Air France flug AF 2530: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direkte Codeshareflüge:
Do,Sa,So 06:50 Tucson (TUS) 08:54 Salt Lake City (SLC)
AF 2530 Non-stop Embraer EMB 175 (E7W) 2:04 Effective 2024-11-14 through 2024-11-24
Codeshare flight, operated by Delta Air Lines.(DL 3745)
Mo,Di,Sa,So 06:50 Tucson (TUS) 08:54 Salt Lake City (SLC)
AF 2530 Non-stop Embraer EMB 175 (E7W) 2:04 Effective 2024-11-25 through 2024-12-01
Codeshare flight, operated by Delta Air Lines.(DL 3745)
Do,Sa,So 06:50 Tucson (TUS) 08:54 Salt Lake City (SLC)
AF 2530 Non-stop Embraer EMB 175 (E7W) 2:04 Effective 2024-12-05 through 2024-12-15
Codeshare flight, operated by Delta Air Lines.(DL 3745)
Di,Do,So 06:50 Tucson (TUS) 08:53 Salt Lake City (SLC)
AF 2530 Non-stop Embraer EMB 175 (E7W) 2:03 Effective 2025-01-07 through 2025-02-16
Codeshare flight, operated by Delta Air Lines.(DL 3745)
Do,So 06:50 Tucson (TUS) 08:53 Salt Lake City (SLC)
AF 2530 Non-stop Embraer EMB 175 (E7W) 2:03 Effective 2025-02-20 through 2025-03-06
Codeshare flight, operated by Delta Air Lines.(DL 3745)
Mo-Fr,So 13:28 Charlotte (CLT) 15:36 New York John F. Kennedy (JFK) 4
AF 2530 Non-stop Canadair CRJ 900 (CR9) 2:08 Effective 2024-10-08 through 2024-10-25
Codeshare flight, operated by Delta Air Lines.(DL 4913)
Sa 13:31 Charlotte (CLT) 15:39 New York John F. Kennedy (JFK) 4
AF 2530 Non-stop Canadair CRJ 900 (CR9) 2:08 Effective 2024-10-12 through 2024-10-19
Codeshare flight, operated by Delta Air Lines.(DL 4913)
Mi,So 17:20 New York John F. Kennedy (JFK) 4 19:16 Buffalo (BUF)
AF 2530 Non-stop Canadair CRJ 900 (CR9) 1:56 Effective 2024-09-04 through 2024-09-08
Codeshare flight, operated by Delta Air Lines.(DL 5477)
Mo 18:40 Atlanta (ATL) S 20:09 Indianapolis (IND)
AF 2530 Non-stop Boeing 757 (757) 1:29 Operates only on 2024-09-02
Codeshare flight, operated by Delta Air Lines.(DL 1511)
Mi 18:43 Atlanta (ATL) S 18:36 Birmingham (BHM)
AF 2530 Non-stop Boeing 737-900 (739) 0:53 Effective 2024-09-11 through 2024-10-02
Codeshare flight, operated by Delta Air Lines.(DL 3044)
Mo 18:45 Atlanta (ATL) S 18:41 Birmingham (BHM)
AF 2530 Non-stop Boeing 717 (717) 0:56 Effective 2025-01-06 through 2025-02-10
Codeshare flight, operated by Delta Air Lines.(DL 3044)
Mo 18:45 Atlanta (ATL) S 18:38 Birmingham (BHM)
AF 2530 Non-stop Boeing 737-900 (739) 0:53 Effective 2025-02-17 through 2025-03-03
Codeshare flight, operated by Delta Air Lines.(DL 3044)
Täglich 18:45 Atlanta (ATL) S 18:36 Birmingham (BHM)
AF 2530 Non-stop Boeing 737-900 (739) 0:51 Effective 2025-03-10 through 2025-03-31
Codeshare flight, operated by Delta Air Lines.(DL 3044)
Mo,Mi,Fr,So 18:45 Atlanta (ATL) S 18:36 Birmingham (BHM)
AF 2530 Non-stop Boeing 737-900 (739) 0:51 Effective 2025-04-02 through 2025-04-13
Codeshare flight, operated by Delta Air Lines.(DL 3044)
Täglich 19:30 Atlanta (ATL) S 19:24 Birmingham (BHM)
AF 2530 Non-stop Boeing 737-900 (739) 0:54 Effective from 2025-04-14
Codeshare flight, operated by Delta Air Lines.(DL 3044)
Mo,Do,So 20:47 Atlanta (ATL) S 22:16 Indianapolis (IND)
AF 2530 Non-stop Boeing 757 (757) 1:29 Effective 2024-09-09 through 2024-10-06
Codeshare flight, operated by Delta Air Lines.(DL 1511)
Mo,So 20:47 Atlanta (ATL) S 22:20 Indianapolis (IND)
AF 2530 Non-stop Airbus A321 (321) 1:33 Effective 2024-10-27 through 2024-10-28
Codeshare flight, operated by Delta Air Lines.(DL 1511)
This flight number is listed as serving the following routes:
Air France flug AF 2530: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direkte Codeshareflüge:

Air France AF2530
Effective 2024-11-14 through 2024-11-24
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
So
Codeshare flight, operated by Delta Air Lines. (DL 3745)
Duration: 2:04, non-stop
Embraer EMB 175 (E7W)

Air France AF2530
Effective 2024-11-25 through 2024-12-01
Mo
Di
Mi
-
Do
-
Fr
-
Sa
So
Codeshare flight, operated by Delta Air Lines. (DL 3745)
Duration: 2:04, non-stop
Embraer EMB 175 (E7W)

Air France AF2530
Effective 2024-12-05 through 2024-12-15
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
So
Codeshare flight, operated by Delta Air Lines. (DL 3745)
Duration: 2:04, non-stop
Embraer EMB 175 (E7W)

Air France AF2530
Effective 2025-01-07 through 2025-02-16
Mo
-
Di
Mi
-
Do
Fr
-
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 3745)
Duration: 2:03, non-stop
Embraer EMB 175 (E7W)

Air France AF2530
Effective 2025-02-20 through 2025-03-06
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 3745)
Duration: 2:03, non-stop
Embraer EMB 175 (E7W)

Air France AF2530
Effective 2024-10-08 through 2024-10-25
Mo
Di
Mi
Do
Fr
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 4913)
Duration: 2:08, non-stop
Canadair CRJ 900 (CR9)

Air France AF2530
Effective 2024-10-12 through 2024-10-19
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Delta Air Lines. (DL 4913)
Duration: 2:08, non-stop
Canadair CRJ 900 (CR9)

Air France AF2530
Effective 2024-09-04 through 2024-09-08
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 5477)
Duration: 1:56, non-stop
Canadair CRJ 900 (CR9)

Air France AF2530
Operates only on 2024-09-02
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Codeshare flight, operated by Delta Air Lines. (DL 1511)
Duration: 1:29, non-stop
Boeing 757 (757)

Air France AF2530
Effective 2024-09-11 through 2024-10-02
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Codeshare flight, operated by Delta Air Lines. (DL 3044)
Duration: 0:53, non-stop
Boeing 737-900 (739)

Air France AF2530
Effective 2025-01-06 through 2025-02-10
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Codeshare flight, operated by Delta Air Lines. (DL 3044)
Duration: 0:56, non-stop
Boeing 717 (717)

Air France AF2530
Effective 2025-02-17 through 2025-03-03
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Codeshare flight, operated by Delta Air Lines. (DL 3044)
Duration: 0:53, non-stop
Boeing 737-900 (739)

Air France AF2530
Effective 2025-03-10 through 2025-03-31
Mo
Di
Mi
Do
Fr
Sa
So
Codeshare flight, operated by Delta Air Lines. (DL 3044)
Duration: 0:51, non-stop
Boeing 737-900 (739)

Air France AF2530
Effective 2025-04-02 through 2025-04-13
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 3044)
Duration: 0:51, non-stop
Boeing 737-900 (739)

Air France AF2530
Effective from 2025-04-14
Mo
Di
Mi
Do
Fr
Sa
So
Codeshare flight, operated by Delta Air Lines. (DL 3044)
Duration: 0:54, non-stop
Boeing 737-900 (739)

Air France AF2530
Effective 2024-09-09 through 2024-10-06
Mo
Di
-
Mi
-
Do
Fr
-
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 1511)
Duration: 1:29, non-stop
Boeing 757 (757)

Air France AF2530
Effective 2024-10-27 through 2024-10-28
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Delta Air Lines. (DL 1511)
Duration: 1:33, non-stop
Airbus A321 (321)
This flight number is listed as serving the following routes:
  • Atlanta (ATL) - Birmingham (BHM)
  • Atlanta (ATL) - Indianapolis (IND)
  • Charlotte (CLT) - New York John F. Kennedy (JFK)
  • New York John F. Kennedy (JFK) - Buffalo (BUF)
  • Tucson (TUS) - Salt Lake City (SLC)