 2024-09-18 |
Fr-So
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2024-09-14 through 2024-09-20 |
Mi,So
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-09-22 through 2024-10-16 |
Mo,Fr
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2024-09-23 through 2024-10-14 |
Mi,Fr
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-10-18 through 2024-10-25 |
Mo,So
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2024-10-20 through 2024-10-21 |
Mo,Mi,Fr,So
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2025-03-30 through 2025-06-20 |
Di,Fr-So
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective from 2025-06-21 |
Mo,Mi,Do
13:45
Madrid (MAD) 4S
14:35
Casablanca (CMN) 2 AT 973 Non-stop Boeing 737-800 (73H) 1:50 Effective from 2025-06-23 |