Cathay Pacific flug CX 97: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo,Mi,Fr,So 08:45 Felipe Angeles Intl., Mexico City (NLU) 10:15 Guadalajara (GDL)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 1:30 Effective 2024-02-02 through 2024-03-29
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 10:45 Felipe Angeles Intl., Mexico City (NLU) 12:15 Guadalajara (GDL)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 1:30 Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 10:45 Felipe Angeles Intl., Mexico City (NLU) 12:15 Guadalajara (GDL)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 1:30 Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 11:55 Guadalajara (GDL) 16:45 Anchorage (ANC)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 7:50 Effective 2024-02-02 through 2024-03-08
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 11:55 Guadalajara (GDL) 17:45 Anchorage (ANC)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 7:50 Effective 2024-03-10 through 2024-03-29
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 13:55 Guadalajara (GDL) 18:45 Anchorage (ANC)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 7:50 Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 13:55 Guadalajara (GDL) 18:45 Anchorage (ANC)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 7:50 Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 18:00 Anchorage (ANC) 22:55 Hong Kong (HKG)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 11:55 Effective 2024-02-02 through 2024-03-08
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 19:00 Anchorage (ANC) 22:55 Hong Kong (HKG)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 11:55 Effective 2024-03-10 through 2024-03-29
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 20:00 Anchorage (ANC) 00:55 Hong Kong (HKG)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 11:55 Valid until 2024-01-10
The flight arrives 2 days after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 20:00 Anchorage (ANC) 00:55 Hong Kong (HKG)
CX 97 Non-stop Boeing 747-8 Freighter (74N) 11:55 Effective 2024-01-14 through 2024-01-31
The flight arrives 2 days after departure.
This is a Scheduled Cargo flight.
Indirekte Flüge:
Mo,Mi,Fr,So 08:45 Felipe Angeles Intl., Mexico City (NLU) 16:45 Anchorage (ANC)
CX 97 1-stop Boeing 747-8 Freighter (74N) 11:00 Effective 2024-02-02 through 2024-03-08
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 08:45 Felipe Angeles Intl., Mexico City (NLU) 17:45 Anchorage (ANC)
CX 97 1-stop Boeing 747-8 Freighter (74N) 11:00 Effective 2024-03-10 through 2024-03-29
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 10:45 Felipe Angeles Intl., Mexico City (NLU) 18:45 Anchorage (ANC)
CX 97 1-stop Boeing 747-8 Freighter (74N) 11:00 Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 10:45 Felipe Angeles Intl., Mexico City (NLU) 18:45 Anchorage (ANC)
CX 97 1-stop Boeing 747-8 Freighter (74N) 11:00 Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 11:55 Guadalajara (GDL) 22:55 Hong Kong (HKG)
CX 97 1-stop Boeing 747-8 Freighter (74N) 21:00 Effective 2024-02-02 through 2024-03-29
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 13:55 Guadalajara (GDL) 00:55 Hong Kong (HKG)
CX 97 1-stop Boeing 747-8 Freighter (74N) 21:00 Valid until 2024-01-10
The flight arrives 2 days after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 13:55 Guadalajara (GDL) 00:55 Hong Kong (HKG)
CX 97 1-stop Boeing 747-8 Freighter (74N) 21:00 Effective 2024-01-14 through 2024-01-31
The flight arrives 2 days after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 08:45 Felipe Angeles Intl., Mexico City (NLU) 22:55 Hong Kong (HKG)
CX 97 2-stop Boeing 747-8 Freighter (74N) 24:10 Effective 2024-02-02 through 2024-03-29
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 10:45 Felipe Angeles Intl., Mexico City (NLU) 00:55 Hong Kong (HKG)
CX 97 2-stop Boeing 747-8 Freighter (74N) 24:10 Valid until 2024-01-10
The flight arrives 2 days after departure.
This is a Scheduled Cargo flight.
Mo,Mi,Fr,So 10:45 Felipe Angeles Intl., Mexico City (NLU) 00:55 Hong Kong (HKG)
CX 97 2-stop Boeing 747-8 Freighter (74N) 24:10 Effective 2024-01-14 through 2024-01-31
The flight arrives 2 days after departure.
This is a Scheduled Cargo flight.
This flight number is listed as serving the following routes:
Cathay Pacific flug CX 97: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Cathay Pacific CX97
Effective 2024-02-02 through 2024-03-29
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 1:30, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-02-02 through 2024-03-08
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 7:50, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-03-10 through 2024-03-29
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 7:50, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 7:50, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 7:50, non-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-02-02 through 2024-03-08
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:55, non-stop
Boeing 747-8 Freighter (74N)
The flight arrives 1 day after departure.

Cathay Pacific CX97
Effective 2024-03-10 through 2024-03-29
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:55, non-stop
Boeing 747-8 Freighter (74N)
The flight arrives 1 day after departure.

Cathay Pacific CX97
Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:55, non-stop
Boeing 747-8 Freighter (74N)
The flight arrives 2 days after departure.

Cathay Pacific CX97
Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:55, non-stop
Boeing 747-8 Freighter (74N)
The flight arrives 2 days after departure.

Indirekte Flüge:

Cathay Pacific CX97
Effective 2024-02-02 through 2024-03-08
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:00, 1-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-03-10 through 2024-03-29
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:00, 1-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:00, 1-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 11:00, 1-stop
Boeing 747-8 Freighter (74N)

Cathay Pacific CX97
Effective 2024-02-02 through 2024-03-29
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 21:00, 1-stop
Boeing 747-8 Freighter (74N)
The flight arrives 1 day after departure.

Cathay Pacific CX97
Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 21:00, 1-stop
Boeing 747-8 Freighter (74N)
The flight arrives 2 days after departure.

Cathay Pacific CX97
Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 21:00, 1-stop
Boeing 747-8 Freighter (74N)
The flight arrives 2 days after departure.

Cathay Pacific CX97
Effective 2024-02-02 through 2024-03-29
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 24:10, 2-stop
Boeing 747-8 Freighter (74N)
The flight arrives 1 day after departure.

Cathay Pacific CX97
Valid until 2024-01-10
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 24:10, 2-stop
Boeing 747-8 Freighter (74N)
The flight arrives 2 days after departure.

Cathay Pacific CX97
Effective 2024-01-14 through 2024-01-31
This is a Scheduled Cargo flight.
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 24:10, 2-stop
Boeing 747-8 Freighter (74N)
The flight arrives 2 days after departure.
This flight number is listed as serving the following routes:
  • Anchorage (ANC) - Hong Kong (HKG)
  • Felipe Angeles Intl., Mexico City (NLU) - Anchorage (ANC)
  • Felipe Angeles Intl., Mexico City (NLU) - Guadalajara (GDL)
  • Felipe Angeles Intl., Mexico City (NLU) - Hong Kong (HKG)
  • Guadalajara (GDL) - Anchorage (ANC)
  • Guadalajara (GDL) - Hong Kong (HKG)