FLUGPLAN |
---|
Direkte Codeshareflüge: |
Sa
06:05
Vitoria (VIX)
07:15
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Operates only on 2024-02-03 Codeshare flight, operated by Gol.(G3 2007) |
Sa
06:05
Vitoria (VIX)
07:15
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Operates only on 2024-02-17 Codeshare flight, operated by Gol.(G3 2007) |
Di,Fr
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Valid until 2024-01-02 Codeshare flight, operated by Gol.(G3 2007) |
Mi,Do
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Valid until 2024-01-03 Codeshare flight, operated by Gol.(G3 2007) |
Do,Sa
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-01-04 through 2024-01-06 Codeshare flight, operated by Gol.(G3 2007) |
Mo-Fr
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-01-05 through 2024-01-11 Codeshare flight, operated by Gol.(G3 2007) |
Mo-Fr
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-01-12 through 2024-01-25 Codeshare flight, operated by Gol.(G3 2007) |
Sa
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-01-13 through 2024-01-20 Codeshare flight, operated by Gol.(G3 2007) |
Fr,Sa
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-01-26 through 2024-01-27 Codeshare flight, operated by Gol.(G3 2007) |
Mo-Do
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-01-29 through 2024-02-05 Codeshare flight, operated by Gol.(G3 2007) |
Di,Mi
06:10
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-02-13 through 2024-02-14 Codeshare flight, operated by Gol.(G3 2007) |
Mo,Di,Fr,Sa
06:15
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-02-19 through 2024-03-05 Codeshare flight, operated by Gol.(G3 2007) |
Mo-Sa
06:15
Vitoria (VIX)
07:20
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-03-06 through 2024-03-30 Codeshare flight, operated by Gol.(G3 2007) |
Täglich
07:50
Vitoria (VIX)
08:55
Galeao-A.C. Jobim, Rio de Janeiro (GIG) 2 AR 7479 Non-stop Boeing 737-800 (738) 1:05 Effective from 2024-03-31 Codeshare flight, operated by Gol.(G3 1803) |