FLUGPLAN |
---|
Direkte Codeshareflüge: |
Mo,So
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737-800 (738) 2:25 Valid until 2024-09-02 Codeshare flight, operated by Gol.(G3 7631) |
Di-Sa
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Valid until 2024-09-03 Codeshare flight, operated by Gol.(G3 7631) |
Mi,Fr-So
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-04 through 2024-09-11 Codeshare flight, operated by Gol.(G3 7631) |
Mo,Di,Do
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-05 through 2024-09-10 Codeshare flight, operated by Gol.(G3 7631) |
Mo-Do
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-12 through 2024-09-18 Codeshare flight, operated by Gol.(G3 7631) |
Do-So
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-13 through 2024-09-22 Codeshare flight, operated by Gol.(G3 7631) |
Mo,Mi,Fr,Sa
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-23 through 2024-09-30 Codeshare flight, operated by Gol.(G3 7631) |
Di,Do,So
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-24 through 2024-10-01 Codeshare flight, operated by Gol.(G3 7631) |
Täglich
13:10
Montevideo (MVD)
15:35
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-10-02 through 2024-10-26 Codeshare flight, operated by Gol.(G3 7631) |
Täglich
13:15
Montevideo (MVD)
15:50
Guarulhos, Sao Paulo (GRU) 2 AF 6334 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-10-27 through 2025-05-15 Codeshare flight, operated by Gol.(G3 7631) |