Iberia flug IB 5814: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direkte Codeshareflüge:
So 12:00 Barcelona (BCN) 1 13:50 Dublin (DUB) 2
IB 5814 Non-stop Airbus A320 (320) 2:50 Valid until 2024-09-08
Codeshare flight, operated by Vueling.(VY 8722)
Sa 15:25 Barcelona (BCN) 1 17:15 Santiago de Compostela (SCQ)
IB 5814 Non-stop Airbus A320 (320) 1:50 Effective 2024-11-02 through 2024-12-07
Codeshare flight, operated by Vueling.(VY 1674)
Sa 15:25 Barcelona (BCN) 1 17:15 Santiago de Compostela (SCQ)
IB 5814 Non-stop Airbus A320 (320) 1:50 Effective 2024-12-28 through 2025-01-25
Codeshare flight, operated by Vueling.(VY 1674)
Sa 15:25 Barcelona (BCN) 1 17:15 Santiago de Compostela (SCQ)
IB 5814 Non-stop Airbus A320 (320) 1:50 Effective 2025-03-01 through 2025-03-29
Codeshare flight, operated by Vueling.(VY 1674)
Di 16:55 Barcelona (BCN) 1 18:45 Dublin (DUB) 2
IB 5814 Non-stop Airbus A321 (321) 2:50 Effective 2024-09-10 through 2024-10-22
Codeshare flight, operated by Vueling.(VY 8722)
Di 17:40 Barcelona (BCN) 1 19:30 Dublin (DUB) 2
IB 5814 Non-stop Airbus A321 (321) 2:50 Operates only on 2024-09-03
Codeshare flight, operated by Vueling.(VY 8722)
So 18:10 Barcelona (BCN) 1 20:05 Dublin (DUB) 2
IB 5814 Non-stop Airbus A320 (320) 2:55 Effective 2024-09-15 through 2024-10-20
Codeshare flight, operated by Vueling.(VY 8722)
Sa 18:35 Barcelona (BCN) 1 20:30 Dublin (DUB) 2
IB 5814 Non-stop Airbus A320 (320) 2:55 Effective 2024-09-14 through 2024-10-26
Codeshare flight, operated by Vueling.(VY 8722)
Fr 19:25 Barcelona (BCN) 1 21:20 Dublin (DUB) 2
IB 5814 Non-stop Airbus A320 (320) 2:55 Valid until 2024-10-25
Codeshare flight, operated by Vueling.(VY 8722)
This flight number is listed as serving the following routes:
Iberia flug IB 5814: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direkte Codeshareflüge:

Iberia IB5814
12:00

13:50
Valid until 2024-09-08
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Vueling. (VY 8722)
Duration: 2:50, non-stop
Airbus A320 (320)

Iberia IB5814
Effective 2024-11-02 through 2024-12-07
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Vueling. (VY 1674)
Duration: 1:50, non-stop
Airbus A320 (320)

Iberia IB5814
Effective 2024-12-28 through 2025-01-25
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Vueling. (VY 1674)
Duration: 1:50, non-stop
Airbus A320 (320)

Iberia IB5814
Effective 2025-03-01 through 2025-03-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Vueling. (VY 1674)
Duration: 1:50, non-stop
Airbus A320 (320)

Iberia IB5814
16:55

18:45
Effective 2024-09-10 through 2024-10-22
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Codeshare flight, operated by Vueling. (VY 8722)
Duration: 2:50, non-stop
Airbus A321 (321)

Iberia IB5814
17:40

19:30
Operates only on 2024-09-03
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Codeshare flight, operated by Vueling. (VY 8722)
Duration: 2:50, non-stop
Airbus A321 (321)

Iberia IB5814
18:10

20:05
Effective 2024-09-15 through 2024-10-20
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Vueling. (VY 8722)
Duration: 2:55, non-stop
Airbus A320 (320)

Iberia IB5814
18:35

20:30
Effective 2024-09-14 through 2024-10-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Vueling. (VY 8722)
Duration: 2:55, non-stop
Airbus A320 (320)

Iberia IB5814
19:25

21:20
Valid until 2024-10-25
Mo
-
Di
-
Mi
-
Do
-
Fr
Sa
-
So
-
Codeshare flight, operated by Vueling. (VY 8722)
Duration: 2:55, non-stop
Airbus A320 (320)
This flight number is listed as serving the following routes:
  • Barcelona (BCN) - Dublin (DUB)
  • Barcelona (BCN) - Santiago de Compostela (SCQ)