FLUGPLAN |
---|
Direkte Codeshareflüge: |
Täglich
16:20
Las Americas, Santo Domingo (SDQ)
06:40
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:20 Valid until 2024-09-01 Codeshare flight, operated by Iberia.(IB 6500) The flight arrives 1 day after departure. |
Di-So
16:20
Las Americas, Santo Domingo (SDQ)
06:40
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:20 Effective 2024-09-03 through 2024-10-02 Codeshare flight, operated by Iberia.(IB 6500) The flight arrives 1 day after departure. |
Do
16:20
Las Americas, Santo Domingo (SDQ)
06:40
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-300 (333) 8:20 Operates only on 2024-10-03 Codeshare flight, operated by Iberia.(IB 6500) The flight arrives 1 day after departure. |
Mo-Fr,So
16:20
Las Americas, Santo Domingo (SDQ)
06:40
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:20 Effective 2024-10-04 through 2024-10-18 Codeshare flight, operated by Iberia.(IB 6500) The flight arrives 1 day after departure. |
Di-So
16:20
Las Americas, Santo Domingo (SDQ)
06:40
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:20 Effective 2024-10-19 through 2024-10-25 Codeshare flight, operated by Iberia.(IB 6500) The flight arrives 1 day after departure. |
Sa
16:20
Las Americas, Santo Domingo (SDQ)
05:40
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:20 Operates only on 2024-10-26 Codeshare flight, operated by Iberia.(IB 6500) The flight arrives 1 day after departure. |
Täglich
16:30
Las Americas, Santo Domingo (SDQ)
06:45
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Effective from 2025-03-30 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Mo,Fr-So
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Effective 2024-10-27 through 2024-11-04 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Di,Mi
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-300 (333) 8:15 Effective 2024-10-29 through 2024-10-30 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Täglich
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Effective 2024-11-05 through 2024-12-23 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Di
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-300 (333) 8:15 Effective 2024-12-24 through 2025-01-07 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Mo,Mi-So
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Effective 2024-12-25 through 2025-01-13 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Mo,Di,Fr-So
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Effective 2025-01-14 through 2025-01-21 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Mi,Do
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-300 (333) 8:15 Effective 2025-01-15 through 2025-01-16 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Täglich
17:35
Las Americas, Santo Domingo (SDQ)
06:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Effective 2025-01-22 through 2025-03-28 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |
Sa
17:35
Las Americas, Santo Domingo (SDQ)
07:50
Madrid (MAD) 4S BA 4294 Non-stop Airbus A330-200 (332) 8:15 Operates only on 2025-03-29 Codeshare flight, operated by Iberia.(IB 266) The flight arrives 1 day after departure. |